One of the key challenges is reliable communication for Unmanned Underwater Vehicles (UUVs) since underwater environments are dynamic and challenging for signal transmission. The traditional acoustic communication systems allow long-distance communication but are limited by the low bandwidth, high latency, and doppler effect. Optical wireless, on the other hand, provides high data rates with water absorption and scattering occurring within the transmission distance, but has a short range of communication. To overcome these drawbacks, a smart hybrid optical-acoustic communication system is proposed that is a combination of Wavelength Division Multiplexing and On-Off Keying (WDM-OOK) to transmit a high-speed signal over optical and acoustic channels to achieve high reliability of long-range communication. The design of an intelligent hybrid optical–acoustic communications network to improve the continuity, reliability, and throughput of the communication between a UUV system is the focus of this research. It is a combination of a simple model of Multilayer Perceptron (MLP), a real-time communication mode switch, an optical subsystem (Wavelength Division Multiplexing On–Off Keying (WDM-OOK)), and an acoustic communication subsystem. The system has been modelled and simulated in MATLAB/Simulink and synthesized in HDL Coder as it will be implemented on an FPGA (Kintex-7 325T). The results of the simulations validate the superiority of the proposed hybrid method (hybrid with AI) over the purely optical method, the purely acoustic method, and the hybrid method without AI. The minimum BER recorded on this platform was (10-7), the average throughput was 152 Mbps, and the end-to-end latency time was 12.7ms with good water clarity. The FPGA synthesis results also show that the model was appropriate for real-time implementation with only 18.1% of the LUTs, 10.5% of the flip-flops, 23.6% of the BRAMs, and 17.4% of the DSPs utilized for the Kintex-7 325T FPGA. The results verified the feasibility of the proposed hybrid optical–acoustic communication system, where the high-speed feature of using the optical communication WDM-OOK system and the robustness of the acoustic communication system are provided by the intelligent adaptive switching. The proposed framework is feasible and is scalable for underwater reliable real-time communication between unmanned optical vehicles (UOVs) in underwater unmanned vehicle networks (UUVnets) in the near future.
Face recognition and identity verification are now critical components of current security and verification technology. The main objective of this review is to identify the most important deep learning techniques that have contributed to the improvement in the accuracy and reliability of facial recognition systems, as well as highlighting existing problems and potential future research areas. An extensive literature review was conducted with the assistance of leading scientific databases such as IEEE Xplore, ScienceDirect, and SpringerLink and covered studies from the period 2015 to 2024. The studies of interest were related to the application of deep neural networks, i.e., CNN, Siamese, and Transformer-based models, in face recogni
... Show MoreAverage per capita GDP income is an important economic indicator. Economists use this term to determine the amount of progress or decline in the country's economy. It is also used to determine the order of countries and compare them with each other. Average per capita GDP income was first studied using the Time Series (Box Jenkins method), and the second is linear and non-linear regression; these methods are the most important and most commonly used statistical methods for forecasting because they are flexible and accurate in practice. The comparison is made to determine the best method between the two methods mentioned above using specific statistical criteria. The research found that the best approach is to build a model for predi
... Show MoreThis paper presents an experimental study of cooling photovoltaic (PV) panels using evaporative cooling. Underground (geothermal energy) water used to extract heat from it during cooling and cleaning of PV panels. An experimental test rig was constructed and tested under hot and dusty climate conditions in Baghdad. An active cooling system was used with auxiliary an underground water tank to provide cold water as a coolant over both PV surfaces to reduce its temperature. The cellulose pad has been arranged on the back surface and sprays cooling on the front side. Two identical PV panels modules used: without cooling and evaporative water cooling. The experiments are comprised of four cases: Case (I): backside cooling, Ca
... Show MoreTight reservoirs have attracted the interest of the oil industry in recent years according to its significant impact on the global oil product. Several challenges are present when producing from these reservoirs due to its low to extra low permeability and very narrow pore throat radius. Development strategy selection for these reservoirs such as horizontal well placement, hydraulic fracture design, well completion, and smart production program, wellbore stability all need accurate characterizations of geomechanical parameters for these reservoirs. Geomechanical properties, including uniaxial compressive strength (UCS), static Young’s modulus (Es), and Poisson’s ratio (υs), were measured experimentally using both static and dynamic met
... Show MoreIn this work Laser wireless video communication system using intensity modualtion direct
detection IM/DD over a 1 km range between transmitter and receiver is experimentally investigated and
demonstrated. Beam expander and beam collimeter were implemented to collimete laser beam at the
transmitter and focus this beam at the receiver respectively. The results show that IM/DD communication
sysatem using laser diode is quite attractive for transmitting video signal. In this work signal to noise
ratio (S/N) higher than 20 dB is achieved in this work.
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More