Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
Abstract
In light of the great technological development and the emergence of globalization has increased global competition, where it became competitive exercise pressure on all sectors. In light of this companies mast enviorment depend on the means that keeps them on the competitive position through access to information about competitors in order to help them to draw a strategy that will achieve a competitive edge either through excellence or reduce the costs of their products and this means intelligence competitive and reverse engineering that help to gain information on competitors analyze and put of the decision-maker From this point formed the idea of research in the statement of the role of
... Show MoreIn this research for each positive integer integer and is accompanied by connecting that number with the number of Bashz Attabq result any two functions midwives to derive a positive integer so that there is a point
The research tacklets the role of risks arising from the excessive use of derivative contracts for trading in financial crises, including the recent global financial crisis in (2008) which is known the mortgage crisis.
In order to prove the hypothesis of the research, the risk index of derivative contracts has been chosed as expressed in the measure of (value at risk) to be the main field for testing the hypothesis of research. The duration of the contract has been also chased for (15) years between the years (2001- 2015), the period preceding the global financial crisis, while the second represents the period of time that followed. The research reached a number of conclusions, bu
... Show MoreIntegrated project delivery is collaboratively applying the skills and knowledge of all participants to optimize the project's results, increase owner value, decrease waste, and maximize efficiency during the design, fabrication, and construction processes. This study aims to determine IPD criteria positively impacting value engineering. To do this, the study has considered 9 main criteria according to PMP classification that already covers all project phases and 183 sub-criteria obtained from theoretical study and expert interviews (fieldwork). In this study, the SPSS (V26) program was used to analyze the main criteria and sub-criteria priorities from top to bottom according to their values of the Relative Importance In
... Show Moreلخلاصة تشغل قضايا الهوية محور اهتمام الكثير من الباحثين والدارسين في بنية المجتمعات ومستقبل الدول, وفي كثير من الدراسات التي كتبها هؤلاء كان هناك ميل نحو دراسة الهوية وعلاقتها بحركة الدول تقدما وتراجعا ,فهناك من عزا تقدم دولة ما إلى نجاح نخبها السياسية في صناعة هوية جامعة لحالة التنوع الذي يميز مجتمعها, ويمكن ان تشير الى الولايات المتحدة الامريكية كأنموذج للنجاح في هذا الاطار.وهناك من ارجع
... Show MoreThe basic idea of the Main Outfall Drain, MOD, was to construct a main channel to collect saline drained water of the irrigation projects within central and southern parts of Iraq and discharge it down to the Arabian Gulf. The MOD has a navigation lock structures near Addalmage Lake at station 299.4km. This structure is designed to ensure navigation within the MOD. The water level difference upstream the cross regulator and the downstream conjugation structure is about 9m. This head difference can be used to generate electrical power by constricting a low head power plant. This study aimed to utilize the head difference in navigation lock structures for power generation. Different operation condition an
... Show MoreAZ Khalaf, M kassim Haidir, LK Jasim, Iraqi Journal of Science, 2012