Highway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases the shear strength of the soil depending on the soil type, void ratio, etc. This paper studies the slope stability of highway embankment using finite element method analysis to show the effect of the presence of water table and the contribution of the matric suction. A trial slope is shown to have same factor of safety with reduced cross section due to increasing the shear strength hence, reducing the cross-sectional cost is determined.
Multiple myeloma (MM) is a heterogenous plasma cell malignancy with various complications. Sclerostin is a Wingless-type (Wnt) inhibitor specifically expressed by osteocytes; it acts as a negative regulator of bone formation.
To assess plasma sclerostin level in MM patients and find its correlations with clinical and laboratory data, including osteolytic bone disease and international staging system (ISS).
This cr
The present study dealt with the removal of methylene blue from wastewater by using peanut hulls (PNH) as adsorbent. Two modes of operation were used in the present work, batch mode and inverse fluidized bed mode. In batch experiment, the effect of peanut hulls doses 2, 4, 8, 12 and 16 g, with constant initial pH =5.6, concentration 20 mg/L and particle size 2-3.35 mm were studied. The results showed that the percent removal of methylene blue increased with the increase of peanut hulls dose. Batch kinetics experiments showed that equilibrium time was about 3 hours, isotherm models (Langmuir and Freundlich) were used to correlate these results. The results showed that the (Freundlich) model gave the best fitting for adsorption capacity. D
... Show MoreThere are many problems facing the economic entities as a result of its mass production &variation of its products , the matter which had increased the need & importance of cost accounting which is regarded a main tool for the managerial control.
The actual costing system is unable to meet the contemporary management needs ,so the Standard costing system appear to provide the management with required information to perform its functions by the best use& way.
This research aims to determine the standard cost for the direct material for oil extraction activity by applying it in the north oil company.
The aim of this research is to apply Throughput Accounting in improving the cost leadership strategy for the woven fabric department (polyester blended - polyester 150/1) in the Waist Textile and Knitting Factory. The problem of the research is that the research sample laboratory does not apply modern cost management methods represented in Throughput Accounting, as the Iraqi economic units suffer from their inability to compete in the labor market in light of the competitive environment. The Ministry of Interior improved the cost leadership strategy for the product of blended polyester and polyester fabrics 1/150. Through the research, a set of conclusions was reached, the most important of which are: Improving the cost lea
... Show MoreMonetary policy occupies a prominent role in achieving monetary stability by adjusting the growth rates of the number of available means of payment in line with changes in the size of the gross domestic product in the country and expressed by the monetary stability coefficient agreed upon by the International Monetary Fund, a term that hides the fact that there is a rate of change in the volume of commodity or real production which expresses the levels of aggregate supply in the economy, which corresponds to the quantities of cash in circulation, which represent a net purchasing power and stimulate aggregate demand, which completes the picture of the existence of the market mechanism, expressed by the monetary or economic stability
... Show MoreThis research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re
... Show MoreRecently, there has been a major trend towards environmental issues and concern for the green product because traditional products cause serious environmental impacts such as reduced resources, global warming, energy consumption, emissions and other environmental damage. Under these developments, economic units are looking for cost-effective technologies that reduce the cost of a green product that has four main dimensions: reducing energy, reducing resource consumption, preventing pollution, and using renewable energy while not compromising quality and satisfying customers in order to enhance competitive advantage.
This research will address one of the most important cost-effective green technologies, Gr
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More