The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
This study deals with establishing the depositional environment of the Fatha Formation through facies analysis. It also deals with dividing the formation into units based on the rhythmic nature. Data from selected shallow wells near Hit area and deep wells at East Baghdad Oil field are used. Five major lithofacies are recognized in this study, namely, greenish grey marl, limestone, gypsum (and/or anhydrite), halite and reddish brown mudstone (with occasional sandstone).The limestone lithofacies is divided into three microfacies: Gastropods bioclastic wackestone microfacies, Gastropods peloidal bioclastic packstone, and Foraminiferal packstone microfacies.The lithofacies of the Fatha are nested in a rhythmic pattern or what is known as sh
... Show MoreExploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizont
... Show MoreThe aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For
... Show MoreHuman resources constitute the most important recourses that the organization owned today, as it may have developed financial and technology resources to achieve their goals, but they are not able to use it with required efficiency and effective and quality desired unless there is human resources that have good skills, experiences and talents that able to directing and exploited ideally that compatible with market requirements, where today's market and business organizations which compete naturally inherent talent, so the task is to attracting and developing talented resources and preservation these talented resources from the challenges that facing organizations.
The research seek to achieve
... Show MoreFor many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction i
... Show MoreThere are many varied studies that dealt with the dramatic construction, especially books and studies that addressed drama in its construction and the method of writing it, that no textbook or a general cultural content is void of tackling the dramatic text in its construction and how the dramatic action develops in it. Therefore, a question occurs to the mind about the feasibility of dealing with the dramatic construction in this time, where many contemporary studies of dramatology and its relation and the contemporary critical directions are accumulating. This question many have two realistic aspects, yet the novelty and originality that this research shows lie in addressing a refined linguistic text in its style and connotations, such
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul