Android OS is developing very fast, and because of being an open source OS, it is vulnerable to many problems that are manifested to users directly or indirectly. Poor application launch time is one of these problems. In this paper, a set of sixteen experiments is established to distinguish the factors that have the most evident effects on application launch time in Android mobiles. These factors are application, launch and kill, events, and storage. Mann Kendall (MK) test, one way analysis of variance (ANOVA), and Design of Experiment (DOE) are used to prove the influence of factors statistically. As a result of the experiments, the application factor, especially the third party applications level, has the most prominent effects on appl
... Show MoreThis essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was
... Show MoreThis Research aim to identify the factors affecting the strategic implementation of sewage projects and to seek to activate the real follow-up of projects to identify the factors that accompany their implementation, The study included a sample of the projects of the investment plan implemented for the Directorate General of sewage in the governorates of Iraq, which was completed during the six years period (2010-2016). The sample of the research was four projects: The project of implementation and processing of the treatment plant and the lifting station and the conveyor line for the project of IMARA/The third stage/Al-Sanaf marshland , The project of the processing and implementation of the treatment plant with the
... Show MoreThis study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,
... Show MoreOne of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show MoreAgile methodologies are adopted extensively by many of the software industries as it is flexible in nature as well as can address the required changes in any phase of development. Authentic estimation of the software products is not an easy task as it requires continuous attention of the product owner. Effort and cost can be estimated in a proper manner to ensure the success of the project. In this article, we considered the Scrum-based Agile projects that are developed into several Sprints. We proposed an extension to an existing algorithm, based on a total of 36 success factors; that estimate the development cost and effort required to complete the project. For estimation and computations, we have taken a dataset of 12 project