Preferred Language
Articles
/
7BaUCocBVTCNdQwCczHT
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects through reviewing literature studies, books, and articles related to this topic. The findings indicate that several causes of risks are more critical for the project including causes related to contract, design and execution, subcontractors, systems, and equipment. The study’s results revealed that the absence of risk management implementation in the EPC construction project is a root cause of the lack of planning and control of the project.</p>
Crossref
View Publication
Publication Date
Thu Apr 25 2019
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
PATTERN OF INVESTMENT PROJECTS IN THE INVESTMENT ENVIRONMENT: PATTERN OF INVESTMENT PROJECTS IN THE INVESTMENT ENVIRONMENT
...Show More Authors

That the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment

... Show More
View Publication Preview PDF
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Sun Feb 28 2021
Journal Name
Journal Of Economics And Administrative Sciences
The role of concurrent engineering in cost optimization
...Show More Authors

 

     The research aims to study and analysis of concurrent engineering (CE) and cost optimization (CO), and the use of concurrent engineering inputs to outputs to improve the cost, and the statement of the role of concurrent engineering in improving the quality of the product, and achieve savings in the design and manufacturing time and assembly and reduce costs, as well as employing some models to determine how much the savings in time, including the model (Lexmark) model (Pert) to determine the savings in design time for manufacturing and assembly time.

To achieve the search objectives, the General Company for Electrical and Electronic Industries \ Refrigerated Engine

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 01 2023
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of insurance policy in facing banking risks
...Show More Authors

The concept of insurance policy is one of the concepts that expresses a way to face the risks that a person is exposed to in the field of his life. It is a system that involves a prior agreement between two parties through which the risk is transferred from the second party (the insured) to the first party (the insurer) in return for paying an amount Calculated was able to cover the potential loss according to certain percentages agreed upon between the two parties, and that the main goal of any scientific analysis of the risk is to choose the most appropriate policy or method to confront it, by identifying the risks and ways to address them, and the main goal is to reduce losses and limit the possibility of their occurrence.

In

... Show More
View Publication Preview PDF
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Thu Nov 17 2022
Journal Name
Aip Conference Proceedings
Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in

... Show More
Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Opción: Revista De Ciencias Humanas Y Sociales
Main tendencies in the category of number in Japanese and Swahili
...Show More Authors

Scopus
Publication Date
Wed Dec 30 2015
Journal Name
College Of Islamic Sciences
The causes of fear in the world An original Quranic study
...Show More Authors

The subject of fear is one of the most important tasks that one should seek to find out the reasons behind it, and push it up with all its sound mental concepts.
     The main reason for the lack of security and fear and disturbance in the world is to commit the legitimate violations that God warned us in his Holy Book as well as in the Sunnah of His Prophet (peace be upon him).
    The talk about the causes of fear in the Koran is not limited to the word (fear) Fakk but came in different and varied methods such as (horror) and (awe) and (shares) and (narrow).

View Publication Preview PDF
Publication Date
Mon Jun 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
Using the Box Jenkins models to predict Iraq's cement production and to demonstrate its adequacy under future construction projects
...Show More Authors

تعد صناعة السمنت في العراق من اقدم الصناعات الحديثة واكثرها تطورا وتقدما ومن اقواها تاثيرا في الاقتصاد القومي. واذ توفر في صناعة السمنت العراقي كافة المستلزمات الناجحة من حيث توفر المواد الاولية والخبرات الفنية والتقنية واسواق ثابتة وراسخة محليا وعالميا فقد كان من المفروض ان يتم التوسع في هذه الصناعة، وان التخطيط لهذه الصناعة امرا ضروريا خاصة وان مادة السمنت هي احدى اهم المواد الرئيسة التي يؤثر توفره

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Research In Social Sciences &amp; Humanities
The ROLE OF THE CLEANER PRODUCTION STRATEGY IN ENHANCING THE MAIN SUCCESS FACTORS
...Show More Authors

The business environment is witnessing tremendous developments in the field of production and technology, which requires the development of production methods to go in line with these developments and the increasing competition, which has gone beyond the economic aspects to extend to the environmental aspects, as economic units tended to adopt a cleaner production strategy and through what they achieve by producing environmentally friendly products and achieving economic efficiency. Reducing costs, providing a safe and clean environment for workers, and reducing waste from production operations.

View Publication Preview PDF
Crossref