Preferred Language
Articles
/
uhfn544BVTCNdQwC6Fmh
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Wed Nov 01 2023
Journal Name
College Of Physical Education And Sports Science
Electronic shorts for the disabled
...Show More Authors

Publication Date
Thu Feb 17 2022
Journal Name
Journal Of Discrete Mathematical Sciences And Cryptography
Periodical split for the groups
...Show More Authors

View Publication
Scopus (14)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Thu Nov 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The Quality of University Education at the Middle Technical University in The Light of the Application of National Ranking project for the Quality of Iraqi Universities
...Show More Authors

The research aims to identify ways of upgrading the quality level of university education at the Middle Technical University in light of its application for the National Ranking project for the quality of Iraqi universities in order to obtain advanced grades among the Iraqi universities , Which is qualified to enter the Ranking of universities worldwide, through displaying the mechanism of the Application of  National Ranking project for the quality of Iraqi universities in the Middle Technical University and its formations consisting of (5) technical colleges and (11) technical institute.

        The results of the application showed several observations: The most

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Feb 02 2019
Journal Name
Journal Of The College Of Education For Women
The Efficctency of the mesopotamian company for seed production
...Show More Authors

0

View Publication Preview PDF
Publication Date
Mon Aug 28 2023
Journal Name
Cureus
The Enigma of the Impervious Nobel Prize for Neurosurgeons
...Show More Authors

View Publication Preview PDF
Clarivate Crossref
Publication Date
Sun Mar 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
The philosophy of Total Quality Management for the environment
...Show More Authors
The Environmental Management System (EMS) is an important foundation for effective control of the organization's outstanding environmental performance. It applies standards for substantive review and provides a structure and a way to apply it in all aspects of th
... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 01 2023
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The impact of the financing structure on investment decisions : Applied research in a sample of commercial banks listed in the Iraq Stock Exchange for the period (2011-2020)
...Show More Authors

               The research aims to shed light on the financing structure, which is one of the important pillars of financial management in the commercial banking sector, which enhances its financial position through financing its various investments, which is one of the pillars of the successful economy of the commercial banking sector. in which country. The contents of the research variables, which were represented by the independent variable, financing structure, the dependent variable, and investment decisions in commercial banks, which the researcher tried to address, as the research began with a basic variable that depends on diagnosing the impact of the financin

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 01 2018
Journal Name
Journal Of Engineering
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Publication Date
Mon Jan 01 2018
Journal Name
International Journal Of Science And Research (ijsr)
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost

... Show More
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

  The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs.         All of these arcs are incomplete.         The number of distinct (12,3)-arcs are six, two of them are complete.         There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete.         There exists one complete (15,3)-arc.
 

View Publication Preview PDF