Objectives To quantify the reproducibility of the drill calibration process in dynamic navigation guided placement of dental implants and to identify the human factors that could affect the precision of this process in order to improve the overall implant placement accuracy. Methods A set of six drills and four implants were calibrated by three operators following the standard calibration process of NaviDent® (ClaroNav Inc.). The reproducibility of the position of each tip of a drill or implant was calculated in relation to the pre-planned implants’ entry and apex positions. Intra- and inter-operator reliabilities were reported. The effects of the drill length and shape on the reproducibility of the calibration process were also investigated. The outcome measures for reproducibility were expressed in terms of variability range, average and maximum deviations from the mean distance. Results A satisfactory inter-rater reproducibility was noted. The precision of the calibration of the tip position in terms of variability range was between 0.3 and 3.7 mm. We noted a tendency towards a higher precision of the calibration process with longer drills. More calibration errors were observed when calibrating long zygomatic implants with non-locking adapters than with pointed drills. Flexible long-pointed drills had low calibration precision that was comparable to the non-flexible short-pointed drills. Conclusion The clinicians should be aware of the calibration error associated with the dynamic navigation placement of dental and zygomatic implants. This should be taken in consideration especially for long implants, short drills, and long drills that have some degree of flexibility. Clinical significance Dynamic navigation procedures are associated with an inherent drill calibration error. The manual stability during the calibration process is crucial in minimising this error. In addition, the clinician must never ignore the prescribed accuracy checking procedures after each calibration process.
This paper studies the combination fluid viscous dampers in the outrigger system to add supplementary damping into the structure, which purpose to remove the dependability of the structure to lower variable intrinsic damping. It works by connecting the central core, comprising either shear walls or braced frames, to the outer perimeter columns.
The modal considered is a 36 storey square high rise reinforced concrete building. By constructing a discrete lumped mass model, and using frequency-based response function, two systems of dampers, parallel and series systems are studied. The maximum lateral load at the top of the building is calculated, and this load w
... Show MoreA standard theoretical neutron energy flux distribution is achieved for the triton-triton nuclear fusion reaction in the range of triton energy about ≤10 MeV. This distribution give raises an evidence to provide the global calculations including the characteristics fusion parameters governing the T-T fusion reaction.
In this paper, we will illustrate a gamma regression model assuming that the dependent variable (Y) is a gamma distribution and that it's mean ( ) is related through a linear predictor with link function which is identity link function g(μ) = μ. It also contains the shape parameter which is not constant and depends on the linear predictor and with link function which is the log link and we will estimate the parameters of gamma regression by using two estimation methods which are The Maximum Likelihood and the Bayesian and a comparison between these methods by using the standard comparison of average squares of error (MSE), where the two methods were applied to real da
... Show MoreHorizontal wells have revolutionized hydrocarbon production by enhancing recovery efficiency and reducing environmental impact. This paper presents an enhanced Black Oil Model simulator, written in Visual Basic, for three-dimensional two-phase (oil and water) flow through porous media. Unlike most existing tools, this simulator is customized for horizontal well modeling and calibrated using extensive historical data from the South Rumaila Oilfield, Iraq. The simulator first achieves a strong match with historical pressure data (1954–2004) using vertical wells, with an average deviation of less than 5% from observed pressures, and is then applied to forecast the performance of hypothetical horizontal wells (2008–2011). The result
... Show MoreThis research aims to know the intellectual picture the displaced people formed about aid organizations and determine whether they were positive or negative, the researchers used survey tool as standard to study the society represented by displaced people living in Baghdad camps from Shiites, Sunnis, Shabak, Turkmen, Christians, and Ezidis.
The researcher reached to important results and the most important thing he found is that displaced people living in camps included in this survey hold a positive opinion about organizations working to meet their demands but they complain about the shortfall in the health care side.
The research also found that displaced people from (Shabak, Turkmen, and Ezidi) minorities see that internati
Family social institution mission in the community, if and repaired Magistrate society and often lead that institution a positive role in the socialization, but a variety of factors ailing infect system family Vtfkdh role effective and influential in society and stands at the forefront of those factors disintegration family, whether caused by the death of one or both parents, divorce or separation, or whether the result of domestic weakness and poor family behavioral practices. And gaining the study of great importance and that the scarcity of studies that address the problem of delinquency female, is no secret that stand on the fact the role of disintegration family in the events of that problem will help and a large degree in the devel
... Show MoreAThe Bridge Maintenance Management System (BMMS) is an application system that uses existing data from a Bridge Management System database for monitoring and analysis of current bridges performance, as well as for estimating the current and future maintenance and rehabilitation needs of the bridges. In a transportation context, the maintenance management is described as a cost-effective process to operate, construct, and maintain physical money. This needs analytical tools to support the allocation of resources, materials, equipment, including personnel, and supplies. Therefore, Geographic Information System (GIS) can be considered as one tool to develop the road and bridge maintenanc
Many critics suggest that Beckett’s early plays are comic because they focus their analyses on the use comic elements. Waiting for Godot is one of Beckett’s early plays, and it has been heavily analyzed and read as a comic text partly because its subtitle is “a tragicomedy in two acts” and also because of the comic techniques used in the play. The present paper, however, attempts to read the play as a piece in which comedy fails to produce any effects on the characters who remain apparently very desperate and frustrated throughout the play. The characters perform different comic acts, but they do not really feel amused or entertained. The paper suggests that the acts these characters put on stage are only means to pass t
... Show More
