Background: Postpartum hemorrhage is an important cause of maternal morbidity and mortality. Considerable difference of opinion exist regarding the optimal approach to the management of the 3rd stage of labour, practice varies between countries &between units.Objectives: To evaluate the effectiveness of intra umbilical vein injection of oxytocin and umbilical cord driange in shortening the duration of third stage of labour.Patient and Methods: In this randomized controlled study, 100 women were enrolled in this study they divided into three groups. (Group 1 ,N =30 )received 20 units of oxytocin diluted in 20 ml 0.9% saline solution injected in the umbilical vein after clamping.(Group 2, N = 34) placental cord drainage.(Group 3, N= 36) with no intervention. The primary outcome was mean duration of third stage of labor.Results: The third stage of labor was significantly shorter in group 1 and 2 as compared to group 3. Groups 1 shorten the duration of third stage of labor by 3 min. and group 2 shorten the duration of third stage of labor by 4.27 min.There were no reports of need for manual removal of placenta or retained placenta.Conclusion: The use of intraumbilical injection of oxytocin and placental cord drainage in the third stage of labor significantly reduced the duration of the third stage.
the influence of permeability tensor upon drainage of anisotropic soils under ponded water and steady recharge (rainfall) is theoretically investigated. Tensorial permeability has led to the formulation of mixed type partial differential equations. Since there is no analytical solution to this problem, the formulation is therefore solved numerically by the method of finite elements. The finite element formulation is implemented into a computer model which can be applied to any problem of seepage under steady state
conditions. Two different example problems representing two different flow conditions under full anisotropy have been studied. Results of the model for the isotropic case were checked against exact mathematical solutions de
This Book is intended to be a textbook studied for undergraduate course in financial statistics/ department of Financial Sciences and Banking. This book is designed to be used in semester system. To achieve the goals of the book, it is divided into the following chapters. Chapter one introduces basic concepts. Chapter two devotes to frequency distribution and data representation. Chapter three discusses central tendency measures (all types of means, mode, and median). Chapter four deals with dispersion Measures (standard deviation, variance, and coefficient of variation). Chapter five concerned with correlation and regression analysis. While chapter six concerned with testing Hypotheses (One population mean test, Two "independent" populati
... Show MoreIn this paper the oscillation criterion was investigated for all solutions of the third-order half linear neutral differential equations. Some necessary and sufficient conditions are established for every solution of (a(t)[(x(t)±p(t)x(?(t) ) )^'' ]^? )^'+q(t) x^? (?(t) )=0, t?t_0, to be oscillatory. Examples are given to illustrate our main results.
Direct contact membrane distillation is an effective method for production of fresh water from saline water. In this study two samples were used as feed solutions; the first one was RO waste from Al-Hilla Coca-Cola Factory (TDS= 2382 mg/l) and the other was Haji Ali drainage water (TDS= 4127 mg/l). Polytetrafluoroethylene (PTFE) hydrophobic membrane supported with polypropylene (PP) was used as flat sheet form with plate and frame cell. Results proved that membrane distillation is an effective technique to produce fresh water with high quality from brine with low salinity content. With membrane area of 8x8 cm2, the volume of treated water decreased from 34.97 ml at first half hour to 33.02 ml after 180 min of
... Show MoreThe CO2-Assisted Gravity Drainage process (GAGD) has been introduced to become one of the mostinfluential process to enhance oil recovery (EOR) methods in both secondary and tertiary recovery through immiscibleand miscible mode. Its advantages came from the ability of this process to provide gravity-stable oil displacement forenhancing oil recovery. Vertical injectors for CO2 gas have been placed at the crest of the pay zone to form a gas capwhich drain the oil towards the horizontal producing oil wells located above the oil-water-contact. The advantage ofhorizontal well is to provide big drainage area and small pressure drawdown due to the long penetration. Manysimulation and physical models of CO2-AGD process have been implemented
... Show MoreThe current research seeks to Analyze third intermediate chemistry book following sustainable development standards for academic year (2016-2017). To do this, a list of sustainable development standards that should be included in chemistry book was designed based on the previous studies. The first version of the list consisted of (50) sub-case divided into three standards (social, economic, and environmental) which was exposed to group of experts in teaching chemistry and teaching methods. The list has modified to (43) sub-case. The researcher followed the implicit and explicit meaning in his analysis: one for recording and repetition and the other for frequency. The result showed that third intermediate chemistry book has achieved (20)
... Show MoreThe tight gas is one of the main types of the unconventional gas. Typically the tight gas reservoirs consist of highly heterogeneous low permeability reservoir. The economic evaluation for the production from tight gas production is very challenging task because of prevailing uncertainties associated with key reservoir properties, such as porosity, permeability as well as drainage boundary. However one of the important parameters requiring in this economic evaluation is the equivalent drainage area of the well, which relates the actual volume of fluids (e.g gas) produced or withdrawn from the reservoir at a certain moment that changes with time. It is difficult to predict this equival
The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show More