Constructing a geologically realistic reservoir model and accurately evaluating petrophysical properties are critical components for effective reservoir management. Such efforts enable reliable assessment of hydrocarbon potential and support predictive development scenarios through numerical simulations. This study aims to characterize the Yamama carbonate reservoir in the Ratawi Field, southern Iraq, and to build a static geological model as a foundation for future dynamic simulation. Comprehensive well data, including wireline logs, core analysis, and geological reports, were integrated to interpret petrophysical parameters such as shale volume, effective porosity, and water saturation. Additionally, facies classification was performed using cluster analysis to define lithological variability across the reservoir. A structural framework was established based on contour maps and well tops, followed by 3D property modeling using geostatistical techniques. Experimental variogram models were constructed for each facies and zone to enhance distribution accuracy. The Yamama Formation was confirmed -consistent with previous studies- to consist of five vertical units, three reservoir-bearing (YA, YB, YC) and two barriers (C1, C2). However, this study uniquely establishes an evaluation framework using data from eight wells penetrating the formation, unlike earlier studies constrained by limited wells. Among these units, YB demonstrated the most favorable properties, accounting for approximately 63% of the estimated 1800 MMSTB OOIP, consistent with operator reports. Overall, reservoir quality improves northwestward and declines eastward, with moderate characteristics in the southern sector.
Intelligent or smart completion wells vary from conventional wells. They have downhole flow control devices like Inflow Control Devices (ICD) and Interval Control Valves (ICV) to enhance reservoir management and control, optimizing hydrocarbon output and recovery. However, to explain their adoption and increase their economic return, a high level of justification is necessary. Smart horizontal wells also necessitate optimizing the number of valves, nozzles, and compartment length. A three-dimensional geological model of the As reservoir in AG oil field was used to see the influence of these factors on cumulative oil production and NPV. After creating the dynamic model for the As reservoir using the program Petrel (2017.4), we
... Show MoreRecords of two regionalized variables were processed for each of porosity and permeability of reservoir rocks in Zubair Formation (Zb-109) south Iraq as an indication of the most important reservoir property which is the homogeneity , considering their important results in criterion most needed for primary and enhanced oil reservoir .Z and F tests that were calculated for the two above mentioned properties of pair units of Zubair Formation have shown the difference in depositional energy and different diagenesis between units IL and AB , DJ and AB , and the similarity in grains size , sorting degree , depositional environment and pressure gradients between IL and AB units , LS and IL units ; also the difference in the properties above betw
... Show MoreThis work evaluates the economic feasibility of various production scenarios for the Zubair reservoir in the Kifl oil field using cash flow and net present value (NPV) calculations. The Kifl field is an exploratory field that has not yet been developed or assessed economically. The first well was drilled in 1960, and three other wells were later drilled to assess the oil accumulation, so in this research, Different production scenarios were evaluated economically. These scenarios were proposed based on the reservoir model of the Zubair formation in the field. The research methodology used QUE$TOR software to estimate capital expenditures (CapEx) and operating expenditures (OpEx) based on field-level data, production prof
... Show MoreThe main parameter that drives oil industry contract investment and set up economic feasibility study for approving field development plan is hydrocarbon reservoir potential. So a qualified experience should be deeply afforded to correctly evaluate hydrocarbons reserve by applying different techniques at each phase of field management, through collecting and using valid and representative data sources, starting from exploration phase and tune-up by development phase. Commonly, volumetric calculation is the main technique for estimate reservoir potential using available information at exploration stage which is quite few data; in most cases, this technique estimate big figure of reserve. In this study
Reservoir fluids properties are very important in reservoir engineering computations such as material balance calculations, well testing analyses, reserve estimates, and numerical reservoir simulations. Isothermal oil compressibility is required in fluid flow problems, extension of fluid properties from values at the bubble point pressure to higher pressures of interest and in material balance calculations (Ramey, Spivey, and McCain). Isothermal oil compressibility is a measure of the fractional change in volume as pressure is changed at constant temperature (McCain). The most accurate method for determining the Isothermal oil compressibility is a laboratory PVT analysis; however, the evaluation of exploratory wells often require an esti
... Show MoreBacterial contamination of AL-Habania reservoir was studied during the period from February 2005 to January 2006; samples were collected from four stations (AL-Warrar, AL-Theban regulator, middle of the reservoir and the fourth was towards AL-Razzaza reservoir). Coliform bacteria, faecal Coliforms, Streptococci, and faecal Streptococci were used as parameters of bacterial contamination in waters through calculating the most probable number. Highest count of Coliform bacteria (1500 cell/100ml) was recorded at AL-Razaza during August, and the lowest count was less than (300 cell/100ml) in the rest of the collection stations for all months. Fecal Coliform bacteria ranged between less than 300 cells/100ml in all stations for all months to 700 c
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show More