Preferred Language
Articles
/
-BjVEZYBVTCNdQwCdIEy
Optimal hybrid type-3 fuzzy controller for horizontal axis wind turbines: Comparative study
...Show More Authors

The blade pitch angle (BPA) controller is key factor to improve the power generation of wind turbine (WT). Due to the aerodynamic structural behavior of the rotor blades, wind turbine system performance is influenced by pitch angle and environmental conditions such as wind speed, which fluctuate throughout the day. Therefore, to overcome the pitch angle control (PAC) problem, high wind speed conditions, and due to type-1 and type-2 fuzzy logic limitations for handling high levels of uncertainty, the newly proposed optimal hybrid type-3 fuzzy logic controller has been applied and compared since type-3 fuzzy controllers utilize three-dimensional membership functions, unlike type-2 and type-1 fuzzy logic controllers. In this paper six different controllers are applied and compared for BPA in WT: type-1 fuzzy logic controller (T1-FLC), interval type-2 fuzzy logic controller (IT2-FLC), interval type-3 fuzzy logic controller (IT3-FLC), optimal hybrid type-1 fuzzy-PID controller (HT1-FPIDC), optimal hybrid type-2 fuzzy-PID controller (HT2-FPIDC), and optimal hybrid type-3 fuzzy-PID controller (HT3-FPIDC). The comparison between Mamdani and Sugeno fuzzy inference systems (FIS) has been applied to find the best inference system. Genetic Algorithm (GA) and Particle swarm optimization (PSO) are used to find the optimal tuning of PID parameters. The results of the 500-kw horizontal axis wind turbine show that Sugeno FIS has higher stability in output power generation than Mamdani FIS. Also, optimal HT3-FPIDC based on Mamdani FIS with PSO provides 19.74 % lower absolute summation error (ASE) than Sugeno FIS in optimal HT2-FLC with PSO and 39.03 % lower ASE than optimal HT1-FLC based on Sugeno FIS with PSO. Finally, the proposed optimal HT3-FPIDC based on PSO and Mamdani FIS provides the optimal results in terms of consistent output power generation at rated value.

Scopus Clarivate Crossref
View Publication
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Interval value fuzzy hyper AT-algebras
...Show More Authors
Abstract<p>The aim of this work is to a connection between two concepts which are an interval value fuzzy set and a hyper AT-algebra. Also, some properties of these concepts are found. The notions of IVF hyper AT-subalgebras, IVF hyper ideals and IVF hyper AT-ideals are defined. Then IVF (weak, strong) hyper ideals and IVF (weak, strong) hyper AT-ideals are discussed. After that, some relations among these ideals are presented and some interesting theorems are proved.</p>
View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Nternational Journal Of Mathematics Trends And Technology (ijmtt)
Fuzzy Scheduling Problem on Two Machines
...Show More Authors

Publication Date
Sun Jan 01 2023
Journal Name
Aip Conference Proceedings
Bipolar fuzzy ideals of TM-algebras
...Show More Authors

The concept of bipolar fuzzy ideals in a TM-algebra was introduced and some properties of these ideals are investigated. Also, a few relations between a bipolar fuzzy ideal and T-ideal are discussed. A new bipolar fuzzy set with a homomorphism of TM-algebra is defined. The Cartesian product of bipolar fuzzy T-ideals in Cartesian product TM-algebras is given.

View Publication
Scopus Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Bitcoin Prediction with a hybrid model
...Show More Authors

In recent years, Bitcoin has become the most widely used blockchain platform in business and finance. The goal of this work is to find a viable prediction model that incorporates and perhaps improves on a combination of available models. Among the techniques utilized in this paper are exponential smoothing, ARIMA, artificial neural networks (ANNs) models, and prediction combination models. The study's most obvious discovery is that artificial intelligence models improve the results of compound prediction models. The second key discovery was that a strong combination forecasting model that responds to the multiple fluctuations that occur in the bitcoin time series and Error improvement should be used. Based on the results, the prediction acc

... Show More
Scopus (14)
Scopus
Publication Date
Wed Nov 21 2018
Journal Name
International Journal Of Control, Automation And Systems
Design and Stability Analysis of a Fractional Order State Feedback Controller for Trajectory Tracking of a Differential Drive Robot
...Show More Authors

View Publication
Scopus (22)
Crossref (19)
Scopus Clarivate Crossref
Publication Date
Sun Jun 30 2024
Journal Name
International Journal Of Intelligent Engineering And Systems
Development of Intelligent Control Strategy for an Anesthesia System Based on Radial Basis Function Neural Network Like PID Controller
...Show More Authors

View Publication
Scopus (3)
Scopus Crossref
Publication Date
Wed Apr 28 2021
Journal Name
Misan Journal For Physical Education Sciences
The Effectiveness of Using Generative Learning Model in Learning Kinetic Series on Rings and Horizontal Bar In Artistic Gymnastics for men
...Show More Authors

The aim of this study was to identify the effectiveness of using generative learning model in learning kinetic series on rings and horizontal bar in artistic gymnastics for men ,Also, the two groups were better in learning the two series of movements on the rings and horizontal bar . The experimental method was used to design two parallel groups with pretested and posttest .The sample included third graders at the College of Physical Education and Sports Sciences - University of Baghdad ,The third class (d) was chosen to represent the control group that applied the curriculum in the college, with (12) students per group. After conducting the tribal tests, the main experiment was carried out for (8) weeks at the rate of two units per week di

... Show More
Preview PDF
Publication Date
Tue Dec 22 2020
Journal Name
Collaboration And Integration In Construction, Engineering, Management And Technology
A Hybrid Conceptual Model for BIM Adoption in Facilities Management: A Descriptive Analysis for the Collected Data
...Show More Authors

View Publication
Scopus (3)
Scopus Crossref
Publication Date
Thu Aug 01 2024
Journal Name
Indonesian Journal Of Chemistry
Cloud Point Extraction Method for Spectrophotometric Determination of 3-Aminophenol in Environmental Samples
...Show More Authors

This work describes the development of new spectrophotometric techniques for 3-aminophenol assessment. The first technique involves using benzidine in an alkaline solution to convert 3-aminophenol into a colored complex. The produced complex has a red color with an absorbance of 462 nm. Between the concentration range 5–14 μg mL−1, Beer's law is obeyed with a correlation coefficient (R2) of 0.99781, a limit of detection (LOD) of 0.0423 μg mL−1, and a limit of quantification (LOQ) of 0.1411 μg mL−1. The recovery was between 87.2–95.43%, the relative standard deviation (%RSD) was 2.40–3.31% and the molar absorptivity was 3.545 × 103 L mol−1 cm−1. Secondly, cloud point extraction (CPE) was used to determ

... Show More
View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref