Preferred Language
Articles
/
rhbYGocBVTCNdQwCrTdP
Investigating geomechanical considerations on suitable layer selection for hydraulically fractured horizontal wells placement in tight reservoirs
...Show More Authors

Scopus
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of

... Show More
View Publication
Crossref
Publication Date
Sun Dec 30 2012
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Hydrodynamic Pressure Gradient Correlation of Some Iraqi Oil Wells
...Show More Authors

Empirical equation has been presented to predict the optimum hydrodynamic
pressure gradient with optimum mud flow rate (one equation) of five Iraqi oil wells
to obtain the optimum carrying capacity of the drilling fluid ( optimum transport
cuttings from the hole to the surface through the annulus).
This equation is a function of mud flow rate, mud density and penetration
rate without using any charts or graphs.
The correlation coefficient accuracy is more than 0.9999.

View Publication Preview PDF
Publication Date
Wed Jun 30 2010
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Producing Oil from Dead Oil Wells Using injected LPG
...Show More Authors

In order to reduce hydrostatic pressure in oil wells and produce oil from dead oil wells, laboratory rig was constructed, by injecting LPG through pipe containing mixture of two to one part of East Baghdad crude oil and water. The used pressure of injection was 2.0 bar, which results the hydrostatic pressure reduction around 246 to 222 mbar and flow rate of 34.5 liter/hr fluid (oil-water), at 220 cm injection depth. Effects of other operating parameters were also studied on the behavior of two phase flow and on the production of oil from dead oil wells.

View Publication Preview PDF
Publication Date
Mon Mar 30 2020
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Optimization of Hole Cleaning and Cuttings Removal in High Inclined Till Horizontal Well
...Show More Authors

The goal of this experimental study is to determine the effects of different parameters (Flow rate, cuttings density, cuttings size, and hole inclination degree) on hole cleaning efficiency. Freshwater was used as a drilling fluid in this experiment. The experiments were conducted by using flow loop consist of approximately 14 m (46 ft) long with transparent glass test section of 3m (9.84 ft.) long with 4 inches (101.6 mm) ID, the inner metal drill pipe with 2 inches (50.8 mm) OD settled with eccentric position positive 0.5. The results obtained from this study show that the hole cleanings efficiency become better with high flow rate (21 m3/hr) and it increase as the hole inclination angles increased from 60 to 90 degree due to dominated

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Jun 18 2025
Journal Name
Journal Of Baghdad College Of Dentistry
The initial stability of dental implant with horizontal plate (An in vitro study)
...Show More Authors

Background: The Initial (primary) stability is one of the factors that play an important role in the success of the dental implants. The purpose of this study was to evaluate the initial stability of dental implant with horizontal plate by using five analytical tests: insertion torque, removal torque, resonance frequency analysis, push-in test and pull-out test. Materials and methods: Two different lengths of dental implants (5mm and 10mm) were tested in this study; each dental implant was 4mm in diameter with a square threads shape of 1mm pitch and 0.5mm depth. The crestal area was 4.2mm diameter contained a right angle margin circumferential ring while the apical area was tapered with two self-tapping grooves. In this study, the initial s

... Show More
View Publication Preview PDF
Publication Date
Sat May 01 2021
Journal Name
Journal Of Physics: Conference Series
Evaluate the performance of horizontal flow wetlands as an option for tertiary treatment of secondary sedimentation basins
...Show More Authors
Abstract<p>Constructed wetlands (CWs) are simple low-cost wastewater treatment units that use natural process to improve the effluent water quality and make it possible for its reuse.in this study used the horizontal flow system for the tertiary treatment of wastewater effluent from secondary basins at Al-Rustamiya wastewater treatment plant / old project / Baghdad / Iraq. the Phragmites Australis plant was used for wastewater treatment and the horizontal subsurface flow system was applied. the experimental study was carried out in February 2020 to October 2020. the parameters were monitored for a period of five weeks, Concentration-based average removal efficiencies for HSSF-CW were COD,53% [NO</p> ... Show More
View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sun Jan 01 2017
Journal Name
Lecture Notes In Computer Science
The Art of Using Cross-Layer Design in Cognitive Radio Networks
...Show More Authors

View Publication
Scopus (1)
Scopus Crossref
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
A GENERAL VELOCITY PROFILE FOR A LAMINAR BOUNDARY LAYER OVER FLAT PLATE WITH ZERO INCIDENCE
...Show More Authors

A general velocity profile for a laminar flow over a flat plate with zero incidence is obtained by employing a new boundary condition to the other available boundary conditions. The general velocity profile is mathematically simple and nearest to the exact solution. Also other related values, boundary layer thickness, displacement thickness, momentum thickness and coefficient of friction are nearest to the exact solution compared with other corresponding values for other researchers.

View Publication Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Indian Journal Of Natural Sciences
Determination of the Electron Density Variation for Ionosphere Layer Over Iraqi Zone Using IRI Model
...Show More Authors

KA Hadi, AH Asma’a, IJONS, 2018 - Cited by 1

View Publication
Publication Date
Thu Dec 01 2022
Journal Name
Journal Of Engineering
The Optimum Reinforcement Layer Number for Soil under the Ring Footing Subjected to Inclined Load
...Show More Authors

The primary components of successful engineering projects are time, cost, and quality. The use of the ring footing ensures the presence of these elements. This investigation aims to find the optimum number of geogrid reinforcement layers under ring footing subjected to inclined loading. For this purpose, experimental models were used. The parameters were studied to find the optimum geogrid layers number, including the optimum geogrid layers spacing and the optimum geogrid layers number. The optimum geogrid layers spacing value is 0.5B. And as the load inclination angle increased, the tilting and the tilting improvement percent for the load inclination angles (5°,10°,15°) are (40%,28%, and 5%) respectively. The reduction percent o

... Show More
View Publication
Crossref (3)
Crossref