The risk assessment for three pipelines belonging to the Basra Oil Company (X1, X2, X3), to develop an appropriate risk mitigation plan for each pipeline to address all high risks. Corrosion risks were assessed using a 5 * 5 matrix. Now, the risk assessment for X1 showed that the POF for internal corrosion is 5, which means that its risk is high due to salinity and the presence of CO, H2S and POF for external corrosion is 1 less than the corrosion, while for Flowline X2 the probability of internal corrosion is 4 and external is 4 because there is no Cathodic protection applied due to CO2, H2S and Flowline X3 have 8 leaks due to internal corrosion so the hazard rating was very high 5 and could be due to salinity, CO2, fluid flow rate and water cuts. External corrosion hazard rating 4 is considered high because there is no coating, no cathodic protection is applied.
The Turonian-Lower Companian succession at Majnoon Oil Field is represented by the Khasib, Tanuma, and Saadi formations. Four major paleoenvironments were recognized within the studied succession, there are: Shallow open marine environment, shoal environment, deep marine environment, and basinal environment. They reflect deposition on a carbonate platform of homoclinal ramp setting. The studied succession represents two second order supersequences (A) and (B). Supersequence (A) includes both the Khasib and Tanuma formations. The Saadi Formation represents cycle (B). These second order cycles can be divided each into two third order cycles, This subdivision may reflect the effect of eustacy being the major controlling factor of cycles dev
... Show MoreThe work presented in this paper is a case study of the southeastern Iraqi Fauqi Oil Field to evaluate both the petrophysical properties and lithology of the Jeribe–Euphrates Formations. Reservoir characterization was performed using well log data, including Gamma Ray (GR), Density (RHOB), Neutron (NPHI), Sonic (DT), Spontaneous Potential (SP), and resistivity logs. Data processing, correction, and interpretation were conducted using Interactive Petrophysics (IP) software. The Gamma Ray method was used to estimate shale volume (Vsh), while porosity was calculated using various methods, with the neutron–density combination providing reliable results. To determine water saturation (Sw), the Archie equation was applied using common
... Show MoreThe process of risk assessment in the build-operate transfer (BOT) project is very important to identify and analyze the risks in order to make the appropriate decision to respond to them. In this paper, AHP Technique was used to make the appropriate decision regarding response to the most prominent risks that were generated in BOT projects, which includes a comparison between the criteria for each risk as well as the available alternatives and by mathematical methods using matrices to reach an appropriate decision to respond to each risk.Ten common risks in BOT contracts are adopted for analysis in this paper, which is grouped into six main risk headings.The procedures followed in this paper are the questionnaire method
... Show MoreThe petrophysical analysis is very important to understand the factors controlling the reservoir quality and production wells. In the current study, the petrophysical evaluation was accomplished to hydrocarbon assessment based on well log data of four wells of Early Cretaceous carbonate reservoir Yamama Formation in Abu-Amood oil field in the southern part of Iraq. The available well logs such as sonic, density, neutron, gamma ray, SP, and resistivity logs for wells AAm-1, AAm-2, AAm-3, and AAm-5 were used to delineate the reservoir characteristics of the Yamama Formation. Lithologic and mineralogic studies were performed using porosity logs combination cross plots such as density vs. neutron cross plot and M-N mineralogy plot. Thes
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show Moreيتنامى يوما بعد يوم استخدام السيارات وتتعاضم اعدادها ، فهذا هو عصر السرعة، وخاصة في مجال النقل والمواصلات، والتي تتحقق باستخدام وسائل النقل المختلفة ومن بينها السيارات، وبالتالي اصبحت هذه الوسيلة ضرورية لتحقيق هذه السرعة ومن ضرورات الحياة في انجاز الاعمال.
وتتبارى مصانع السيارات فيما بينها لانتاج انواع السيارات بمواصفات عالية من المتانة والامان والراحة، وفي ذات الوقت اصبحت هندسة الطرق
... Show More