Preferred Language
Articles
/
DxdEso0BVTCNdQwC2Rns
Determination of time-dependent coefficient in inverse coefficient problem of fractional wave equation
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Wed Apr 20 2022
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
A New Approach to Solving Linear Fractional Programming Problem with Rough Interval Coefficients in the Objective Function
...Show More Authors

This paper presents a linear fractional programming problem (LFPP) with rough interval coefficients (RICs) in the objective function. It shows that the LFPP with RICs in the objective function can be converted into a linear programming problem (LPP) with RICs by using the variable transformations. To solve this problem, we will make two LPP with interval coefficients (ICs). Next, those four LPPs can be constructed under these assumptions; the LPPs can be solved by the classical simplex method and used with MS Excel Solver. There is also argumentation about solving this type of linear fractional optimization programming problem. The derived theory can be applied to several numerical examples with its details, but we show only two examples

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Dec 04 2014
Journal Name
Engineering And Technology Journal
Optimization of the Time Required for Determination of the Total Dissolved Salts in Soil ‫
...Show More Authors

Publication Date
Sat Oct 01 2022
Journal Name
Baghdad Science Journal
Determination of Optimal Time-Average Wind Speed Data in the Southern Part of Malaysia
...Show More Authors

Mersing is one of the places that have the potential for wind power development in Malaysia. Researchers often suggest it as an ideal place for generating electricity from wind power. However, before a location is chosen, several factors need to be considered. By analyzing the location ahead of time, resource waste can be avoided and maximum profitability to various parties can be realized. For this study, the focus is to identify the distribution of the wind speed of Mersing and to determine the optimal average of wind speed. This study is critical because the wind speed data for any region has its distribution. It changes daily and by season. Moreover, no determination has been made regarding selecting the average wind speed used for w

... Show More
View Publication Preview PDF
Scopus (8)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Apr 01 2020
Journal Name
Isa Transactions
Design of a Complex fractional Order PID controller for a First Order Plus Time Delay system
...Show More Authors

View Publication
Scopus (42)
Crossref (35)
Scopus Clarivate Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Jordan Journal Of Physics
Theoretical Simulation of Backscattering Electron Coefficient for SixGe1-x/Si Heterostructure as a Function of Primary Electron Beam Energy and Ge Concentration
...Show More Authors

Abstract: This study aims to investigate the backscattering electron coefficient for SixGe1-x/Si heterostructure sample as a function of primary electron beam energy (0.25-20 keV) and Ge concentration in the alloy. The results obtained have several characteristics that are as follows: the first one is that the intensity of the backscattered signal above the alloy is mainly related to the average atomic number of the SixGe1-x alloy. The second feature is that the backscattering electron coefficient line scan shows a constant value above each layer at low primary electron energies below 5 keV. However, at 5 keV and above, a peak and a dip appeared on the line scan above Si-Ge alloy and Si, respectively, close to the interfacing line

... Show More
View Publication
Scopus (1)
Scopus Clarivate Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Compare Estimate Methods of Parameter to Scheffʼe Mixture Model By Using Generalized Inverse and The Stepwise Regression procedure for Treatment Multicollinearity Problem
...Show More Authors

Mixture experiments are response variables based on the proportions of component for this mixture. In our research we will compare the scheffʼe model with the kronecker model for the mixture experiments, especially when the experimental area is restricted.

     Because of the experience of the mixture of high correlation problem and the problem of multicollinearity between the explanatory variables, which has an effect on the calculation of the Fisher information matrix of the regression model.

     to estimate the parameters of the mixture model, we used the (generalized inverse ) And the Stepwise Regression procedure

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon May 01 2023
Journal Name
Periodicals Of Engineering And Natural Sciences
Solving the multi-criteria: total completion time, total late work, and maximum earliness problem
...Show More Authors

Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic

... Show More
View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Thu Sep 01 2022
Journal Name
Iaes International Journal Of Robotics And Automation
Implementation of a complex fractional order proportional-integral-derivative controller for a first order plus dead time system
...Show More Authors

This paper presents the implementation of a complex fractional order proportional integral derivative (CPID) and a real fractional order PID (RPID) controllers. The analysis and design of both controllers were carried out in a previous work done by the author, where the design specifications were classified into easy (case 1) and hard (case 2) design specifications. The main contribution of this paper is combining CRONE approximation and linear phase CRONE approximation to implement the CPID controller. The designed controllers-RPID and CPID-are implemented to control flowing water with low pressure circuit, which is a first order plus dead time system. Simulation results demonstrate that while the implemented RPID controller fails to stabi

... Show More
Publication Date
Sat Sep 28 2024
Journal Name
Journal Of The Pakistan Medical Association
Pulse transmission time and amplitude of digital pulse wave determined by fingertip plethysmography as a surrogate marker of brachial artery flowmediated dilatation
...Show More Authors

Objectives: To assess the changes in blood vessel stiffness and digital pulse wave amplitude because of flowmediateddilatation, and to explore how these two variables change when endothelial dysfunction isexperimentally induced.Method: The experimental study was conducted at the departments of physiology at the College of Medicine,Mustansiriyah University, and the College of Medicine, Al-Iraqia University, Baghdad, Iraq, from October 14, 2021, toMay 31, 2022, and comprised healthy young males who were subjected to the flow-mediated dilatation techniqueon the left brachial artery. Pulse transit time and the amplitude of the digital pulse wave were measured duringreactive hyperaemia for 2.5 minutes from the left middle finger using a

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Clarivate Crossref