A cut-off low is a closed low with a low value of geopotential height at the upper atmospheric levels that has been fully detached (cut-off) from the westerly flow and move independently. A cut-off low causes extreme rainfall events in the mid-latitudes regions. The main aim of this paper is to investigate the cut-off low at 500 hPa over Iraq from a synoptic point of view and the behavior of geopotential height at 500 hPa. To examine the association of the cut-off low at 500 hPa with rainfall events across Iraq, two case studies of heavy rainfall events from different times were conducted. The results showed that the cut-off low at 500 hPa with a low value of geopotential height will strengthen the low-pressure system at the surface, lea
... Show MoreTo identify the fungi associated with water hyacinth (Eichhornia crassipes [Mart.] Solms), an aquatic weed, which presents in Tigris river from Baghdad south ward. Five regions from middle and south of Iraq (Al-Noumanya, Saeid Bin-Jubier, Al-Azizia, Al-Reyfay and Al-Hay) were selected for this study. Twelve fungal species were isolated. Alternaria alternata, Acremonium sp and Cladsporium herbarum, were the most frequently species (91.66 % ,50 % and 25 %) respectively. The fungi Alternaria alternata, Acremonium sp. and Phoma eupyrena were more aggressive to water hyacinth as (91.66%,83,33%, and 75%) in pathogenicity test.
Drilling operations in the Halfaya oilfield frequently encounter severe wellbore instability challenges. When navigating shale deposits, wellbore instability remains the primary operational concern. Based on the analysis of the wellbore instability intervals, low-strength shale and marlstone formations are identified as the principal unstable zones that lead to non-productive time and higher drilling costs. By planning a safe operating mud window, these non-productive times and drilling costs can be mitigated. Several wellbore instability concerns have been found in a southern Iraqi oil field. A problem-diagnostic technique was done by evaluating well log data, drilling reports, mud logging reports, and pore pressure readings.
... Show More|
Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a fr |
Due to increased consumption of resources, especially energy it was necessary to find alternatives characterized by the same quality as well as being of less expensive, and most important of these alternatives are characterized by waste and the fact that humancannot stop consumption. So we have consideredwaste as an alternative and cheap economic resources and by using environmental index the MIP (input materials per unit ,unit / service) is based on the grounds that the product is not the end of itselfit is a product to meet the need of a product or service, awarded a resource input and output within the five basic elements are the raw materials is ecological, Raw materials ecological, water, air and soil erosion for a
... Show MoreLand Use / Land Cover (LULC) classification is considered one of the basic tasks that decision makers and map makers rely on to evaluate the infrastructure, using different types of satellite data, despite the large spectral difference or overlap in the spectra in the same land cover in addition to the problem of aberration and the degree of inclination of the images that may be negatively affect rating performance. The main objective of this study is to develop a working method for classifying the land cover using high-resolution satellite images using object based method. Maximum likelihood pixel based supervised as well as object approaches were examined on QuickBird satellite image in Karbala, Iraq. This study illustrated that
... Show MoreAbstractBackground:Reduced glomeular filtration rate isassociated with increasedmorbidity in patientswith coronary arterydisease.Objectives :To analyze the declining eGFR andmortality risks in a patients with Chronic KidneyDisease and have had Coronary Artery Diseaseincluding risk factors .Patientsand Methods:The study included (160)patientsbetween the ages of 16 and 87years.Glomerular filtration rate was estimated (eGFR)using the Modification of Diet in Renal Diseaseequationand was categorized in the ranges<60 mL· min−1 per 1.73 m2and≥ 60 ml/min/1.73 m2.Baseline risk factors were analyzed by category ofeGFR,.The studied patients in emergencydepartment, were investigatedusing Coxproportional hazard models adjusting for traditiona
... Show MoreThe Zubair reservoir in the Abu-Amood field is considered a shaly sand reservoir in the south of Iraq. The geological model is created for identifying the facies, distributing the petrophysical properties and estimating the volume of hydrocarbon in place. When the data processing by Interactive Petrophysics (IP) software is completed and estimated the permeability reservoir by using the hydraulic unit method then, three main steps are applied to build the geological model, begins with creating a structural, facies and property models. five zones the reservoirs were divided (three reservoir units and two cap rocks) depending on the variation of petrophysical properties (porosity and permeability) that results from IP software interpr
... Show MoreBuilding a geological model is an essential and primary step for studying the reservoir’s hydrocarbon content and future performance. A three-dimensional geological model of the Asmari reservoir in Abu- Ghirab oil field including structure, stratigraphy, and reservoir petrophysical properties, has been constructed in the present work. As to underlying Formations, striking slip faults developed at the flank and interlayer normal. Abu Ghirab oilfields are located on the eastern anticlinal band, which has steadily plunged southward. 3D seismic interpretation results are utilized to build the fault model for 43 faults of the Asmari Formation in Abu Ghirab Oilfield. A geographic facies model with six different rock facies types
... Show MoreEfficient and cost-effective drilling of directional wells necessitates the implementation of best drilling practices and advanced techniques to optimize drilling operations. Failure to adequately consider drilling risks can result in inefficient drilling operations and non-productive time (NPT). Although advanced drilling techniques may be expensive, they offer promising technical solutions for mitigating drilling risks. This paper aims to demonstrate the effectiveness of advanced drilling techniques in mitigating risks and improving drilling operations when compared to conventional drilling techniques. Specifically, the advanced drilling techniques employed in Buzurgan Oil Field, including vertical drilling with mud motor, managed pres
... Show More