BN Rashid
The research has designed for studying the relationship between manufacturing strategy and its flexibility under the flexible manufacturing system with their reflection on the competitive environmental performance of the firm. To interpret and tackle the problem, a hypothesis has formulated stating that “ the competitive performance of a firm is interpreted by the manufacturing strategy and flexibility which are derived from the firm and its business strategies under the flexible manufacturing system”. Related literatures with their theoretical dissertations, which enhanced the thoughtful content, have analyzed. An illustrative case study on the flexible manufacturing system at Toyota Motors Corporation working at the g
... Show MoreThe research discusses the most important goals and means of IGAD in making peace in Sudan and then regional peace.
Purpose To test the effect of strategic Supremacy on strategic success A case study in Thi Qar Governorate, methodology/approach – this is a mandatory entry.
a case study was used and applied to the Department managers of Government of the province of Thi Qar, Research limitations/implications – It is clear that the strategic Supremacy variable is not being used effectively to achieve strategic success.
Practical implications – use strategic supremacy positively to Support for strategic success. implementing and monitoring ignorance of them in how to use thi
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreThe Dirichlet process is an important fundamental object in nonparametric Bayesian modelling, applied to a wide range of problems in machine learning, statistics, and bioinformatics, among other fields. This flexible stochastic process models rich data structures with unknown or evolving number of clusters. It is a valuable tool for encoding the true complexity of real-world data in computer models. Our results show that the Dirichlet process improves, both in distribution density and in signal-to-noise ratio, with larger sample size; achieves slow decay rate to its base distribution; has improved convergence and stability; and thrives with a Gaussian base distribution, which is much better than the Gamma distribution. The performance depen
... Show More