Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreThat the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment
... Show MoreThe research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreThe goods sold during the transport phase may be exposed to the risk of the buyer's state, whether those risks are land, sea or air, resulting in the loss of the goods in whole or in part, or damage, as if they were destroyed by the ship sinking or colliding with another or the cause of the loss or damage is due to a fire, as in the case of a spark on the goods, and the goods is a combustible material. The risk should be borne by one of the parties. To identify the responsible party for the risks, it should determine a particular moment for transferring risks. There has been a difference in legislation, whether at the national or international level, on determining the basis for risk
... Show MoreThe concept of insurance policy is one of the concepts that expresses a way to face the risks that a person is exposed to in the field of his life. It is a system that involves a prior agreement between two parties through which the risk is transferred from the second party (the insured) to the first party (the insurer) in return for paying an amount Calculated was able to cover the potential loss according to certain percentages agreed upon between the two parties, and that the main goal of any scientific analysis of the risk is to choose the most appropriate policy or method to confront it, by identifying the risks and ways to address them, and the main goal is to reduce losses and limit the possibility of their occurrence.
In
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
Risks are linked to banking activities. In order to overcome these risks, the bank has only the ability to rely on guarantees that are various and varied. These include traditional guarantees such as personal guarantees, commercial and real estate mortgages, insurance operations, specialized to cover the risks of foreign trade operations.
Including the procedures and procedures that the banking institution should abide by in the practice of its credit activities both before and after the grant to detect the risks surrounding them early and address them before they grow, by following the rules of banking governance of forming specialized committees in the bank, Monitoring credit operations and reviewing the credit portfolio to asc
... Show MoreDelays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in
... Show More
The research aims to study and analysis of concurrent engineering (CE) and cost optimization (CO), and the use of concurrent engineering inputs to outputs to improve the cost, and the statement of the role of concurrent engineering in improving the quality of the product, and achieve savings in the design and manufacturing time and assembly and reduce costs, as well as employing some models to determine how much the savings in time, including the model (Lexmark) model (Pert) to determine the savings in design time for manufacturing and assembly time.
To achieve the search objectives, the General Company for Electrical and Electronic Industries \ Refrigerated Engine
... Show MoreImages are important medium for conveying information; this makes improvement of image processing techniques also important. Interpretation of image content is one of the objectives of image processing techniques. Image interpretation that segments the image to number of objects called image segmentation. Image segmentation is an important field to deal with the contents of images and get non overlapping regions coherent in texture and color, it is important to deal only with objects with significant information. This paper presents survey of the most commonly used approaches of image segmentation and the results of those approaches have been compared and according to the measurement of quality presented in this paper the Otsu's threshol
... Show More