Background: Postpartum hemorrhage is an important cause of maternal morbidity and mortality. Considerable difference of opinion exist regarding the optimal approach to the management of the 3rd stage of labour, practice varies between countries &between units.Objectives: To evaluate the effectiveness of intra umbilical vein injection of oxytocin and umbilical cord driange in shortening the duration of third stage of labour.Patient and Methods: In this randomized controlled study, 100 women were enrolled in this study they divided into three groups. (Group 1 ,N =30 )received 20 units of oxytocin diluted in 20 ml 0.9% saline solution injected in the umbilical vein after clamping.(Group 2, N = 34) placental cord drainage.(Group 3, N= 36) with no intervention. The primary outcome was mean duration of third stage of labor.Results: The third stage of labor was significantly shorter in group 1 and 2 as compared to group 3. Groups 1 shorten the duration of third stage of labor by 3 min. and group 2 shorten the duration of third stage of labor by 4.27 min.There were no reports of need for manual removal of placenta or retained placenta.Conclusion: The use of intraumbilical injection of oxytocin and placental cord drainage in the third stage of labor significantly reduced the duration of the third stage.
Personal intelligence is thinking about an other person , understanding him, have sympathy and differentiation between people, and to appreciate their own point of view, with the sensitivity to their motives, behavior, and goals, so this intelligence involves dealing with a person or group of persons effectively and in normal or logical manner.
Emotions management is to achieve emotional balance by controlling the emotions continuously, self disciplining, keeping away from excitement sources, and dealing with bad situations in constructive way to achieve the psychological stability .
- the study aims
The goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch
... Show MoreA three-stage learning algorithm for deep multilayer perceptron (DMLP) with effective weight initialisation based on sparse auto-encoder is proposed in this paper, which aims to overcome difficulties in training deep neural networks with limited training data in high-dimensional feature space. At the first stage, unsupervised learning is adopted using sparse auto-encoder to obtain the initial weights of the feature extraction layers of the DMLP. At the second stage, error back-propagation is used to train the DMLP by fixing the weights obtained at the first stage for its feature extraction layers. At the third stage, all the weights of the DMLP obtained at the second stage are refined by error back-propagation. Network structures an
... Show MorePurpose: The present study seeks to examine various history stages in which undergone by the concept of scenarios, and development of this concept to integration with the strategic management practices:
Methodology: The current study relied on a literature review and approach in providing total picture of different stages undergone by this concept.
The main results: the scenarios did not reach maturity in their quest for integration with strategic management, and still need a great effort for the maturation of this thought in the framework of strategic management, and through it can contribute in creating important knowledge evolution.
Originality and value: providing a contemporary model linking the roots of this concept and cu
Clean water supply is one of the major factors contributing significantly to society’s socio-economic transformation by improving living standards, health, and increasing productivity. It is imperative to plan and construct appropriate water supply systems in modern society, which supply various segments of society with safe drinking water according to their requirements to ensure adequate and quality water supply. In the current study, here was an attempt to develop a model for geographic information systems to manage the assets of the water distribution networks in the Karrada region and to evaluate the network geometrically, and from the results of the engineering analysis of the
This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show More
This research aims to understand complexity management and its impact on the use of the dynamic capabilities of a sample of private colleges. Private colleges are currently facing many crises, changes, unrest and high competitive pressures. Which is sometimes difficult or even impossible to predict. The recruitment of dynamic capabilities is also one of the challenges facing senior management at private colleges to help them survive and survive. Thus, the problem of research was (there is a clear insufficiency of interest in Complexity Management and trying to employ it in improving the dynamic capabilities of Colleges that have been discussed?). A group of private colleges was selected as a
... Show MoreThis study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show More
The current research aims to validate the Effect of technical innovation on human resources management ambidexterity through job embeddedness. The current research was done in Al-Etihad Food Industries Co. Ltd. And within the industrial environment, the research was designed according to the descriptive research. And to achieve the main goal of the research above, the researcher used the questionnaire as a key instrument to collect data through the views of a sample of managers, and employees at the senior, middle and executive management level. The research sample reached (107) individuals, the data were analysed using the statistical packages (SPSS v. 26) and ( SMART PLS v 3. 3. 8) the group of statistical
... Show More