Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.
The research aims to identify ways of upgrading the quality level of university education at the Middle Technical University in light of its application for the National Ranking project for the quality of Iraqi universities in order to obtain advanced grades among the Iraqi universities , Which is qualified to enter the Ranking of universities worldwide, through displaying the mechanism of the Application of National Ranking project for the quality of Iraqi universities in the Middle Technical University and its formations consisting of (5) technical colleges and (11) technical institute.
The results of the application showed several observations: The most
... Show MoreThe research aims to shed light on the financing structure, which is one of the important pillars of financial management in the commercial banking sector, which enhances its financial position through financing its various investments, which is one of the pillars of the successful economy of the commercial banking sector. in which country. The contents of the research variables, which were represented by the independent variable, financing structure, the dependent variable, and investment decisions in commercial banks, which the researcher tried to address, as the research began with a basic variable that depends on diagnosing the impact of the financin
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show More The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.