The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.
The aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For
... Show MoreRock mechanical properties are critical parameters for many development techniques related to tight reservoirs, such as hydraulic fracturing design and detecting failure criteria in wellbore instability assessment. When direct measurements of mechanical properties are not available, it is helpful to find sufficient correlations to estimate these parameters. This study summarized experimentally derived correlations for estimating the shear velocity, Young's modulus, Poisson's ratio, and compressive strength. Also, a useful correlation is introduced to convert dynamic elastic properties from log data to static elastic properties. Most of the derived equations in this paper show good fitting to measured data, while some equations show scatters
... Show MoreHumanoids or bipedal robots are other kinds of robots that have legs. The balance of humanoids is the general problem in these types when the other in the support phase and the leg in the swing phase. In this work, the walking pattern generation is studied by MATLAB for two types of degrees of freedom, 10 and 17 degrees of freedom. Besides, the KHR-2HV simulation model is used to simulate the experimental results by Webots. Similarly, Arduino and LOBOT LSC microcontrollers are used to program the bipedal robot. After the several methods for programming the bipedal robot by Arduino microcontroller, LOBOT LSC-32 driver model is the better than PCA 96685 Driver-16 channel servo driver for programming the bipedal walking rob
... Show MoreThe economy of a city has an important role not only in its establishment but also in its development. This is quite clear in the city of Baghdad throughout its history since its building in 762 A.D. In addition, most of its problems that the city is suffering from are basically related to not giving enough importance to the economic factors in the master planning of Baghdad since 1950’s. This may explain the failiars of master plans in dealing with the actual population growth and the city's inability to absorb such increases and interrelated and diverse activities which are negatively reflected on the economic variables particularly the effect on the land values, and the strong competitions amongst the land uses without previ
... Show MoreThe bodies responsible for the organization of accounting in the world seek to keep abreast of repaid development, by provide the information required by users, which they need to make efficient decision that return them to the desired benefits, and avoid the risks they could face if they made their decision based on misleading information, or insufficient, or not accurate, Hence, the IASB has undertaken to review the standards, and make the necessary adjustment and clarifications to remove the ambiguities that some of the paragraphs may have in IFRS issued.
And the Iraqi Central Bank obliges banks to convert from local accounting standards to apply IFRS only a step towards keeping pace with developments
... Show MoreThe presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two
... Show MoreIntelligent or smart completion wells vary from conventional wells. They have downhole flow control devices like Inflow Control Devices (ICD) and Interval Control Valves (ICV) to enhance reservoir management and control, optimizing hydrocarbon output and recovery. However, to explain their adoption and increase their economic return, a high level of justification is necessary. Smart horizontal wells also necessitate optimizing the number of valves, nozzles, and compartment length. A three-dimensional geological model of the As reservoir in AG oil field was used to see the influence of these factors on cumulative oil production and NPV. After creating the dynamic model for the As reservoir using the program Petrel (2017.4), we
... Show MoreAs regional development, as a matter of course, poses a number of systemic, scientific and political problems. While the issue of development is primarily at the national level to the limits of World War II in the industrialized world and to the 1960s borders in most Third World countries, the increasing awareness of regional disparities has led to the regional issue Were taken into consideration in the early 1960s and 1970s in most industrialized and developing countries alike. The local issue was only introduced in the early 1980s. The awareness of regional disparities and the fact that the regions do not have the same potential and that some regions have the resources to enable them to develop, grow and develop, unlike other r
... Show More