In this study, the first kind Bessel function was used to solve Kepler equation for an elliptical orbiting satellite. It is a classical method that gives a direct solution for calculation of the eccentric anomaly. It was solved for one period from (M=0-360)° with an eccentricity of (e=0-1) and the number of terms from (N=1-10). Also, the error in the representation of the first kind Bessel function was calculated. The results indicated that for eccentricity of (0.1-0.4) and (N = 1-10), the values of eccentric anomaly gave a good result as compared with the exact solution. Besides, the obtained eccentric anomaly values were unaffected by increasing the number of terms (N = 6-10) for eccentricities (0.8 and 0.9). The Bessel function's solution appeared to be close to the exact solution for eccentricity of 1 and more than 10 number of terms. Finally, the representation of the first kind Bessel function J1(x) was closer to the exact representation only for eccentricity 0.5 and (N=1-10).
The major objective of this study is to establish a network of Ground Control Points-GCPs which can use it as a reference for any engineering project. Total Station (type: Nikon Nivo 5.C), Optical Level and Garmin Navigator GPS were used to perform traversing. Traversing measurement was achieved by using nine points covered the selected area irregularly. Near Civil Engineering Department at Baghdad University Al-jadiriya, an attempt has been made to assess the accuracy of GPS by comparing the data obtained from the Total Station. The average error of this method is 3.326 m with the highest coefficient of determination (R2) is 0.077 m observed in Northing. While in
Optical Mark Recognition (OMR) is an important technology for applications that require speedy, high-accuracy processing of a huge volume of hand-filled forms. The aim of this technology is to reduce manual work, human effort, high accuracy in assessment, and minimize time for evaluation answer sheets. This paper proposed OMR by using Modify Bidirectional Associative Memory (MBAM), MBAM has two phases (learning and analysis phases), it will learn on the answer sheets that contain the correct answers by giving its own code that represents the number of correct answers, then detection marks from answer sheets by using analysis phase. This proposal will be able to detect no selection or select more than one choice, in addition, using M
... Show MoreAbstract :
The study aims at building a mathematical model for the aggregate production planning for Baghdad soft drinks company. The study is based on a set of aggregate planning strategies (Control of working hours, storage level control strategy) for the purpose of exploiting the resources and productive capacities available in an optimal manner and minimizing production costs by using (Matlab) program. The most important finding of the research is the importance of exploiting during the available time of production capacity. In the months when the demand is less than the production capacity available for investment. In the subsequent months when the demand exceeds the available energy and to minimize the use of overti
... Show MoreThe sensitive and important data are increased in the last decades rapidly, since the tremendous updating of networking infrastructure and communications. to secure this data becomes necessary with increasing volume of it, to satisfy securing for data, using different cipher techniques and methods to ensure goals of security that are integrity, confidentiality, and availability. This paper presented a proposed hybrid text cryptography method to encrypt a sensitive data by using different encryption algorithms such as: Caesar, Vigenère, Affine, and multiplicative. Using this hybrid text cryptography method aims to make the encryption process more secure and effective. The hybrid text cryptography method depends on circular queue. Using circ
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc