Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction costs for diversion works which is solved by PSO method using MATLAB. The optimization model was applied to prepare the optimal design graphs.It can be noticed, at any design flowrate, optimalwater flow depth, bed width, and height of upstream and downstream cofferdams decrease with increase of the side-slope. Also, it can be observed, at any design flowrate, the construction cost increases with increase of the side-slope.
This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show MoreFive sites were chosen to the north of Babil Governorate in order to identify the limnological features and the impact of the Hindiya Dam during 2019. Site2 was located near the dam to reflect the ecological features of this site, whereas other sites, S1 was located at the upstream of the dam as a control site. Moreover, the two other sites S3 and S4 were located down the dam. The results of the study showed a close correlation between air and water temperature at all sites. Also there were significant differences in average of thirteen out of eighteen water parameters.Water temperature, total alkalinity, bicarbonate, DO, POS, TH and Mg+2 ions decreased from 22.76˚C, 203.33 mg/L,
... Show MoreThe construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.
The question is, was the optimum implementation accomplished? The provision for the success of the project
... Show MoreIn globalization, the world became open area to competition for the attractive of investment, and the abilities of each country to win the confidence of investors depend upon the preparation to optimize circumstances. The competitiveness is an essential means of expanding the capacity of developed to coexist in an international environment characterized by globalization. While competition describes the market structure, the behavior of investors and business, competitiveness is interested in the evaluation of business performance or countries and compare them in the conditions of competition available in these markets. Regarding Malaysia, which is depend on FDI-Export- Led Growth strategy, it has taking on diffe
... Show MoreThe problem of housing in Iraq is a long-rooted and rooted problem, and it needs a great effort to find out its causes and thus give essential points that contribute to alleviating and addressing it, and it is worth noting that research into the housing problem and the housing sector in Iraq is not done in isolation from other sectors and studies. As well as the economic policies pursued and the social and political conditions. It is known that the Iraqi economy is a unilateral (rentier) economy, that is, it depends almost entirely on exporting oil and obtaining revenues, and that the economic decision and economic policies followed in Iraq are greatly affected by several factors, including the economic, social and political fact
... Show MoreBackground: Many countries recommend the use of long-acting reversible contraceptive intrauterine device immediately after cesarean delivery. The cesarean delivery rate in Iraqi public hospitals is 32.2% and may reach 85.8% in private hospitals. Immediate post-partum intrauterine device insertion at cesarean is rarely done in Iraq.
Objectives: To assess the safety and practicality of immediate post-partum intrauterine device insertion during cesarean delivery for family planning and pregnancy spacing in Iraqi women.
Subjects and Methods: A single arm clinical trial included 150 eligible women who attended Al-Elwiyah Maternity Teaching Hospital or Al Hayat Rahibat Hospita
... Show MoreActive worms have posed a major security threat to the Internet, and many research efforts have focused on them. This paper is interested in internet worm that spreads via TCP, which accounts for the majority of internet traffic. It presents an approach that use a hybrid solution between two detection algorithms: behavior base detection and signature base detection to have the features of each of them. The aim of this study is to have a good solution of detecting worm and stealthy worm with the feature of the speed. This proposal was designed in distributed collaborative scheme based on the small-world network model to effectively improve the system performance.
This research presents a model for surveying networks configuration which is designed and called a Computerized Integrated System for Triangulation Network Modeling (CISTNM). It focuses on the strength of figure as a concept then on estimating the relative error (RE) for the computed side (base line) triangulation element. The CISTNM can compute the maximum elevations of the highest
obstacles of the line of sight, the observational signal tower height, the contribution of each triangulation station with their intervisibility test and analysis. The model is characterized by the flexibility to select either a single figure or a combined figures network option. Each option includes three other implicit options such as: triangles, quadri