A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show MoreNear-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot
In this work, we construct and classify the projectively distinct (k,3)-arcs in PG(2,9), where k ≥ 5, and prove that the complete (k,3)-arcs do not exist, where 5 ≤ k ≤ 13. We found that the maximum complete (k,3)-arc in PG(2,q) is the (16,3)-arc and the minimum complete (k,3)-arc in PG(2,q) is the (14,3)-arc. Moreover, we found the complete (k,3)-arcs between them.
The research aims to identify the theoretical foundations for measuring and analyzing quality costs and continuous improvement, as well as measuring and analyzing quality costs for the Directorate of Electricity Supply / Middle Euphrates and continuous improvement of the distribution of electrical energy,The problem was represented by the high costs of failure and waste in electrical energy result to the excesses on the network and the missing (lost) energy,Thus, measuring and analyzing quality costs for the distribution of electrical energy and identifying continuous improvement leads to a reduction in missing and an increase in sales, as the research reached many conclusions, the most important of which is the high percentage o
... Show MoreCurrent research sought to evaluate the performance and results of employees in accordance with normative to people and people result for the European model of excellence EFQM 2013 quality management Foundation in the Inspector General's Office/Ministry of health, so as to pursue a modern and advanced management methods in evaluating performance and the performance of the Office's relationship with a citizen's life, since it takes him beyond the accepted service capabilities today, but it became budget duties between dealers servicing responsibilities and future planning, financial control, competitiveness, human resources needs and maintaining quality and continuous improvement and development as well as The primary role of the
... Show MoreAbstract:
Current research has sought to apply the criteria of potential for altmizalaorbi model EFQM 2013 in assessing the performance of the Inspector General's Office/Ministry of health, so as to keep up with a modern and advanced management methods in the evaluation of performance, as well as to link performance to a citizen's life, and it takes him beyond the accepted service capabilities today, but of budget duties between dealers servicing responsibilities and future planning, financial control, competitiveness, human resources needs and maintaining quality and development, as well as the constant quest for continuous improvement, is the spirit of the principle underpinning the European Foundation Quality managemen
... Show More