Background: Dysfunction of sinoatrial node is a set of abnormal rhythms which are resulted from the sinoatrial node malfunctionof the sinus node, the chief natural cardiac pacemaker. The common, and occasionally, the single method for treatment of heart arrhythmias wasimplantation of pacemaker, which reduce symptoms exactly occurs after implantation. Aim: To detect the association between red cell width diameter (RDW) and some cardiac electrophysiology parameters in sinus node dysfunction in Iraqi patients such as SNRT and AH. Methods: A cross sectional study, was conducted on 59 patient ranging between 20-50 years old and involving 35 female and 24 male patients, suffering from an unexplained symptoms of sinoatrial node dysfunction (SND). The enrolled participants were gathered from patients who visited the arrhythmia consultant clinic in the Najaf center for cardiac surgery and interventional catheterization at Al-Sadr Medical City in Najaf from all parts of Iraq. The duration of study extended from the beginning of July 2018 till the ending of July 2019. The patients were selected and investigated according to inclusion criteria and either referred to electrophysiological study. Results: The basic procedure of the study was measurement of cardiac electrophysiological parameters such as SNRT and AH as well as other noninvasive investigations such as PR. Depending on sinus node recovery time (SNRT) measurement for all patients, new cutoff point (1150 milliseconds) for pacemaker implantation was detected. Statistically significant correlations were found between new SNRT cutoff of study and most of electrophysiological, anthropometric, demographic that achieved in current study (P-value< 0.05). Conclusion: RDW has a significant effecton PR, SNRT, and AH parameters of patients with unexplained symptomatic SND in Iraq. © 2020 Lahore Medical And Dental College. All rights reserved.
New Schiff base ligand 2-((4-amino-5-(3, 4, 5-trimethoxybenzyl) pyrimidin- 2-ylimino) (phenyl)methyl)benzoic acid] = [HL] was synthesized using microwave irradiation trimethoprim and 2-benzoyl benzoic acid. Mixed ligand complexes of Mn((ІІ), Co(ІІ), Ni(ІІ), Cu(ІІ), Zn(ІІ) and Cd(ІІ) are reacted in ethanol with Schiff base ligand [HL] and 8-hydroxyquinoline [HQ] then reacted with metal salts in ethanol as a solvent in (1:1:1) ratio. The ligand [HL] is characterized by FTIR, UV-Vis, melting point, elemental microanalysis (C.H.N), 1H-NMR, 13C-NMR, and mass spectra. The mixed ligand complexes are characterized by infrared spectra, electronic spectra, (C.H.N), melting point, atomic absorption, molar conductance and magnetic moment me
... Show MoreGas and downhole water sink-assisted gravity drainage (GDWS-AGD) is a new process of enhanced oil recovery (EOR) in oil reservoirs underlain by large bottom aquifers. The process is capital intensive as it requires the construction of dual-completed wells for oil production and water drainage and additional multiple vertical gas-injection wells. The costs could be substantially reduced by eliminating the gas-injection wells and using triple-completed multi-functional wells. These wells are dubbed triple-completion-GDWS-AGD (TC-GDWS-AGD). In this work, we design and optimize the TC-GDWS-AGD oil recovery process in a fictitious oil reservoir (Punq-S3) that emulates a real North Sea oil field. The design aims at maximum oil recovery us
... Show MoreIn this research constructed N2 laser system by use developed method of electric discharge. In this method used four step of electric discharge by using four capacitors, three spark gaps, high tension power supply varying in range from 12kV to 24 kV and three resistors, this method called three stage blumlein circuit. The breakdown time delay of these parallel spark gaps cement strong ultraviolet preionization in the laser channel, thus the result of these amendments the laser output is many doubled and is more increasing than that obtained using the one and two stage blumlein circuits. This system has been designed and operated to give pulse laser with wavelength at 337.1 nm. This laser system can operate without mirrors and optical res
... Show MoreIn this paper, we investigate some methods to solve one of the multi-criteria machine scheduling problems. The discussed problem is the total completion time and the total earliness jobs To solve this problem, some heuristic methods are proposed which provided good results. The Branch and Bound (BAB) method is applied with new suggested upper and lower bounds to solve the discussed problem, which produced exact results for in a reasonable time.
The research seeks to clarify the problems related to the aspects of the financial and accounting process resulting from entering into contractual arrangements with a period of more than 20 years, among which is the research problem represented by the lack of clarity of the foundations and procedures for the recognition of oil costs and additional costs borne by foreign invested companies, which led to a weakening of their credibility and reflection. Negatively "on the measurement and accounting disclosure of financial reports prepared by oil companies, and the research aims to lay down sound procedures for measuring and classifying oil costs and additional costs paid to foreign companies, and recognizing and recording them in th
... Show MoreIn :the _pr sent _paper we report ths. ynthesis ·of a new li:ga!!d..
[f4LJ [{'2 {1-'[(2-hyd•:0xy-.ben:zy1i.den·e)..,bxcJrazanci}:etby-l }benzerieÂ
J,5 t;rtiol .aad its complexes ·w-ith '('Mlif(1 J Fev 1 ), ed(J'l), and. :f.::I:g 01>-)
The ligand \VS preP..ated rin tWo steps' • fp I t}Je nrst stea -soJutiQil Qf
-saUcyla[deeyeq. ip methatt:oJ . re3ctcd lU1der reflux
... Show MoreThe use of a communication network in the closed loop control systems has many advantages such as remotely controlling equipment, low cost, easy to maintenance, efficient information transmission, etc. However, the Networked Control System (NCS) has many drawbacks, such as network-induce end-to-end time delay and packet loss, which lead to significant degradation in controller performance and may result in instability. Aiming at solving performance degradation in NCS, this paper propose to take the advantages and strength of the conventional Proportional-Integral-Derivative (PID), Fuzzy Logic (FL), and Gain Scheduling (GS) fundamentals to design a Fuzzy-PID like-Gain Scheduling (F-PID-GS) control technique, which has been proved to be ef
... Show MoreThere are many methods of forecasting, and these methods take data only, analyze it, make a prediction by analyzing, neglect the prior information side and do not considering the fluctuations that occur overtime. The best way to forecast oil prices that takes the fluctuations that occur overtime and is updated by entering prior information is the Bayesian structural time series (BSTS) method. Oil prices fluctuations have an important role in economic so predictions of future oil prices that are crucial for many countries whose economies depend mainly on oil, such as Iraq. Oil prices directly affect the health of the economy. Thus, it is necessary to forecast future oil price with models adapted for emerging events. In this article, we st
... Show More