The study area soils suffer from several problems appear as tkhesvat and cracks in the roads and waterlogging which reduces the susceptibility of soil to withstand pressure, this study was conducted on the soil of the Karkh district based on field study that included (6) samples of soil physical analyses contain different ratios of (mud, sand, silt) as percentages (52%, 45%, 3 #) respectively, and liquidity limit rate (39%) Stroke rate plasticity was (20.6%) The rate coefficient of plasticity total (19.2%)0
In this research, we have added nano anatase TiO2 as a partial replacement of Portland cement by a weight percentage of (0.25 to 1%) for the development of properties for protection against bacteria. The control mix was made by using "the cement to sand" proportion about (1: 2.75) with the "water to cement" proportion of (0.5) to study the structure, porosity, water absorption, density, mechanical properties, as well as anti-bacterial behavior. Inspections have been done such as scanning electron microscopy (SEM), and atomic force microscope (AFM) for mortar. Experimental results showed that after the addition of Nano powders in cement mortar, the structural properties improved significantly with the development of hydration o
... Show MoreThe study dealt with measuring the impact of the availability of each of the content elements of the interaction, electronic services, and information on the evaluation of the users of the government website for its effectiveness in terms of the site’s functions and for measuring the site’s ability to present the organization’s tasks to customer groups.
Authority is concerned with measuring the confidence of customers in the content of the site, and in the organization as a whole. Validity is related to measuring the effectiveness of employing the site’s content to achieve the goal of its creation and in communicating with customers. Availability It is for measuring the ease of use of the site. The relevance, which means
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreAquatic macrophyte communities and environmental factors were studied at four Al-Hawizeh marsh sites from December 2017 until November 2018. Quantitative data from thirty species of aquatic plants were collected to investigate density, vegetation cover, biomass and their relationship to the environmental factors. For emerging plants, relative abundance reached the highest values (36%) than submerged and wet species, while free-floating plants produced the lowest value (17%).Physical and chemical properties have been studied including water temperature ranging from 11.3 ° C in January to 31.4 ° C in August, dissolved oxygen (DO)ranging from 1.88 mg/L in September to 10.5 mg / L in Ap
The phenomenon of informal building Spread recently in Iraqi residential areas, in general, and in Baghdad, in particular, due to the urgent housing need, on the one hand, and lack of commitment to building controls, on the other hand, to highlight the phenomenon of uncommitted building to controls and housing governing legislation in Iraq, leading to heterogeneity in both building densities and plot areas, and disorder in the urban fabric and urban escape of those areas. Research problem identified as the absence of a clear vision about the General aspects of the phenomenon of informal building in residential street scene, and the role of designed housing projects as a substitute for informal building in built residential areas. The des
... Show MoreAn attempt was made to evaluate the PV performance of one-axis daily tracking and fixed system for Baghdad, Iraq. Two experimental simulations were conducted on a PV module for that purpose. Measurements included incident solar radiation, load voltage and load current. The first experiment was carried out for six months of winter half of year to simulate the one-axis daily tracking. The azimuth angle was due south while the tilt angle was being set to optimum according to each day of simulation. The second experiment was done at one day to simulate the PV module of fixed angles. It is found that there is a significant power gain of 29.6% for the tracking system in respect to the fixed one. The one-axis daily tracking was much more effect
... Show MoreThe using of waste products as a recycled material was one of the most important studies for saving money and reduces the pollution. Mortar and concrete mixes with (10, 20 and 30)% of brick, glass and tile powder as replacement by weight of cement was investigated. The concrete mixes using brick or glass as 10%replacement of cement exhibited enhancement in compressive strength about (6, 4.7 and 2.0)% and (7.2, 5.6 and 2)% at age 7, 28 and 90 days respectively compared to reference mix. The 20% replacement of glass powder also showed an increase in the compressive strength up to (8, 6.3 and 4) %at age 7,28 and 90 days respectively compared to reference mix. Finally concrete mix using (10, 20 and 30) % tile powder as replacement of cement sho
... Show MoreThe using of waste products as a recycled material was one of the most important studies for saving money and reduces the pollution. Mortar and concrete mixes with (10, 20 and 30)% of brick, glass and tile powder as replacement by weight of cement was investigated. The concrete mixes using brick or glass as 10%replacement of cement exhibited enhancement in compressive strength about (6, 4.7 and 2.0)% and (7.2, 5.6 and 2)% at age 7, 28 and 90 days respectively compared to reference mix. The 20% replacement of glass powder also showed an increase in the compressive strength up to (8, 6.3 and 4) %at age 7,28 and 90 days respectively compared to reference mix. Finally concrete mix using (10, 20 and 30) % tile powder as replacement of cement sho
... Show More