Preferred Language
Articles
/
tBd1yZEBVTCNdQwCgprl
Impact of long-term depletion on horizontal wellbore stability in tight reservoirs-including changes in petrophysical and geomechanical properties
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Sat Jan 01 2022
Journal Name
Geotechnical Engineering And Sustainable Construction
Stability and Seismic Performance of Tall Steel Structures with Hybrid Energy Absorbers Including P-Delta Effect
...Show More Authors

View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sun Mar 31 2024
Journal Name
Iraqi Geological Journal
Exploring the Impact of Petrophysical Uncertainties on Recoverable Reserves: A Case Study
...Show More Authors

Reliable estimation of critical parameters such as hydrocarbon pore volume, water saturation, and recovery factor are essential for accurate reserve assessment. The inherent uncertainties associated with these parameters encompass a reasonable range of estimated recoverable volumes for single accumulations or projects. Incorporating this uncertainty range allows for a comprehensive understanding of potential outcomes and associated risks. In this study, we focus on the oil field located in the northern part of Iraq and employ a Monte Carlo based petrophysical uncertainty modeling approach. This method systematically considers various sources of error and utilizes effective interpretation techniques. Leveraging the current state of a

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Wed Dec 30 2020
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Petrophysical Properties of Khasib Formation in East Baghdad Oil Field Southern Area
...Show More Authors

Petrophysical properties evaluation from well log analysis has always been crucial for the identification and assessment of hydrocarbon bearing zones. East Baghdad field is located 10 km east of Baghdad city, where the southern area includes the two southern portions of the field, Khasib formation is the main reservoir of East Baghdad oil field.

In this paper, well log data of nine wells have been environmentally corrected, where the corrected data used to determine lithology, shale volume, porosity, and water saturation. Lithology identified by two methods; neutron-density and M-N matrix plots, while the shale volume estimated by single shale indicator and dual shale indicator, The porosity is calculated from the three common po

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Feb 28 2023
Journal Name
Iraqi Geological Journal
Estimation of Petrophysical Properties for Zubair Reservoir in Abu-Amood Oil Field
...Show More Authors

The petrophysical analysis is significant to determine the parameters controlling the production wells and the reservoir quality. In this study, Using Interactive petrophysics software to analyze the petrophysical parameters of five wells penetrated the Zubair reservoir in the Abu-Amood field to evaluate a reservoir and search for hydrocarbon zones. The available logs data such as density, sonic, gamma ray, SP, neutron, and resistivity logs for wells AAm-1, AAm-2, AAm-3, AAm-4, and AAm-5 were used to determine the reservoir properties in Zubair reservoir. The density-neutron and neutron-sonic cross plots, which appear as lines with porosity scale ticks, are used to distinguish between the three main lithologies of sandstone, limesto

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Dec 01 2014
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Impact of Applying the Percentage of Complete Method or the Complete Contract One on the Taxation of the Long – Term Construction Contracts: بحث تطبيقي في الهيئة العامة للضرائب – قسم الشركات
...Show More Authors

The research aims to shed light on the amount of proceeds annual tax for each of the way the contract total and percentage of completion method - see which is better - as well as the current problems arising from the application method of the contract in full in settling accounts tax - to identify problems - related to postpone settling accounts tax in accordance with the way the contract fully and determine the advantages and disadvantages of each of the methods through practical application , and then use the results as inputs to help in the decision to confirm the continuation of the GCT using a full decade in settling accounts tax for long-term construction contracts or forgo them.

Were the result of research the existence of

... Show More
View Publication Preview PDF
Publication Date
Tue Jan 01 2019
Journal Name
World Journal Of Dentistry
Assessment of Implant Stability Changes and Success Rate of Narrow Dental Implants
...Show More Authors

Aims: To assess the success rate and implant stability changes of narrow dental implants (NDIs) during the osseous healing period. Materials and methods: This prospective observational clinical study included 21 patients with narrow alveolar ridge of restricted mesiodistal interdental span who received NDIs. The alveolar ridge width was determined by the ridge mapping technique. Implant stability was measured using Periotest® M immediately after implant insertion then after 4 weeks, 8 weeks and 12 weeks postoperatively. The outcome variables were success rate and implant stability changes during the healing period. The statistical analysis included one-way analysis of variance (ANOVA) and Tukey\'s multiple comparisons test, values < 0.05 w

... Show More
View Publication
Scopus Crossref
Publication Date
Fri Sep 08 2023
Journal Name
Hammurabi Journal For Studies
The Impact of the Political Process on Government Stability in Iraq After 2003
...Show More Authors

The research in the variables of the political process and government stability tried to show the impact of the political process on political stability first, and then on government stability second, given that the political process that was established in 2005 was aimed at achieving legitimacy, and its most prominent tools are elections, leading to achieving political stability, including government stability. The issue of governmental stability is one of the important issues in Iraq, but it has not been achieved, as a result of several factors, including problems in political action, as the political process has not succeeded in leading Iraq to stability.

View Publication Preview PDF
Publication Date
Mon Jun 01 2020
Journal Name
Journal Of Engineering
Petrophysical Properties and Well Log Interpretations of Tertiary Reservoir in Khabaz Oil Field / Northern Iraq
...Show More Authors

The aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Mar 30 2025
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Determination of petrophysical properties of Sadi Formation in Halfaya oil field, southern Iraq
...Show More Authors

   This study aimed to evaluate the reservoir petrophysical properties (porosity, water saturation, and permeability) for optimal flow unit assessment within the Sadi Formation. Utilizing open hole logging data from five wells, the Sadi formation was divided into two rock units. The upper unit (A) is 45-50 meters thick, mainly consisting of limestone, mainly consisting of shaly limestone at the lower part. The lower unit (B) has a thickness of approximately 75-80 meters and is primarily composed of limestone, further subdivided into three subunits (B1, B2, B3). The average water resistivity is 0.04 ohm-m, and the average mud filtrate resistivity is 0.06 ohm-m. The Pickett plot was utilized to determine Archie parameters (tortuosit

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 16 2023
Journal Name
Political Sciences Journal
Peaceful coexistence between social components and its impact on political stability in the province of Nineveh
...Show More Authors

The issue of peaceful coexistence between societies is the topic of the hour, as it is one of the important issues in this era, especially in days when conflicts and conflicts abound, and even wars in the name of religion, gender, race, language, and the like. The world, so that single-mindedness and adherence to one opinion and intolerance to it became the method of dialogue in our world today, as writing in the field of peaceful coexistence, peace-building, tolerance, pluralism, and acceptance of the other is one of the new fields of knowledge in Iraq in general and in Nineveh Governorate in particular, as peaceful coexistence is one of the basic needs And necessary for the presence of individuals in societies, and it requires the achi

... Show More
View Publication Preview PDF
Crossref