The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show Moreresearch objectives to:
1. identify the social, economic and cultural factors affecting consumption.
2. detect the consumption culture among the population in the city of Erbil.
3. Identify the GATT consumer protection and rights.
The most important results:
1. that there is variation in the answers of respondents about keep up with modernity in the basic consumption (necessary), it swallowed the proportion of yes answers about keep up with modernity in food consumption (72%), and is an indication of growing consumer awareness of the individual in the side of nutrition. The clothing on the side of the proportion of yes answers amounted to (85%), in the health field note that the percentage of yes answers (83%), who are abr
Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreAfter a temporary halt to forced thghebr in different cities of Iraq this methodlogy
opeations returned directiy in the areas of political conflict on the ground which are translated
operations and forced displacement violence es they operations aimed at completing the
forced displacement that occurred after the occupation in(2003)which took an upward curve
publicly after these events and some of which are aimed at the liquidation of some provinces
than any demographic diversity of religious or sectarian or alhens and others aimed at
redemographic distribution within the province itself to produce a net sectarian zones as is the
case in Diyala Nineveh and Babylon Baghdad has the epicenter of sectarian violence and th
As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is
... Show MoreWhen industrial and constructional renaissance started in the world, the great interest was going on towards the equipment’s, which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.
The professional safety is concerned as restrict which
... Show More