Inundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the river valley. Throughapplied numerical model of the Nile River in the area between the Roseires dam and Khartoum is distance (630 km) south of Khartoum , to get a jest analysis of the impact of a wave of flooding in the river on the following parameters : the maximum discharge , the maximum of attributed, as underdevelopment of the discharge maximum , and the time defaults to the maximum level and the surface area on the banks of the river and its extension and different values of the coefficient of manning roughness to the banks of the river. Eight scenario have been prepared for the flood wave read to compare the effect amount of water flow in the channel resulting from the collapse of the dam was resulting of Roseires dam , eight scenario to represent the five and extract the resulting values of Inundation map to cities located on the downstream of the dam.Thefive scenarioswerecalculated by using (HEC-RAS 4.1.0), (HEC-GeoRAS)a GIS programs and the flood wave resulting from the collapse of the Roseires dam to compare the results showed that the scenario NO. 5 is the best scenario result from the collapse makes sense due to the form of the disposal of the flood wave resulting from the collapse of the Roseires dam and then get overtopping from Sennar dam to the inability of the reservoir and dam to stop the flood wave. The results also indicate that the time needed to reach the greatest discharge of the flood wave resulting from the collapse of the Roseires dam to the city of Khartoum is ( 4, 6, 7and 9 ) day on the cities ( Roseires , Sennar , Wad Medani and Khartoum ) respectively, of the cases . The maximum height of the flood wave reaching the city of Khartoum has given the scenario NO. 5 by height wave (3-50) meters respectively. As well as the delay in the arrival time of the maximum height of the flood wave to the city of Khartoum is one day for the five scenarios compared to the other. The Inundation map development resulting from the collapse of the Roseires dam and get the flow overtopping the Sennar dam, arrival to Khartoum, was determined the surface area of the affected river and both banks of the depth of the wave and latency along the river has been selected four major cities along the river which Roseires,Sennar, Wad Medani and Khartoum.
This work focused on principle of higher order mode excitation using in- line Double Clad Multi-Mode Mach-Zehnder Interferometer (DC-MM-MZI). The DC-MM-MZI was designed with 50 cm etched MMF. The etching length is 5cm. The tenability of this interferometer was studied using opt grating ver.4.2.2 and optiwave
ver. 7 simulator. After removing (25, 35, 45, 55) μm from MMF and immersing this segment of MMF with water bath contained distilled water and ethanol, in addition to, air. Pulsed laser source centered at 1546.7nm ,pulse width 10ns and peak power 1.33mW was propagated via this interferometer Maximum modes were obtained in case of air surrounded media which are 9800 and 25 um removed cladding layer, with peak power 49.800 m
Abstract To ensure that the distribution system has safe drinking water. It is necessary to know the residual chlorine concentrations at various points in the network. A chlorine photometer device was used to measure twenty points taken every day for a week at a selected time in the distribution system. Both pressures and flows in the network were measured using bourdon gauge and Tuf-2000H Handheld Digital ultrasonic flow meters. WaterGEMS CONNECT Edition update one software was used to simulate the flow in the network. The Baghdad water department provided the data about the network, such as the lengths of pipes, the layout of the network, and pipes diameters. The network calibrated consists of 781 pipes of different lengths and 542 juncti
... Show MoreRenewable energy technology is growing fast especially photovoltaic (PV) system to move the conventional electricity generation and distribution towards smart grid. However, similar to monthly electricity bill, the PV energy producers can only monitor their energy PV generation once a month. Any malfuntion in PV system components may reduce the performance of the system without notice. Thus, developing a real-time monitoring system of PV production is very crucial for early detection. In addition, electricity consumption is also important to be monitored more frequently to increase energy savings awareness among consumers. Hardware based Internet-of-Thing (IoT) monitoring and control system is widely used. However, the implementation of
... Show MoreSimulation of free convection heat transfer in a square enclosure induced by heated thin plate is represented numerically. All the enclosure walls have constant temperature lower than the plate’s temperature. The flow is assumed to be two-dimensional. The discretized equations were solved stream function, vorticity, and energy equations by finite difference method using explicit technique and Successive Over- Relaxation method. The study was performed for different values of Rayleigh number ranging from 103 to 105 for different angle position of heated thin plate(0°, 45°, 90°). Air was chosen as a working fluid (Pr = 0.71). Aspect ratio of center of plate to the parallel left wall A2
... Show MoreThe aim of this paper is to estimate the concentrations of some heavy metals in Mohammed AL-Qassim Highway in Baghdad city for different distances by using the polynomial interpolation method for functions passing from the data, which is proposed by using the MATLAB software. The sample soil in this paper was taken from the surface layer (0-25 cm depth) at the two sides of the road with four distances (1.5, 10, 25 and 60 m) in each side of the road. Using this method, we can find the concentrations of heavy metals in the soil at any depth and time without using the laboratory, so this method reduces the time, effort and costs of conducting laboratory analyzes.
The Gas Assisted Gravity Drainage (GAGD) process has become one of the most important processes to enhance oil recovery in both secondary and tertiary recovery stages and through immiscible and miscible modes. Its advantages came from the ability to provide gravity-stable oil displacement for improving oil recovery, when compared with conventional gas injection methods such as Continuous Gas Injection (CGI) and Water – Alternative Gas (WAG). Vertical injectors for CO2 gas were placed at the top of the reservoir to form a gas cap which drives the oil towards the horizontal oil producing wells which are located above the oil-water-contact. The GAGD process was developed and tested in vertical wells to increase oil r
... Show MoreBiosorpion of lead (Pb), Cadmium (Cd) and Nickl(Ni) by dried biomass of Chara sp. for sample of BMP was used as alternative approach of conventional method. The range of removal percentages was between 92-97%, 70-98.7% and 46.6-96.6% for Pb, Cd and Ni respectively at 3h.Treatment time, with 300-500 mg dried weight from Chara sp. powder at pH 4, with 60 rpm at shaker. FTIR analysis showed the active groups which are responsible for sequestration of heavy metals represented by carboxyl, hydroxyl alkyl, amine and amide. The Biosorption equilibrium experiment for elements showed that the highest sorption percentage for three elements was, Pb 96.6% after 30 minute, for Cd was 100% after 15 minute and 40% to Ni after 75 minute, while the biosorp
... Show More