Preferred Language
Articles
/
0RigO5QBVTCNdQwCiQO4
Tectonic activation and the risk of Ilisu Dam collapse to Iraq through modelling and simulation using HEC-RAS
...Show More Authors
Abstract<p>Floods caused by dam failures can cause huge losses of life and property, especially in estuarine areas and valleys. In spite of all the capabilities and great improvements reached by man in the construction of dams and their structures, they will remain helpless before the powerful forces of nature, especially those related to tectonic activation, and the occurrence of earthquakes of different intensities.</p><p>The region extending from the Ilisu Dam in Turkey to the Mosul Dam in Iraq was chosen as an area for this study, and the HEC-RAS application was used to simulate the collapse of the Ilisu Dam due to a major earthquake, to know the magnitude of the risks and losses that could result from this. The Ilisu Dam was built very close to a highly tectonically active fault system, particularly the East Anatolian Fault (EAF), which is one of the largest tectonically active faults in the world with a length of 500 km. This region has witnessed past and present earthquakes of high magnitude (M > 7), especially in the EAF, so the construction of the Ilisu Dam near the EAF fault system is of great concern, as it was built in a basin with very complex seismic activity and geology.</p><p>Using the HEC-RAS simulation application, the study found that the flood resulting from the collapse of the Ilisu Dam would reach the edges of the Mosul Dam Lake in just 13 h. With a flow of more than 100,000 m<sup>3</sup>/s, more than 10 billion m3 of water will flow into the Mosul Dam Lake within four days of the disaster. This will lead to the collapse of the Mosul Dam and direct the flood wave of the collapse of these dams towards Baghdad through Mosul, Tikrit, and Samarra. This could pose risks to all Iraqi cities located within the Iraqi sedimentary plain (Mesopotamia), from south of the Mosul Dam up to Basra, in a scenario similar to Noah’s Flood.</p>
Scopus Clarivate Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 24 2020
Journal Name
Al-kindy College Medical Journal
Comorbidity and Risk Factors for COVID-19 Confirmed Patients in Wasit Province, IRAQ
...Show More Authors

Background: Coronavirus disease 2019 (COVID-19) is
one of the updated challenges facing the whole world.
Objective: To identify the characteristics risk factors that
present in humans to be more liable to get an infection
than others.
Methods: A cross-sectional study was conducted for
positively confirmed 35 patients with polymerase chain
reaction in Wasit province at AL-Zahraa Teaching
Hospital from the period of March 13th till April 20th. All
of them full a questionnaire regarded by risk factors and
other comorbidities. Data were analyzed by SPSS version
23 using frequency tables and percentage. For numerical
data, the median, and interquartile range (IQR) were used.
Differences between categoric

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Aug 28 2015
Journal Name
Al-khwarizmi Engineering Journal
wavelength division multiplexing passive optical network modelling using optical system simulator
...Show More Authors

Due to the continuing demand for larger bandwidth, the optical transport becoming general in the access network. Using optical fiber technologies, the communications infrastructure becomes powerful, providing very high speeds to transfer a high capacity of data. Existing telecommunications infrastructures is currently widely used Passive Optical Network that apply Wavelength Division Multiplexing (WDM) and is awaited to play an important role in the future Internet supporting a large diversity of services and next generation networks. This paper presents a design of WDM-PON network, the simulation and analysis of transmission parameters in the Optisystem 7.0 environment for bidirectional traffic. The simulation shows the behavior of optical

... Show More
Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Comparison between the empirical bayes method with moments method to estimate the affiliation parameter in the clinical trials using simulation
...Show More Authors

In this research the Empirical Bayes method is used to Estimate the affiliation parameter in the clinical trials and then we compare this with the Moment Estimates for this parameter using Monte Carlo stimulation , we assumed that the distribution of the observation is binomial distribution while the distribution with the unknown random parameters is beta distribution ,finally we conclude that the Empirical bayes method for the random affiliation parameter is efficient using Mean Squares Error (MSE) and for different Sample size .

