The aim of this research is to apply Throughput Accounting in improving the cost leadership strategy for the woven fabric department (polyester blended - polyester 150/1) in the Waist Textile and Knitting Factory. The problem of the research is that the research sample laboratory does not apply modern cost management methods represented in Throughput Accounting, as the Iraqi economic units suffer from their inability to compete in the labor market in light of the competitive environment. The Ministry of Interior improved the cost leadership strategy for the product of blended polyester and polyester fabrics 1/150. Through the research, a set of conclusions was reached, the most important of which are: Improving the cost lea
... Show Moreالمستخلص [English] Peace-building is a science that has its foundations and needs mechanisms, components, studies and plans based on the needs of the parties responsible for achieving peace and meeting the necessary needs of conflict societies, as it has become a goal sought by many local and regional actors and parties. The State of South Africa has realized this fact and has devoted space in its conception and planning to addressing the issues of conflict and war within the framework of its unitary work.Since security and stability in general seek to create peaceful and legal means through which existing problems can be expressed and addressed. The differences have varied to build peace and create cooperation between groups and th
... Show MoreThe use of non-parametric models and subsequent estimation methods requires that many of the initial conditions that must be met to represent those models of society under study are appropriate, prompting researchers to look for more flexible models, which are represented by non-parametric models
In this study, the most important and most widespread estimations of the estimation of the nonlinear regression function were investigated using Nadaraya-Watson and Regression Local Ploynomial, which are one of the types of non-linear
... Show More
In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreThe execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman
... Show MoreGlobally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The res
In this paper, a time–space fractional order inverse source problem to determine the temperature solution and the time‐dependent source term from heat moment to the time–space fractional heat equation with an initial condition, homogeneous Dirichlet boundary conditions, and integral overdetermination condition is investigated. Two unconditionally stable finite difference schemes are proposed to find a numerical solution of the direct problem. Namely, method I is based on the approximation of the time‐fractional derivative via Laplace transformation, whereas method II is based on finite difference approximation. The inverse problem is solved iteratively