The thermal and electrical performance of different designs of air based hybrid photovoltaic/thermal collectors is investigated experimentally and theoretically. The circulating air is used to cool PV panels and to collect the absorbed energy to improve their performance. Four different collectors have been designed, manufactured and instrumented namely; double PV panels without cooling (model I), single duct double pass collector (model II), double duct single pass (model III), and single duct single pass (model IV) . Each collector consists of: channel duct, glass cover, axial fan to circulate air and two PV panel in parallel connection. The temperature of the upper and
... Show MoreThe thermal and electrical performance of different designs of air based hybrid photovoltaic/thermal collectors is investigated experimentally and theoretically. The circulating air is used to cool PV panels and to collect the absorbed energy to improve their performance. Four different collectors have been designed, manufactured and instrumented namely; double PV panels without cooling (model I), single duct double pass collector (model II), double duct single pass (model III), and single duct single pass (model IV) . Each collector consists of: channel duct, glass cover, axial fan to circulate air and two PV panel in parallel connection. The temperature of the upper and lower surfaces of PV panels, air temper
... Show MoreThis paper numerically and theoretically investigates the optical and thermal performance of a parabolic trough collector PTC system. Many numerical simulations and theoretical analyses are conducted to demonstrate the influence of the receiver geometry and shifting from the focal position on the optical performance. The examined receiver geometries are circular, square, triangular, elliptical, and the new circular–square combined geometry is named as channel receiver. The thermal performance of PTC is examined for different volume flow rates theoretically in the range of (0.36 to 2.4 lpm). The results show that the best optical design is the channel receiver with an intercept factor of 84%, while the worst is the elliptical receiver with
... Show MoreIn light of increasing demand for energy consumption due to life complexity and its requirements, which reflected on architecture in type and size, Environmental challenges have emerged in the need to reduce emissions and power consumption within the construction sector. Which urged designers to improve the environmental performance of buildings by adopting new design approaches, Invest digital technology to facilitate design decision-making, in short time, effort and cost. Which doesn’t stop at the limits of acceptable efficiency, but extends to the level of (the highest performance), which doesn’t provide by traditional approaches that adopted by researchers and local institutions in their studies and architectural practices, limit
... Show MoreIn this research, the performance of asphalt mixtures modified with polyethylene polymer (PE) by adding 2%, 4%, and 6% percentages was evaluated. Two kinds of PE are employed: Low-Density PE (LDPE) and High-Density PE (HDPE). The semi-wet mixing technique (SWM) was conducted to avoid stability issue for PE-modified binder during storage condition. Many experimental tests were conducted to evaluate the ability of these mixtures to withstand the effects of loads and moisture. The hardness index of these mixtures was also measured to determine their resistance to the effects of high temperatures without causing permanent deformations. The results showed that adding PE led to a remarkable enhancement in the performance of PE-modified mixtures.
... Show MoreThe construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim
... Show More