The pillars of sustainable development are representing the interface between environmental, economic, and social sustainability. Sustainable development is a method of planning and managing construction projects to reduce the effect of the construction process on the environment so that there is a balance between environmental capabilities and the human needs of present and future generations. Usually, Environmental sustainability is most important and effective in construction projects. The environment suffers from significant negative impacts as a result of the implementation of construction projects; therefore, this study aims to identify the effecting factors on environmentally sustainable development. The methodology of this study used fuzzy cognitive maps (FCMs) because of adopted simulation approach, after selecting the factors that have RII more than 65% and determine causal relationship between factors by applying fuzzy logic using MATLAB program. Then the effecting factors were analyzed and ranked by static and dynamic analysis. The results showed the static analysis of effecting factors on ESD in first quarter are characterized by influential and affected by other factors of (ESD), were include (C2.4, C4.6, C1.6, C2.1, C3.3, C3.7, C3.6, C6.2), When comparing between dynamic analysis and RII of the factors, it has been noticed a difference in the importance. This is an essential finding in the understanding that dynamic analysis considers the interactions between factors, while the RII takes the reasons independently and neglects interactions between them. The study has provided recommendations for the application of (FCM) model that was proposed depend on these factors in building projects to improve the environment and reduce its negative effects.
The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi
... Show MoreGrass trimming operation is widely done in Malaysia for the purpose of maintaining highways. Large number of operators engaged in this work encounters high level of noise generated by back pack type grass trimmer used for this purpose. High level of noise exposure gives different kinds of ill effect on human operators. Exact nature of deteriorated work performance is not known. For predicting the work efficiency deterioration, fuzzy tool has been used in present research. It has been established that a fuzzy computing system will help in identification and analysis of fuzzy models fuzzy system offers a convenient way of representing the relationships between the inputs and outputs of a system in the form of IF-THEN rules. The paper presents
... Show MoreThis research is considered a simple attempt and effort which is it first and last target is to point at the procedures of the taxes account that aims to reduce the taxes from the persons and give free to the person who estimates the tax to practice what comes from the competent authorities to describe the person who estimates the tax and not an accountant who practice the accountant procedures which are imposed on him by the annual terms from higher administrations , So he can not evaluate state of the person who pay the tax , and he might be dissatisfied with his job , because his role can’t be activated from the general foundation taxes.
And so , this research includes four fields:-
... Show MoreThe quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA
Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MorePurpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d
... Show More