The current research aims to study the extent to which the Independent High Electoral Commission applies to information security risk management by the international standard (ISO / IEC27005) in terms of policies, administrative and technical procedures, and techniques used in managing information security risks, based on the opinions of experts in the sector who occupy positions (General Manager The directorate, department heads and their agents, project managers, heads of divisions, and those authorized to access systems and software). The importance of the research comes by giving a clear picture of the field of information security risk management in the organization in question because of its significant role in identifying risks and setting appropriate controls to manage or get rid of them, flexibility in setting controls at work and gaining the confidence of stakeholders and customers that Their data is protected. Compliance with controls gives the organization the confidence of customers that it is the best supplier and raises the level of ability to meet the requirements of tenders and then get new job opportunities, which encouraged addressing this topic by focusing on the basic standards of this specification and trying to study these standards and identify the most critical problems that This prevents its application in the commission understudy in particular. The Independent High Electoral Commission/National Office in Baghdad was chosen as a site to conduct the research, and the approach of the case study and applied research was followed and through field coexistence, observations, interviews, access to documents and information extracted from records and documents in order to determine the extent of the gap Between the Information Security Department of the commission in question and the system that the specification came with, analyzing the causes of the gaps and developing solutions, and considering The research was extended to the checklists prepared by the International Standardization Organization, and for the purpose of data analysis, the heptagonal scale was used in the checklists to measure the extent to which the implementation and actual documentation conform to the requirements of the specification, while determining the weights for the answers to the questions contained in the checklists by allocating a specific weight to each paragraph of the scale. The research used two statistical methods, the percentage and the weighted mean to express the extent of application and documentation of the specification paragraphs above and relied on the statement of the main reasons for surgery in the emergence of those gaps. The results that were reached showed several reasons that prevented the application of information security risk management, in the light of which treatments were developed that would reduce the gaps that appeared, the most important of which are: that the Commission did not adopt a clear and documented strategy to address risks, and that information security risk management Ineffective and completely secured from external and internal threats. There was also interest in documenting fixed Hardware and portable Hardware represented by computers used at the headquarters of the directorate, servers and small computers used as workstations in divisions and departments and their connection to senior management, as well as laptops and personal digital assistants, which showed a gap attributed to the total undocumented application of Hardware (automatic data processing), processing accessories, and electronic media), while the application was partially and undocumented for other electronic media, including disk drives, printers, paper, and documents.
<p>Photovoltaic (PV) systems are becoming increasingly popular; however, arc faults on the direct current (DC) side are becoming more widespread as a result of the effects of aging as well as the trend toward higher DC voltage levels, posing severe risk to human safety and system stability. The parallel arc faults present higher level of current as compared with the series arc faults, making it more difficult to spot the series arc. In this paper and for the aim of condition monitoring, the features of a DC series arc fault are analyzed by analysing the arc features, performing model’s simulation in PSCAD, and carrying out experimental studies. Various arc models are simulated and investigated; for low current arcs, the heur
... Show MoreBackground: Several risk managem-ent standards had been developed including the Project Management Institute, the National Institute of Standards and Technology, actuarial societies, and ISO standards.
Objective: The study aimed at evaluating risk management among managers of model and ordinary primary health care centers in Baghdad City and comparing the risk management among these centers.
Methods: A descriptive comparative des
... Show MoreDam operation and management have become more complex recently because of the need for considering hydraulic structure sustainability and environmental protect on. An Earthfill dam that includes a powerhouse system is considered as a significant multipurpose hydraulic structure. Understanding the effects of running hydropower plant turbines on the dam body is one of the major safety concerns for earthfill dams. In this research, dynamic analysis of earthfill dam, integrated with a hydropower plant system containing six vertical Kaplan turbines (i.e., Haditha dam), is investigated. In the first stage of the study, ANSYS-CFX was used to represent one vertical Kaplan turbine unit by designing a three-dimensional (3-D) finite element (F
... Show MoreThe purpose of the research is to present a proposed accounting system model for converting and aggregating accounting information within the framework of the differentiated accounting systems, and the research methodology consists of: The research problem is the existence of differentiated and dispersed accounting systems that operate within governmental economic units and at the same time seek to achieve a unified vision and goals for the organization, and the central research hypothesis is the possibility of conducting the process of conversion accounting information from the government accounting system to the unified accounting system, and then aggregate those systems. The research was conducted at the College of Administrat
... Show MoreLand Use / Land Cover (LULC) classification is considered one of the basic tasks that decision makers and map makers rely on to evaluate the infrastructure, using different types of satellite data, despite the large spectral difference or overlap in the spectra in the same land cover in addition to the problem of aberration and the degree of inclination of the images that may be negatively affect rating performance. The main objective of this study is to develop a working method for classifying the land cover using high-resolution satellite images using object based method. Maximum likelihood pixel based supervised as well as object approaches were examined on QuickBird satellite image in Karbala, Iraq. This study illustrated that
... Show MoreActive worms have posed a major security threat to the Internet, and many research efforts have focused on them. This paper is interested in internet worm that spreads via TCP, which accounts for the majority of internet traffic. It presents an approach that use a hybrid solution between two detection algorithms: behavior base detection and signature base detection to have the features of each of them. The aim of this study is to have a good solution of detecting worm and stealthy worm with the feature of the speed. This proposal was designed in distributed collaborative scheme based on the small-world network model to effectively improve the system performance.
Abstract The aim of this research is to show the grade of implementation of ISO 26000 (Social Responsibility Standard), specifically which related in clause sex (consumer issues), this study was achieved in Market Research and Consumer Protection Center (MRCPC) / University of Baghdad. The seven consumer issues of ISO 26000 was analyzed to show the extent of its implementation in MRCPC depending of using a check list as a principle instrument to collect research data and information. Results analysis was achieved by percentages and mean average. The research was leaded some of results and the most importance one was that the grade of implementation of the center in related to consumer issues given in the standard was medium
Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show More