Preferred Language
Articles
/
vRZaiocBVTCNdQwCFlS-
Low cost automatic sun path tracking system
...Show More Authors

Solar tracking systems used are to increase the efficiency of the solar cells have attracted the attention of researchers recently due to the fact that the attention has been directed to the renewable energy sources. Solar tracking systems are of two types, Maximum Power Point Tracking (MPPT) and sun path tracking. Both types are studied briefly in this paper and a simple low cost sun path tracking system is designed using simple commercially available component. Measurements have been made for comparison between fixed and tracking system. The results have shown that the trackin

Publication Date
Fri Apr 12 2019
Journal Name
Journal Of Economics And Administrative Sciences
"The role of quality costs in reducing the cost of industrial" products
...Show More Authors

Abstract :-

The aim of the research is to explain the role of quality costs their  importance and their classification, and to clarify the most important tools that help to reduce costs.

In order to achieve the objective of the research and test hypotheses adopted the descriptive approach, as well as the adoption of the analytical approach in the study of applied data has been relied upon in providing data on the financial and production reports of the research sample company, the data were used to study and analyze financial and productivity reports . A number of conclusions have been reached the most important being the following

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method
...Show More Authors

This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 23 2018
Journal Name
Journal Of Economics And Administrative Sciences
The integration between target cost to value engineering green achieve competitive advantage
...Show More Authors

Recently, there has been a major trend towards environmental issues and concern for the green product because traditional products cause serious environmental impacts such as reduced resources, global warming, energy consumption, emissions and other environmental damage. Under these developments, economic units are looking for cost-effective technologies that reduce the cost of a green product that has four main dimensions: reducing energy, reducing resource consumption, preventing pollution, and using renewable energy while not compromising quality and satisfying customers in order to enhance competitive advantage.

This research will address one of the most important cost-effective green technologies, Gr

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Mar 13 2024
Journal Name
Journal Of Robotics
Hierarchical Stabilization and Tracking Control of a Flexible-Joint Bipedal Robot Based on Anti-Windup and Adaptive Approximation Control
...Show More Authors

Bipedal robotic mechanisms are unstable due to the unilateral contact passive joint between the sole and the ground. Hierarchical control layers are crucial for creating walking patterns, stabilizing locomotion, and ensuring correct angular trajectories for bipedal joints due to the system’s various degrees of freedom. This work provides a hierarchical control scheme for a bipedal robot that focuses on balance (stabilization) and low-level tracking control while considering flexible joints. The stabilization control method uses the Newton–Euler formulation to establish a mathematical relationship between the zero-moment point (ZMP) and the center of mass (COM), resulting in highly nonlinear and coupled dynamic equations. Adaptiv

... Show More
View Publication
Scopus (3)
Scopus Clarivate Crossref
Publication Date
Wed Nov 21 2018
Journal Name
International Journal Of Control, Automation And Systems
Design and Stability Analysis of a Fractional Order State Feedback Controller for Trajectory Tracking of a Differential Drive Robot
...Show More Authors

View Publication
Scopus (21)
Crossref (18)
Scopus Clarivate Crossref
Publication Date
Wed Oct 31 2018
Journal Name
International Journal Of Research In Pharmaceutical Sciences
The impact of systemic hypertension-related heart remodeling on right ventricle mechanics: A two-dimensional echocardiographic speckle tracking study
...Show More Authors

Scopus
Publication Date
Sat Feb 01 2020
Journal Name
Journal Of Economics And Administrative Sciences
Study Impact of Some Factors on Daily Number of Hours Providing of Electricity in Baghdad City Using Path Analysis
...Show More Authors

دُرِست العوامل المؤثرة في عدد ساعات تجهيز الكهرباء في مدينة بغداد، وتكونت عينة الدراسة من (365) مشاهدة يومية لعام 2018، وتمثلت بستة متغيرات استعملت في الدراسة. كان الهدف الرئيس هو دراسة العلاقة بين هذه المتغيرات، وتقدير تأثيرات المتغيرات التنبؤية في المتغير التابع (عدد ساعات تجهيز الكهرباء في مدينة بغداد). ولتحقيق ذلك استعملت نمذجة المعادلات الهيكلية/ تحليل المسار وبرنامج AMOS

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 28 2019
Journal Name
Al-khwarizmi Engineering Journal
Heuristic D* Algorithm Based on Particle Swarm Optimization for Path Planning of Two-Link Robot Arm in Dynamic Environment
...Show More Authors

 Finding a path solution in a dynamic environment represents a challenge for the robotics researchers, furthermore, it is the main issue for autonomous robots and manipulators since nowadays the world is looking forward to this challenge. The collision free path for robot in an environment with moving obstacles such as different objects, humans, animals or other robots is considered as an actual problem that needs to be solved.  In addition, the local minima and sharp edges are the most common problems in all path planning algorithms. The main objective of this work is to overcome these problems by demonstrating the robot path planning and obstacle avoidance using D star (D*) algorithm based on Particle Swarm Optimization (PSO)

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (3)
Crossref