Preferred Language
Articles
/
AYb0qIYBIXToZYALIqMA
Green synthesis of graphene-coated sand (GCS) using low-grade dates for evaluation and modeling of the pH-dependent permeable barrier for remediation of groundwater contaminated with copper
...Show More Authors

Scopus Clarivate Crossref
Publication Date
Tue Feb 10 2026
Journal Name
F1000research
Simultaneous Numerical Determination of Two Time-dependent Coefficients in Second Order Parabolic Equation With Nonlocal Initial and Boundary Conditions
...Show More Authors

Background This study establishes a mathematically consistent and computational framework for the simultaneous identification of two time-dependent coefficients in a one-dimensional second-order parabolic partial differential equation. The considered problem is governed by nonlocal initial, boundary, and integral overdetermination conditions. Methods The direct problem is solved using the Crank-Nicolson finite difference method (FDM), which ensures unconditional stability and second-order accuracy in both spatial and temporal discretizations. The corresponding inverse problem is reformulated as a nonlinear regularized least-squares optimization problem and efficiently solved used the MATLAB subroutine

... Show More
View Publication
Scopus Crossref
Publication Date
Sun Jan 01 2017
Journal Name
Proceedings - European Metallurgical Conference, Emc 2017
Friction stir welding of aluminum alloy AA2024-T351 with OFHC copper
...Show More Authors

Scopus
Publication Date
Tue Dec 14 2021
Journal Name
Petroleum Science And Technology
Coupled reservoir geomechanics with sand production to minimize the sanding risks in unconsolidated reservoirs
...Show More Authors

Sand production in unconsolidated reservoirs has become a cause of concern for production engineers. Issues with sand production include increased wellbore instability and surface subsidence, plugging of production liners, and potential damage to surface facilities. A field case in southeast Iraq was conducted to predict the critical drawdown pressures (CDDP) at which the well can produce without sanding. A stress and sanding onset models were developed for Zubair reservoir. The results show that sanding risk occurs when rock strength is less than 7,250 psi, and the ratio of shear modulus to the bulk compressibility is less than 0.8 1012 psi2. As the rock strength is increased, the sand free drawdown and depletion becomes larger. The CDDP

... Show More
Crossref (12)
Crossref
Publication Date
Fri Jan 01 2016
Journal Name
Journal Of Multidisciplinary Engineering Science Studies (jmess)
Doping Ratio Of Silver Dependent On The Structure And Optical Properties Of Thin Cadmium Telluride Films
...Show More Authors

Publication Date
Sun Jan 19 2014
Journal Name
Romanian Biotechnological Letters
Optimization conditions for bioemulsifier production by local Streptomyces sp. SS20 isolated from hydrocarbon contaminated soil
...Show More Authors

Publication Date
Fri Apr 16 2021
Journal Name
Turkish Journal Of Computer And Mathematics Education
Awareness of the concepts of the green economy among the student-teacher at the College of Education for Pure Sciences - Ibn al-Haytham in Iraq
...Show More Authors

Preview PDF
Publication Date
Sat Apr 01 2023
Journal Name
Journal Of Engineering
Investigation of Groundwater and The Impact of Over-Pumping in Al-Haydariyah Region, Iraq
...Show More Authors

In this study; a three-dimensional model was created to simulate groundwater in Al-Haydariyah area of the governorate of Al-Najaf. A solid model was created to utilize the cross sections of 25 boreholes in the research region, and it was made out of two layers: sand and clay. The steady-state calibration was employed in six observation wells to calibrate the model and establish the hydraulic conductivity, which was 17.49 m/d for sand and 1.042 m/d for clay, with a recharge rate of 0.00007 m/day. The wells in the research region were reallocated with a distance of 1500 m between each well, resulting in 140 wells evenly distributed throughout the study area and with a discharge of 5 l/s, and the scenarios were run for 1000

... Show More
View Publication Preview PDF
Crossref (1)
Scopus Crossref
Publication Date
Tue Dec 31 2024
Journal Name
Iraqi Geological Journal
Geomechanical Modeling and Artificial Neural Network Technique for Predicting Breakout Failure in Nasiriyah Oilfield
...Show More Authors

Wellbore instability is one of the major issues observed throughout the drilling operation. Various wellbore instability issues may occur during drilling operations, including tight holes, borehole collapse, stuck pipe, and shale caving. Rock failure criteria are important in geomechanical analysis since they predict shear and tensile failures. A suitable failure criterion must match the rock failure, which a caliper log can detect to estimate the optimal mud weight. Lack of data makes certain wells' caliper logs unavailable. This makes it difficult to validate the performance of each failure criterion. This paper proposes an approach for predicting the breakout zones in the Nasiriyah oil field using an artificial neural network. It

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Wed Jul 01 2015
Journal Name
Advanced Powder Technology
Characterization of nano-silica prepared from local silica sand and its application in cement mortar using optimization technique
...Show More Authors

View Publication
Scopus (95)
Crossref (94)
Scopus Clarivate Crossref
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at theMechanical Engineering Department at Baghdad University - College of Engineering. The work is one ofthe pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes thefirst part of the work; that is the design calculations, simulation and construction. It will be followed by asecond part that describes testing and calibration of the tunnel. The proposed wind tunnel has a testsection with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flowdisturbances in the test sec

... Show More
View Publication
Crossref (7)
Crossref