Preferred Language
Articles
/
yxekJZIBVTCNdQwCc57V
Solving Tri-criteria: Total Completion Time, Total Earliness, and Maximum Tardiness Using Exact and Heuristic Methods on Single-Machine Scheduling Problems
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Jul 01 2021
Journal Name
Journal Of Physics: Conference Series
Estimation of the reliability function of the Rayleigh distribution using some robust and kernel methods
...Show More Authors
Abstract<p>The research presents the reliability. It is defined as the probability of accomplishing any part of the system within a specified time and under the same circumstances. On the theoretical side, the reliability, the reliability function, and the cumulative function of failure are studied within the one-parameter Raleigh distribution. This research aims to discover many factors that are missed the reliability evaluation which causes constant interruptions of the machines in addition to the problems of data. The problem of the research is that there are many methods for estimating the reliability function but no one has suitable qualifications for most of these methods in the data such </p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Peak to Average Power Ratio Reduction of OFDM Signals Using Clipping and Iterative Processing Methods
...Show More Authors

One of the serious problems in any wireless communication system using multi carrier modulation technique like Orthogonal Frequency Division Multiplexing (OFDM) is its Peak to Average Power Ratio (PAPR).It limits the transmission power due to the limitation of dynamic range of Analog to Digital Converter and Digital to Analog Converter (ADC/DAC) and power amplifiers at the transmitter, which in turn sets the limit over maximum achievable rate.

        This issue is especially important for mobile terminals to sustain longer battery life time. Therefore reducing PAPR can be regarded as an important issue to realize efficient and affordable mobile communication services.

   

... Show More
View Publication Preview PDF
Publication Date
Fri Apr 12 2019
Journal Name
Journal Of Economics And Administrative Sciences
The role of determining the economic quantity of the demand in reducing the total costs of inventory A case study in the Institute of Technical Management / Baghdad
...Show More Authors

ABSTRACT

The research aims to identify the role of scientific planning of inventory by determining the quantity of economic demand and the number of times of purchase and associated annual total costs to achieve a sufficient and appropriate level of inventory . The research was based on the case study methodology. Materials of increasing demand in the Institute of Technical Management and knowledge of the degree of conformity of the procurement plan with the standard indicators adopted in a scientific method ,its include economic order quantity and number of purchasing times .
one of The main results  of the research was  the existence of a large difference between the quantity of the economic purchase of ea

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Oct 01 2018
Journal Name
Iraqi Journal Of Physics
Preparation single layer of (MgO) as antireflection coating using PLD technique
...Show More Authors

In this work preparation of antireflection coating with single layer of MgO using pulsed laser deposition (PLD) method which deposit on glass substrate with different thicknesses (90 and 100) nm annealed at temperature 500 K was done.
The optical and structural properties (X-ray diffraction) have been determined. The optical reflectance was computed with the aid of MATLAB over the visible and near infrared region. Results shows that the best result obtained for optical performance of AR'Cs at 700 shots with thickness 90 nm nanostructure single layer AR'Cs and low reflection at wavelength 550 nm.

View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun May 24 2026
Journal Name
Modern Sport
Time out in basketball and it effect on playing for excellent degrees in Iraq
...Show More Authors

The value of time out as a time not count of official time form the game like four periods and extra time also it considered a great interest if used well thru the game , the importance of this problem is not using well the time out and when the coach ask for time out and how to invest this time legally to make good results also there is no observing system as the researcher see gives the reality image that the coach is successful lead the game when he takes time out . The goals of research that knowing on numbers of time out for excellent teams in Iraq (first &second) stages and putting special inventory reverse reality of asking time out (positive &negative) on playing basketball , the hypothesis of research that tell the time out effect

... Show More
View Publication Preview PDF
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
A Real-Time Fuzzy Load Flow and Contingency Analysis Based on Gaussian Distribution System
...Show More Authors

Fuzzy logic is used to solve the load flow and contingency analysis problems, so decreasing computing time and its the best selection instead of the traditional methods. The proposed  method is very accurate with outstanding computation time, which made the fuzzy load flow (FLF) suitable for real time application for small- as well as large-scale power systems. In addition that, the FLF efficiently able to solve load flow problem of ill-conditioned power systems and contingency analysis. The FLF method using Gaussian membership function requires less number of iterations and less computing time than that required in the FLF method using triangular membership function. Using sparsity technique for the input Ybus sparse matrix data gi

... Show More
View Publication Preview PDF
Publication Date
Tue Aug 11 2020
Journal Name
International Journal Of Psychosocial Rehabilitation
The effect of the maximum physical effort on some physiological variables, body components and achievement level in the effectiveness of air rifle shooting
...Show More Authors

The job that confronts players with the effectiveness of shooting with an air rifle is high, so it requires necessary functional adaptations that differ in their degrees from other sports. Regular training in air rifle shooting leads to physiological changes in most of the body's internal systems, and changes and responses can be identified. The functional accompanying physical activity through the presence of body components that reflect these physiological changes in the form of changes in some components, and the importance of research lies in studying the physiological changes accompanying the maximum physical effort and the consequent development of the level of achievement in the effectiveness of shooting with air rifle and body

... Show More
View Publication
Publication Date
Mon Dec 04 2023
Journal Name
Aip Conf. Proc
Double LA-transform and their properties for solving partial differential equations
...Show More Authors

Scopus (7)
Scopus
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
...Show More Authors

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit  governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro

... Show More
View Publication Preview PDF
Crossref