Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects through reviewing literature studies, books, and articles related to this topic. The findings indicate that several causes of risks are more critical for the project including causes related to contract, design and execution, subcontractors, systems, and equipment. The study’s results revealed that the absence of risk management implementation in the EPC construction project is a root cause of the lack of planning and control of the project.</p>
Crossref
View Publication
Publication Date
Tue Jul 01 2014
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
VARIATIONS OF WOOD ELEMENTS IN MAIN STEM OF ALBIZIA LEBBECK (L.) BENTH. GROWING IN BAGHDAD CITY, IRAQ
...Show More Authors

    As Albizia lebbeck is one of the important species in Iraq and the region, its wood has subjected to investigation through the assessment of differences in its element dimensions and specific gravity under Baghdad conditions. Variations of fiber length, fiber width, cell wall thickness, vessel diameter, and density of wood were examined along the stem and horizontally.  Results showed that fiber lengths were within the normal range, but their widths were narrower than common range of hardwoods. There were little increase in fiber length, width, wall thickness as the height position increased. Vessel diameter has been affected contrarily. No significant effects of  height on specific gravity could be

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 01 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Reinsurance risks and their reflex on the financial performance of the National Insurance Company: Applied Research in Maritime Insurance Branch
...Show More Authors

The research dealt with the risks of reinsurance and its impact on the financial performance of the National Insurance Company by focusing on reinsurance in the marine insurance branch. Negative impact on the financial performance of the NICs and the Marine Insurance Branch. The research sample resulted in a main hypothesis that reflects this relationship. Lee in the analysis of financial information reports National Insurance Company of the branch of marine insurance for the period of 2010 until 2017, and the use of (retention) for measuring the re-insurance operations index, and (insurance financial surplus rate) to measure financial performance. For the purpose of obtaining the results, a number of statistical methods were used accord

... Show More
View Publication Preview PDF
Publication Date
Mon Feb 04 2019
Journal Name
Iraqi Journal Of Physics
Risks assessment for the retrieval of radioactive waste from the old Russian cemetery Al -Tuwaitha site
...Show More Authors

In this work the radioactive wastes in the Old Russian
Cemetery Al -Tuwaitha site were classified according to risks for
workers who are involved in the retrieval process. The exposure
assessment results expressed as estimates of radionuclide intakes by
inhalation and ingestion, exposure rates and duration for external
exposure pathways, and committed effective dose equivalents to
individuals from all relevant radionuclides and pathways. Results
showed the presence of natural radionuclides Ra-226, Th-234 and K-
40, as well as the produced radionuclide Cs-137 and Eu-152 in the
cemetery wells. The absorbed doses from the waste were classified to
two categories; exempt waste and low level waste according to

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2013
Journal Name
Baghdad Science Journal
Bacterial Causes Tonsillitis in Children, Study the Resistance to Antimicrobials and the Effect of Clove Extracts on Selected Isolated Bacteria.
...Show More Authors

In this study Isolated Pathogenic bacteria which causes Tonsillitis in Children with ages between 3-17 years. They are admitted to Central Children Hospital (Al-Karch) and Ebn-Albalady Hospital (Al-Rusafa). 200 cases were collected which include 120 Male and 80 Female. The result of the recent study shows that the isolation percentage was 40% from Male and 35% from Female. In this study Fifty six isolated were Identified, 20 were ?-hemolytic Streptococcus which was Streptococcus pyogenes, formed (36%) from all isolated.6 Pathogenic bacteria were ?- hemolytic Streptococcus which was Streptococcus pneumoniae formed (11%). The number of Moraxella catarrhalis bacteria was 12 formed (21%), the number of Haemophilus influenzae was 1

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting
...Show More Authors

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 08 2024
Journal Name
Engineering, Technology &amp; Applied Science Research
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
...Show More Authors

Reconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in

... Show More
View Publication
Crossref (1)
Scopus Crossref
Publication Date
Wed Jan 30 2019
Journal Name
Journal Of The College Of Education For Women
Social and psychological problems for students of the faculties of Engineering and Education for Girls in Baghdad University
...Show More Authors

The subject of youth care of important issues in view of what constitutes the importance
to the development of societies in general and as much as enjoy young people in any society
are good psychological health and agree psychosocial be healthy to be effective to invest their
energies and their potential for the progress of that society and development of the social
aspects and economic. The universities of the most important educational institutions that
provide care for young people, they are as well as providing information and expertise
necessary to prepare young people for life and the development of mental abilities, they are
different activities that will satisfy their needs physical, psychological, social and

... Show More
View Publication Preview PDF
Publication Date
Mon Oct 31 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
The adoption of green management in Iraqi construction industry: The challenges and benefits
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (7)