Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Fri Oct 09 2026
Journal Name
Journal Of Physical Education
Specifying Standard Scores and Levels for Some Physical Variables as Indicators for Selecting Youth Soccer Players Aged (17 – 19) years Old
...Show More Authors

View Publication
Publication Date
Sun Aug 13 2023
Journal Name
Arpn Journal Of Engineering And Applied Sciences
A NEW APPROACH FOR MODELLING THE VIBRATION OF BEAMS UNDER MOVING LOAD EFFECT
...Show More Authors

In this paper, a new equivalent lumped parameter model is proposed for describing the vibration of beams under the moving load effect. Also, an analytical formula for calculating such vibration for low-speed loads is presented. Furthermore, a MATLAB/Simulink model is introduced to give a simple and accurate solution that can be used to design beams subjected to any moving loads, i.e., loads of any magnitude and speed. In general, the proposed Simulink model can be used much easier than the alternative FEM software, which is usually used in designing such beams. The obtained results from the analytical formula and the proposed Simulink model were compared with those obtained from Ansys R19.0, and very good agreement has been shown. I

... Show More
View Publication Preview PDF
Scopus (3)
Scopus Crossref
Publication Date
Fri Oct 09 2026
Journal Name
Journal Of Physical Education
Some Strength Tests&#39; Percentile Degree As Indicators for Selecting Iraqi Youth Weightlifters Aged 14 – 16 Years old
...Show More Authors

View Publication
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Using a novel approach to determine the pore pressure of West Qurna 15 oil well in South of Iraq
...Show More Authors

Pore pressure means the pressure of the fluid filling the pore space of formations. When pore pressure is higher than hydrostatic pressure, it is named abnormal pore pressure or overpressure. When abnormal pressure occurred leads to many severe problems such as well kick, blowout during the drilling, then, prediction of this pressure is crucially essential to reduce cost and to avoid drilling problems that happened during drilling when this pressure occurred. The purpose of this paper is the determination of pore pressure in all layers, including the three formations (Yamama, Suliay, and Gotnia) in a deep exploration oil well in West Qurna field specifically well no. WQ-15 in the south of Iraq. In this study, a new appro

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sat Jul 05 2025
Journal Name
Journal Of Machine And Computing
Cyber Neutrosophic Model for Secure and Uncertainty Aware Evaluation in Indoor Design Projects
...Show More Authors

To perform a secure evaluation of Indoor Design data, the research introduces a Cyber-Neutrosophic Model, which utilizes AES-256 encryption, Role-Based Access Control, and real-time anomaly detection. It measures the percentage of unpredictability, insecurity, and variance present within model features. Also, it provides reliable data security. Similar features have been identified between the final results of the study, corresponding to the Cyber-Neutrosophic Model analysis, and the cybersecurity layer helped mitigate attacks. It is worth noting that Anomaly Detection successfully achieved response times of less than 2.5 seconds, demonstrating that the model can maintain its integrity while providing privacy. Using neutrosophic sim

... Show More
View Publication
Scopus Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
apply Six Sigma in improving the quality of projects added expert system )Applied research(
...Show More Authors

Construction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.

Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.

The idea of the research came after the need to improve the performance o

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)
...Show More Authors

This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Jan 30 2025
Journal Name
Iraqi Journal Of Science
Development of A New Colorimetric-Flow System Approach for The Determination of Cefotaxime Sodium in Pharmaceutical Formulations
...Show More Authors

     A new colorimetric-flow injection method has been developed and validated for the detection of Cefotaxime sodium in pharmaceutical formulations. This method stands out for its rapid and sensitive nature. The formation of a brown-colored complex between Cefotaxime sodium and the Biuret reagent in a highly alkaline environment serves as the basis for the detection. The intensity of this colored complex is measured using a custom-built Continuous Flow Injection Analyzer, enabling accurate quantification of Cefotaxime sodium. Optimization studies of the chemical and physical parameters such as dilution of Biuret reagent, effect of the medium basicity, flow rate, sample loop and others have been investigated. The calibration gra

... Show More
View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Mon Mar 01 2021
Journal Name
Journal Of Management In Engineering
Identifying Pertinent Indicators for Assessing and Fostering Diversity, Equity, and Inclusion of the Construction Workforce
...Show More Authors

View Publication
Scopus (80)
Crossref (76)
Scopus Clarivate Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc