Preferred Language
Articles
/
DxcPZpIBVTCNdQwCjq-R
Finite Time Disturbance Observer Based on Air Conditioning System Control Scheme
...Show More Authors

A novel robust finite time disturbance observer (RFTDO) based on an independent output-finite time composite control (FTCC) scheme is proposed for an air conditioning-system temperature and humidity regulation. The variable air volume (VAV) of the system is represented by two first-order mathematical models for the temperature and humidity dynamics. In the temperature loop dynamics, a RFTDO temperature (RFTDO-T) and an FTCC temperature (FTCC-T) are designed to estimate and reject the lumped disturbances of the temperature subsystem. In the humidity loop, a robust output of the FTCC humidity (FTCC-H) and RFTDO humidity (RFTDO-H) are also designed to estimate and reject the lumped disturbances of the humidity subsystem. Based on Lyapunov theory, the stability proof of the two closed-loop controllers and observers is presented. Comparative simulations are carried out to confirm that the proposed controller outperforms conventional methods and offers greater accuracy of temperature, humidity, and carbon dioxide concentration, having superior regulation performance in terms of a rapid finite time convergence, an outstanding disturbance rejection property, and better energy consumption. In addition to presenting the comparative simulation results from the control applications on the VAV system, the quantitative values are provided to further confirm the superiority of the proposed controller. In particular, the proposed method exhibits the shortest settling time of, respectively, 15 and 40 min to reach the expected temperature and humidity, whereas other comparative controllers require a longer time to settle down.

Scopus Clarivate Crossref
View Publication
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
Comparison of Single and Group Bored Piles Settlement Based on Field Test and Theoretical Methods
...Show More Authors

 Bored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Fri Mar 31 2017
Journal Name
Journal Of Engineering
Cultivation of Chlorella Vulgaris Using Airlift Photobioreactor Sparged with 5%CO 2 -Air as a Biofixing Process
...Show More Authors

The present paper addresses cultivation of Chlorella vulgaris microalgae using airlift photobioreactor that sparged with 5% CO 2 /air. The experimental data were compared with that obtained from bioreactor aerated with air and unsparged bioreactor. The results showed that the concentration of biomass is 0.36 g l -1  in sparged bioreactor with CO2/air, while, the concentration of biomass reached to 0.069 g l -1  in the unsparged bioreactor. They showed also that aerated  ioreactor.with CO2/air gives more biomass production even the bioreactor was aerated with air. This study proved that application of sparging system for  ultivation of Chlorella vulgaris microalgae using either CO2/air mixture or air has a significant

... Show More
View Publication Preview PDF
Publication Date
Sun Mar 30 2008
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
A Quantitative Analysis of the Mixing of Three Solids Different in Density by an Air Fluidized Bed
...Show More Authors

Three cohesionless free flowing materials of different density were mixed in an air fluidized bed to study the mixing process by calculating performance of mixing index according to Rose equation (1959) and to study the effect of four variables (air velocity, mixing time, particle size of trace component and concentration of trace component) on the mixing index and as well as on mixing performance. It was found that mixing index increases with increasing the air velocity, mixing time and concentration of trace component until the optimum value. Mixing index depends on the magnitude of difference in particle size The first set of experiments (salt then sand then cast iron) give higher mixing index and better performance of mixing than the

... Show More
View Publication Preview PDF
Publication Date
Sun Jun 01 2025
Journal Name
Chemical Engineering And Processing - Process Intensification
Wastewater treatment through a hybrid electrocoagulation and electro-Fenton process with a porous graphite air-diffusion cathode
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sun Jun 01 2025
Journal Name
Chemical Engineering And Processing - Process Intensification
Wastewater treatment through a hybrid electrocoagulation and electro-Fenton process with a porous graphite air-diffusion cathode
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sun Jun 01 2025
Journal Name
Chemical Engineering And Processing - Process Intensification
Wastewater treatment through a hybrid electrocoagulation and electro-Fenton process with a porous graphite air-diffusion cathode
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sun Jun 02 2013
Journal Name
Baghdad Science Journal
Design and Construction Optical Pumping System
...Show More Authors

In this work the design and construction of optical pumping system was presented. The parameters of the pumping source to obtain discharge current density sufficient to shift the flash lamp spectrum towards uv portion of spectrum were measured.The current density was supplied to the flash lamp must be greater than 4000Amp./cm2 to obtain the spectral range wavelength lies between 0.2 and 0.35?m. The current density was obtained by a capacitor 50?F, at 7KV discharge voltage. The applied electrical energy to the flash lamp was more than 1200 J, and the current density was around 5000 Amp./cm2.The electrical parameters of the flash lamp were calculated. The impedance parameters(K0) from the voltage and the peak current pulse was measured in ran

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 27 2018
Journal Name
Iraqi Journal Of Science
Accurate Three Dimensional Coordinates Measurements Using Differential GPS Real Time Kinematic Mode
...Show More Authors

The accurate 3-D coordinate's measurements of the global positioning systems are essential in many fields and applications. The GPS has numerous applications such as: Frequency Counters, Geographic Information Systems, Intelligent Vehicle Highway Systems, Car Navigation Systems, Emergency Systems, Aviations, Astronomical Pointing Control, and Atmospheric Sounding using GPS signals, tracking of wild animals, GPS Aid for the Blind, Recorded Position Information, Airborne Gravimetry and other uses. In this paper, the RTK DGPS mode has been used to create precise 3-D coordinates values for four rover stations in Baghdad university camp. The HiPer-II Receiver of global positioning system was used to navigate the coordinate value. The results wil

... Show More
View Publication Preview PDF
Scopus (3)
Scopus Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Tribology International
Discriminating gasoline fuel contamination in engine oil by terahertz time-domain spectroscopy
...Show More Authors

View Publication
Scopus (17)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref