Preferred Language
Articles
/
sBZ3rIoBVTCNdQwCKqLO
Petroleum system modeling and risk assessments of Ad’daimah oil field: a case study from Mesan Governorate, south Iraq
...Show More Authors

Scopus Clarivate Crossref
View Publication
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Reservoir Sedimentation Assessment Using Geospatial Technology: A case Study of Dukan Reservoir, Sulaimani Governorate, Kurdistan Region, Iraq
...Show More Authors

The accumulation of sediment in reservoirs poses a major challenge that impacts the storage capacity, quality of water, and efficiency of hydroelectric power generation systems. Geospatial methods, including Geographic Information Systems (GIS) and Remote Sensing (RS), were used to assess Dukan Reservoir sediment quantities. Satellite and reservoir water level data from 2010 to 2022 were used for sedimentation assessment. The satellite data was used to analyze the water spread area, employing the Normalized Difference Water Index (NDWI) and Modified Normalized Difference Water Index (MNDWI) to enhance the water surface in the satellite imagery of Dukan Reservoir. The cone formula was employed to calculate the live storag

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Nov 01 2020
Journal Name
International Journal Of Engineering
Pavement Maintenance Management Using Multi-objective Optimization: (Case Study: Wasit Governorate-Iraq)
...Show More Authors

View Publication
Scopus (5)
Scopus Clarivate Crossref
Publication Date
Mon Oct 08 2018
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
TOTAL ORGANIC CARBON (TOC) PREDICTION FROM RESISTIVITY AND POROSITY LOGS: A CASE STUDY FROM IRAQ
...Show More Authors

     The open hole well log data (Resistivity, Sonic, and Gamma Ray) of well X in Euphrates subzone within the Mesopotamian basin are applied to detect the total organic carbon (TOC) of Zubair Formation in the south part of Iraq. The mathematical interpretation of the logs parameters helped in detecting the TOC and source rock productivity. As well, the quantitative interpretation of the logs data leads to assigning to the organic content and source rock intervals identification. The reactions of logs in relation to the increasing of TOC can be detected through logs parameters. By this way, the TOC can be predicted with an increase in gamma-ray, sonic, neutron, and resistivity, as well as a decrease in the density log

... Show More
View Publication Preview PDF
Scopus (10)
Crossref (4)
Scopus Crossref
Publication Date
Sun Jun 23 2019
Journal Name
Arma
Safe Mud Weight Window Determination: A Case Study from Southern Iraq
...Show More Authors

ABSTRACT:. The Lower Cretaceous Zubair formation is comprised of sandstones intercalated with shale sequences. The main challenges that were encountered while drilling into this formation included severe wellbore instability-related issues across the weaker formations overlaying the reservoir section (pay zone). These issues have a significant impact on well costs and timeline. In this paper, a comprehensive geomechanical study was carried out to understand the causes of the wellbore failure and to improve drilling design and drilling performance on further development wells in the field. Failure criteria known as Mogi-Coulomb was used to determine an operating mud weight window required for safe drilling. The accuracy of the geomechanical

... Show More
View Publication Preview PDF
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Nov 12 2020
Journal Name
Journal Of Petroleum Research And Studies
Production Optimization for Natural Flow and ESP Well A Case Study on Well NS-5 Mishrif Formation-Nasriya Oil Field
...Show More Authors

As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Jul 31 2019
Journal Name
Journal Of Engineering
Asphaltene Precipitation Modeling of Sadi Formation in Halfaya Iraqi Oil Field
...Show More Authors

Asphaltene is a component class that may precipitate from petroleum as a highly viscous and sticky material that is likely to cause deposition problems in a reservoir, in production well, transportation, and in process plants. It is more important to locate the asphaltene precipitation conditions (precipitation pressure and temperature) before the occurring problem of asphaltene deposition to prevent it and eliminate the burden of high treatment costs of this problem if it happens. There are different models which are used in this flow assurance problem (asphaltene precipitation and deposition problem) and these models depend on experimental testing of asphaltene properties. In this study, the used model was equation of

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Sep 30 2012
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Increasing of Oil Field Productivity by Implementation of Re-entry Horizontal Injection Well, Case study
...Show More Authors

Water flooding is one of the most important methods used in enhanced production; it was a pioneer method in use, but the development of technology within the oil industry, takes this subject toward another form in the oil production and application in oil fields with all types of oils and oil reservoirs. Now days most of the injection wells directed from the vertical to re-entry of full horizontal wells in order to get full of horizontal wells advantages.
This paper describes the potential benefits for using of re-entry horizontal injection wells as well as combination of re –entry horizontal injection and production wells. Al Qurainat productive sector was selected for study, which is one of the four main productive sectors of Sout

... Show More
View Publication Preview PDF
Publication Date
Fri Nov 30 2018
Journal Name
Iop Conference Series: Materials Science And Engineering
Estimating the PVT Properties for Crude Oil from a Southern Iraqi Oil Field
...Show More Authors

View Publication
Scopus (3)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sun Nov 07 2021
Journal Name
Review Of International Geographical Education Online
Assessment of Information Security Risk Management System based on ISO/IEC27005 in the Independent High Electoral Commission: A Case Study
...Show More Authors

The current research aims to study the extent to which the Independent High Electoral Commission applies to information security risk management by the international standard (ISO / IEC27005) in terms of policies, administrative and technical procedures, and techniques used in managing information security risks, based on the opinions of experts in the sector who occupy positions (General Manager The directorate, department heads and their agents, project managers, heads of divisions, and those authorized to access systems and software). The importance of the research comes by giving a clear picture of the field of information security risk management in the organization in question because of its significant role in identifying risks and s

... Show More
View Publication Preview PDF
Scopus