The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.
Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in
... Show MoreThis study was conducted according to contract with the North Refineries Company-Baiji and deals with the hydrodesulphurization of vacuum gas oil of Kirkuk crude oil, boiling range 611-833 K. A trickle bed reactor packed with a commercial cobalt-molybdenum on alumina catalyst was used. The operating conditions were: temperature range 583-643 K, liquid hourly space velocity range 1.50-3.75 1/h, hydrogen to oil ratio about 250 l/l and pressure kept constant at 3.5MPa.
The results showed that the aromatic content decreased and sulfur removal increased with increasing temperature and decreasing space velocity. The properties (viscosity, density, flash point and carbon residue) of the products decrease with temperature increasing, but the
The Khabour reservoir, Ordovician, Lower Paleozoic, Akkas gas field which is considered one of the main sandstone reservoirs in the west of Iraq. Researchers face difficulties in recognizing sandstone reservoirs since they are virtually always tight and heterogeneous. This paper is associated with the geological modeling of a gas-bearing reservoir that containing condensate appears while production when bottom hole pressure declines below the dew point. By defining the lithology and evaluating the petrophysical parameters of this complicated reservoir, a geological model for the reservoir is being built by using CMG BUILDER software (GEM tool) to create a static model. The petrophysical properties of a reservoir were computed using
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show MoreThis study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica
... Show MoreThe research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource man
... Show MoreThin films of Nb2O5 have been successfully deposited using the DC reactive magnetron sputtering technique to manufacture NH3 gas sensors. These films have been annealed at a high temperature of 800°C for one hour. The assessment of the Nb2O5 thin films structural, morphological, and electrical characteristics was carried out using several methods such as X-ray diffraction (XRD), atomic force microscopy (AFM), energy-dispersive X-ray spectroscopy (EDS), Hall effect measurements, and sensitivity assessments. The XRD analysis confirms the polycrystalline composition of the Nb2O5 thin films with a hexagonal crystal structure. Furthermore, the sensitivity, response time, and recovery time of the gas sensor were evaluated for the Nb2O5 thin film
... Show MoreKnowledge of the distribution of the rock mechanical properties along the depth of the wells is an important task for many applications related to reservoir geomechanics. Such these applications are wellbore stability analysis, hydraulic fracturing, reservoir compaction and subsidence, sand production, and fault reactivation. A major challenge with determining the rock mechanical properties is that they are not directly measured at the wellbore. They can be only sampled at well location using rock testing. Furthermore, the core analysis provides discrete data measurements for specific depth as well as it is often available only for a few wells in a field of interest. This study presents a methodology to generate synthetic-geomechani
... Show MoreA field experiment was conducted in Yusufiya sub-district - Mahmudiya township/Baghdad governorate in silty loam texture soil during the spring season of 2020. The experiment included three treatments with three replicates, as the Randomized Complete Block Design (RCBD) was used according to the arrangement of the split design block. The treatments are in the irrigation system, which included surface drip irrigation (T1) and sprinkler irrigation (T2). Secondly, the Irrigation levels including the irrigation using 0.70 Pan Evaporation Fraction PEF (I1), irrigation using 1.00 PEF (I2), and irrigation using 1.30 PEF (I3). Coupled with, Pota
... Show More