The current research aims to identify the risk management and its impact on the quality of service in the Salahalddin Sewerage Directorate, This is due to the great impact that the service provided by this institution plays in preserving health and the environment in the community, which has faced many administrative challenges, problems and issues as a result of the rapid and continuous environmental changes, and therefore, the adoption of administrative concepts such as risk management and knowledge of their impact on the quality of the municipal service is necessary to reach this service To the required levels. To achieve the research objectives, two main hypotheses have been formulated, the first of which is to find the extent of the link between the two research variables of risk management and its dimensions (the stage of diagnosing and assessing risks, the stage of decision-making and facing risks,Risk assessment and review stage),And the quality of municipal service by excluding it (tangibility, reliability, response, safety, sympathy),While the second one tries to prove the effect of the first variable on the second variable,The research sample was chosen using the intentional sample method consisting of (65) employees. The questionnaire was used and the number of paragraphs amounted to (43) items to obtain the required data, which were prepared based on two ready-made measures after they were subjected to validity and stability tests,To test the validity of the hypotheses and answer the research questions, an analytical descriptive approach and statistical tests were used, among which were the mean, the standard deviation, the coefficient of variation, and the relative importance, depending on the statistical program (SPSS.V.26),The research reached a set of conclusions, the most important of which is the keenness of Salahalddin Directorate to possess the quality of a municipal service that is provided to all its clients, and employs risk management in order to support that quality, especially through the assessment and review of risks, decision-making and confronting risks as well as diagnosing and assessing risks,Also, the Salahalddin Sewerage Directorate uses risk management to improve the quality of its services from a proactive and defensive perspective, especially when taking decisions to confront them and assessing risk reviews, as well as a correlation and impact of risk management in raising the quality of the service provided..
Parasitic diseases can affect infection with COVID-19 obviously, as protective agents, or by reducing severity of this viral infection. This current review mentions the common symptoms between human parasites and symptoms of COVID-19, and explains the mechanism actions of parasites, which may prevent or reduce severity of this viral infection. Pre-existing parasitic infections provide prohibition against pathogenicity of COVID-19, by altering the balance of gut microbiota that can vary the immune response to this virus infection.
Objective: The aim of this study is to determine the factors affecting birth space interval in a sample of women.
Methodology: A cross-sectional study conducted in primary health centers in Al-Tahade and Al- Shak Omar in
Baghdad city. Data were collected by direct interview using questionnaire especially prepared for the study.
Sample size was (415) women in age group (20-40) years who were chosen randomly.
Results: Analysis of data shows highest rate of women (31.8%) had a birth space interval of (8-12) months
followed by (26.7%) had a birth space interval of (19-24) months, (20.2%) had a birth space interval of (>24)
months and (16.1%) had a birth space interval of (13-18) months respectively, while lower rate of w
Background: Determination of local bone mineral density (BMD) immediately after implant insertion play an important role in implant success rate, may offer comprehensive description of the bone, and give enough information to the surgeon prior to implant insertion and at follow up status. The aim of the present study is to evaluate the changes of local bone density in the dental implant recipient sites by using computerized tomography. Material and method: The sample consisted of (20) dental implants recipient sites, bone density assessment was done twice, immediately after implants insertion and after six months. Results: The mean HU of the bone around the implant insertion site, immediately after implant placement was 552.28 HU, and inc
... Show More