The present study devoted to determine the ultimate lateral carrying capacity of piles foundation in contaminated clayey soils and subjected to lateral cyclical loading. Two methods have been used to calculate the lateral carrying capacity of piles foundation; the first one is two-line slopes intersection method (TLSI) and the second method is a modified model of soil degradation. The model proposed by Heerama and then developed by Smith has been modified to take into consideration the effects of heavy loads and soil contamination. The ultimate lateral carrying capacity of single pile and piles group (2×2) driven into samples of contaminated clayey soils have been calculated by using the two methods. Clayey soil samples are contaminated with four percentages of industrial wastewater (10, 20, 40 and 100) % of the distilled water used in the soaking process, the soaking procedure of soil samples have been proceeded for 30 days. Also, two ratios of eccentricity to embedded length (e/L = 0.25 and 0.5) have been examined. The results obtained from two analytical methods are well agreed with those obtained experimentally. The ultimate lateral carrying capacity, Pu (analytical) /Pu (experimentally) ranged from (75-8) % and (77-80) % of single pile with e/L = 0.25 and 0.5 respectively. In the piles group the ratio ranged (67-80) % and (71-79) % for e/L = 0.25 and 0.5 respectively.
Introduction: An aneurysmal bone cyst are enigmatic lesion of unknown cause and presentation and are difficult to distinguish from other lesions, it is a benign, but expansible tumor like lesion that generally occurs in the long bones. An aneurysmal bone cyst arising from the flat bone like clavicle is rare . Case presentation: We report a 12-year-old girl child with an aneurysmal bone cyst of the lateral third of left clavicle treated with enblock resection. The pathologic findings confirmed the diagnosis of aneurysmal bone cyst. The patient has been followed up for one year with no evidence of recurrence . Conclusion: En bloc resection can be curative and provide good results for this rare type of clavicle tumour.
Introduction: An aneurysmal bone cyst are enigmatic lesionof unknown cause and presentation and are difficult todistinguish from other lesions, it is a benign, but expansibletumor like lesion that generally occurs in the long bones. Ananeurysmal bone cyst arising from the flat bone like clavicleis rare .Case presentation: We report a 12-year-old girl child with ananeurysmal bone cyst of the lateral third of left clavicletreated with enblock resection. The pathologic findingsconfirmed the diagnosis of aneurysmal bone cyst. Thepatient has been followed up for one year with no evidenceof recurrence .Conclusion: En bloc resection can be curative and provide good results for this rare type of clavicle tumour.
ABSTRACT Studying the positive and negative effects resulted from the industrial projects and laying down the comprehensive planning bases to the urban development projects which insure retaining the social, economic and environmental development, taking in to consternation the time factor within the planning process which is considered the most important factor that determine the extent of the efficient selection to the site and not interpenetrate in the industrial activities and efficiency and calculating its future expansions away from the residential areas. It is more favorable to plan the industrial areas of apparent pollution outside the bounds of the basic plan to limit the negative effects on the environment and providing
... Show MoreThe objective of this research is to study experimentally and theoretically the girder vertical load share of the curved I-Girder bridges subjected to the point load in addition to the self-weigh and supper imposed dead loads. The experimental program consist of manufacturing and testing the five simply supported bridge models was scaled down by (1/10) from a prototype of 30m central span. The models carriageway central radii are 30 m, 15m or 10m. The girder spacing of the first two models is 175 mm with an overall carriageway width of 650mm. The girder spacing of the other three bridge models is 200mm with the overall carriageway width of 700 mm. The overall depth of the composite section was 164 mm. To investigate the effect of live load
... Show More