Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has been utilized to examine the foremost group of risk factors by Mean Score Technique (MS) and ranking from top to bottom. The risk factors of tendering phase analysis by using relative Importance Index (RII) method then ranking from top to bottom using their values. Consequences of this research article assessed that the technical criterion is the most efficient criteria at last, management criteria with all risk factors that showed in this research will be considered.
Environmental stress affects the yield of sorghum. This impact can be reduced by seed stimulation technique and determining the appropriate planting date. An experiment was conducted in the spring and fall seasons of 2022. Randomized complete block design with split-plot arrangement in four replications was used. Planting dates (spring season: February 15th, March 1st, 15th, April 1st, 15th; fall season: June 15th, July 1st, 15th, August 1st, 15th) were assigned to the main plots. Seed stimulation treatments (banana peel extract 35% + citric acid 100 mg L-1 and soaking in distilled water only) were applied to the subplots. The interaction treatment of soaking with banana peel extract + citric acid and the planting date of April 15th showed
... Show MoreIn this paper, estimation of system reliability of the multi-components in stress-strength model R(s,k) is considered, when the stress and strength are independent random variables and follows the Exponentiated Weibull Distribution (EWD) with known first shape parameter θ and, the second shape parameter α is unknown using different estimation methods. Comparisons among the proposed estimators through Monte Carlo simulation technique were made depend on mean squared error (MSE) criteria
Preparation and Identification of some new Pyrazolopyrin derivatives and their Polymerizations study