The main parameter that drives oil industry contract investment and set up economic feasibility study for approving field development plan is hydrocarbon reservoir potential. So a qualified experience should be deeply afforded to correctly evaluate hydrocarbons reserve by applying different techniques at each phase of field management, through collecting and using valid and representative data sources, starting from exploration phase and tune-up by development phase. Commonly, volumetric calculation is the main technique for estimate reservoir potential using available information at exploration stage which is quite few data; in most cases, this technique estimate big figure of reserve. In this study case, volumetric calculation estimate gas initial in place (GIIP) value almost two times bigger than other techniques estimation of actual reservoir potential; it is a result of Asphiltena “Bitumen” existing in reservoir interval which occupied part of matrix pore and fill some fractures. This investigation is raised up at early field production life: material balance calculation and run simulation analysis are applied to re-assessment and tune-up reservoir potential; both techniques are set up almost same GIIP value which principally tuned to actual reservoir dynamic energy behavior. Finally, material balance should be viewed as a complement to simulation, not as a competing approach, and using both to improve analysis of hydrocarbon reservoirs.
The Khabour reservoir, Ordovician, Lower Paleozoic, Akkas gas field which is considered one of the main sandstone reservoirs in the west of Iraq. Researchers face difficulties in recognizing sandstone reservoirs since they are virtually always tight and heterogeneous. This paper is associated with the geological modeling of a gas-bearing reservoir that containing condensate appears while production when bottom hole pressure declines below the dew point. By defining the lithology and evaluating the petrophysical parameters of this complicated reservoir, a geological model for the reservoir is being built by using CMG BUILDER software (GEM tool) to create a static model. The petrophysical properties of a reservoir were computed using
... Show MoreGeomechanical modelling and simulation are introduced to accurately determine the combined effects of hydrocarbon production and changes in rock properties due to geomechanical effects. The reservoir geomechanical model is concerned with stress-related issues and rock failure in compression, shear, and tension induced by reservoir pore pressure changes due to reservoir depletion. In this paper, a rock mechanical model is constructed in geomechanical mode, and reservoir geomechanics simulations are run for a carbonate gas reservoir. The study begins with assessment of the data, construction of 1D rock mechanical models along the well trajectory, the generation of a 3D mechanical earth model, and runni
The accumulation of sediment in reservoirs poses a major challenge that impacts the storage capacity, quality of water, and efficiency of hydroelectric power generation systems. Geospatial methods, including Geographic Information Systems (GIS) and Remote Sensing (RS), were used to assess Dukan Reservoir sediment quantities. Satellite and reservoir water level data from 2010 to 2022 were used for sedimentation assessment. The satellite data was used to analyze the water spread area, employing the Normalized Difference Water Index (NDWI) and Modified Normalized Difference Water Index (MNDWI) to enhance the water surface in the satellite imagery of Dukan Reservoir. The cone formula was employed to calculate the live storag
... Show MoreIn petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started
... Show MoreThe aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For
... Show MoreThis study aims to assess the formation evaluation of the Jeribe Formation in Hamrin oilfield. The present study involved four selected wells of (Early- Mid Miocene) Jeribe Formation in Hamrin structure-Allas field; HR-2, HR-8, HR-9, and HR-16 located North of Iraq. The work deals with the available data that includes the most required information to improve such studies. Techlog Software V.2015 was used to carry out a reliable calculation of petrophysical properties utilizing conventional logs to determine the reservoir characteristics (lithology, porosity, and saturation). The computed CPI (software resulted) based on log information divided the Jeribe reservoir into two reservoir units (Jr-1 and Jr
... Show MoreThe environmental impact was illustrated by rockslide and erosion on the Duhok Dam and its reservoir. The evaluation of the geotechnical characteristics of the Gercus Formation was conducted. The research plan was divided into three phases, field, laboratory, and office works. The fieldwork included studying all the geological phenomena of the region related to the environmental impact. The laboratory work focused on studying the geotechnical properties of the various rock samples taken from the Gercus Formation. Rocklab program was used to define the geotechnical properties of a rock mass. The results indicated the weak resistance of the Gercus Formation rocks to weathering and erosion processes, as well as their weak resistance to slid
... Show MoreOne of the principle inputs to project economics and all business decisions is a realistic production forecast and a practical and achievable development plan (i.e. waterflood). Particularly this becomes challenging in supergiant oil fields with medium to low lateral connectivity. The main objectives of the Production Forecast and feasibility study for water injection are:
1- Provide an overview of the total expected production profile, expected wells potential/spare capacity, water breakthrough timing and water cut development over time
2- Highlight the requirements to maintain performance, suggest the optimum developmen
Flow unit and reservoir rock type identification in carbonates are difficult due to the intricacy of pore networks caused by facies changes and diagenetic processes. On the other hand, these classifications of rock type are necessary for understanding a reservoir and predicting its production performance in the face of any activity. The current study focuses on rock type and flow unit classification for the Mishrif reservoir in Iraq's southeast and the study is based on data from five wells that penetrate it. Integration of several methods was used to determine the flow unit based on well log interpretation and petrophysical properties. The flow units were identified using the Quality Index of Rock and the Indicator of Flow Zone. Th
... Show More