View Publication Preview PDF
Crossref
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Finite element analysis of seepage for Kongele earth dam Using Geo- Studio software
...Show More Authors
Abstract<p>Seepage occurs under or inside structures or in the place, where they come into contact with the sides under the influence of pressure caused by the difference in water level in the structure U / S and D / S. This paper is designed to model seepage analysis for Kongele (an earth dam) due to its importance in providing water for agricultural projects and supporting Tourism sector. For this purpose, analysis was carried out to study seepage through the dam under various conditions. Using the finite element method by computer program (Geo-Studio) the dam was analysed in its actual design using the SEEP / W 2018 program. Several analyses were performed to study the seepage across Kongele </p> ... Show More
View Publication
Scopus (3)
Crossref (5)
Scopus Crossref
Publication Date
Thu Sep 10 2020
Journal Name
Diyala Journal Of Engineering Sciences
Finite Element Analysis of Seepage for Hemrin Earth Dam Using Geo-Studio Software
...Show More Authors

Finite Element Approach is employed in this research work to solve the governing differential equations related to seepage via its foundation's dam structure. The primary focus for this reason is the discretization of domain into finite elements through the placement of imaginary nodal points and the discretization of governing equations into an equation system; An equation for each nodal point or part, and unknown variables are solved. The SEEP / W software (program) is a sub-program of the Geo-Studio software, which is used by porous soil media to compensate for the problems of seepage. To achieve the research goals, a study was carried out on Hemrin dam, which located in the Diyala River 100 km northeast of Baghdad, Iraq. Thus, o

... Show More
View Publication
Crossref (7)
Crossref
Publication Date
Tue May 23 2023
Journal Name
Journal Of Engineering
Numerical Simulation of Ice Melting Using the Finite Volume Method
...Show More Authors

The Aim of this paper is to investigate numerically the simulation of ice melting in one and two dimension using the cell-centered finite volume method. The mathematical model is based on the heat conduction equation associated with a fixed grid, latent heat source approach. The fully implicit time scheme is selected to represent the time discretization. The ice conductivity is chosen
to be the value of the approximated conductivity at the interface between adjacent ice and water control volumes. The predicted temperature distribution, percentage melt fraction, interface location and its velocity is compared with those obtained from the exact analytical solution. A good agreement is obtained when comparing the numerical results of one

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Mar 01 2010
Journal Name
Journal Of Economics And Administrative Sciences
Estimating the general exponential distribution parameters using the simulation method
...Show More Authors

The main aim of this paper is to study how the different estimators of the two unknown parameters (shape and scale parameter) of a generalized exponential distribution behave for different sample sizes and for different parameter values. In particular, 

. Maximum Likelihood, Percentile and Ordinary Least Square estimators had been implemented for different sample sizes (small, medium, and large) and assumed several contrasts initial values for the two parameters. Two indicators of performance Mean Square Error and Mean Percentile Error were used and the comparisons were carried out between different methods of estimation  by using monte carlo simulation technique .. It was obse

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jun 28 2021
Journal Name
Journal Of Engineering
Managing the Flood Waves from Hemrin Dam
...Show More Authors

Diyala Governorate was exposed recently to high flood waves discharged from Hemrin Dam to Diyala River when the dam reached its full capacity. The recently recorded discharge capacity of Diyala River was reduced to just 750m3/s. This exposes cities and villages along the Diyala River to flood risk when discharging the flood waves, which may reach 3000 m3/s. It is important to manage, suggest, and design flood escapes to discharge the flood waves from Hemrin Dam away from Diyala River. This escape branches from Hemrin Lake towards Ashweicha Marsh. One dimensional hydraulic model was developed to simulate the flow within the escape by using HEC-RAS software. Eighty-two cross-sections were ext

... Show More
View Publication Preview PDF
Crossref (1)
Crossref