The Cu(II) was found using a quick and uncomplicated procedure that involved reacting it with a freshly synthesized ligand to create an orange complex that had an absorbance peak of 481.5 nm in an acidic solution. The best conditions for the formation of the complex were studied from the concentration of the ligand, medium, the eff ect of the addition sequence, the eff ect of temperature, and the time of complex formation. The results obtained are scatter plot extending from 0.1–9 ppm and a linear range from 0.1–7 ppm. Relative standard deviation (RSD%) for n = 8 is less than 0.5, recovery % (R%) within acceptable values, correlation coeffi cient (r) equal 0.9986, coeffi cient of determination (r2) equal to 0.9973, and percentage capita
... Show MoreBackground:
Multiple sclerosis is a chronic disease believed to be the result of autoimmune disorders of the central nervous system, characterised by inflammation, demyelination, and axonal transection, affecting primarily young adults. Disease modifying therapies have become widely used, and the rapid development of these drugs highlighted the need to update our knowledge on their short- and long-term safety profile.
Objective:
The study aim is to evaluate the impact of disease-modifying treatments on thyroid functions and thyroid autoantibodies with subsequent effects on the outcome of the disease.
Materials and Methods:
A retro prospective study
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
An easy, eclectic, precise high-Performance Liquid Chromatographic (HPLC) procedure was evolved and validated to estimate of Piroxicam and Codeine phosphate. Chromatographic demarcation was accomplished on a C18 column [Use BDS Hypersil C18, 5μ, 150 x 4.6 mm] using a mobile phase of methanol: phosphate buffer (60:40, v/v, pH=2.3), the flow rate was 1.1 mL/min, UV detection was at 214 nm. System Suitability tests (SSTs) are typically performed to assess the suitability and effectiveness of the entire chromatography system. The retention time for Piroxicam was found to be 3.95 minutes and 1.46 minutes for Codeine phosphate. The evolved method has been validated through precision, limit of quantitation, specificity,
... Show MoreThe Caputo definition of fractional derivatives introduces solution to the difficulties appears in the numerical treatment of differential equations due its consistency in differentiating constant functions. In the same time the memory and hereditary behaviors of the time fractional order derivatives (TFODE) still common in all definitions of fractional derivatives. The use of properties of companion matrices appears in reformulating multilevel schemes as generalized two level schemes is employed with the Gerschgorin disc theorems to prove stability condition. Caputo fractional derivatives with finite difference representations is considered. Moreover the effect of using the inverse operator which tr
Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show MoreRisk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show More