Realizing the full potential of wireless sensor networks (WSNs) highlights many design issues, particularly the trade-offs concerning multiple conflicting improvements such as maximizing the route overlapping for efficient data aggregation and minimizing the total link cost. While the issues of data aggregation routing protocols and link cost function in a WSNs have been comprehensively considered in the literature, a trade-off improvement between these two has not yet been addressed. In this paper, a comprehensive weight for trade-off between different objectives has been employed, the so-called weighted data aggregation routing strategy (WDARS) which aims to maximize the overlap routes for efficient data aggregation and link cost issues in cluster-based WSNs simultaneously. The proposed methodology is evaluated for energy consumption, network lifetime, throughput, and packet delivery ratio and compared with the InFRA and DRINA. These protocols are cluster-based routing protocols which only aim to maximize the overlap routes for efficient data aggregation. Analysis and simulation results revealed that the WDARS delivered a longer network lifetime with more proficient and reliable performance over other methods.
A new distribution, the Epsilon Skew Gamma (ESΓ ) distribution, which was first introduced by Abdulah [1], is used on a near Gamma data. We first redefine the ESΓ distribution, its properties, and characteristics, and then we estimate its parameters using the maximum likelihood and moment estimators. We finally use these estimators to fit the data with the ESΓ distribution
This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re
... Show MoreIn spite of the disappearing of a clear uniform textbook for teaching ESP at different departments and different colleges in both scientific and humanistic studies, the practitioners at those departments and colleges have to teach translation as one of the important requirements to pass the English language exam. The lack of defined translation activities is a noticeable problem therefore; the problem of teaching translation is diagnosed in that the students lack the ability to comprehend the text in English language and other translation knowledge and skills.
The study aims to suggest a translation strategy and then find out the effect of the translation strategy on ESP learners’ achievement in translation. A sample of 50 stud
... Show MoreThe research aims to indicate the relationship between lean production tools included seven {constant improvement , and Just in time (JIT), and the production smoothing , and quality at the source, and standardized work, Visual management, and activities 5S } and Mass Customization strategy for the model (Pine & Gilomer, 1997) {collaborative, adaptive, cosmetic, transparent}, as well as providing a conceptual framework and applied for variables search to clarify how they will choose a Mass Customization strategy through the lean production tools, , and recognize the reality of the practices of Iraqi industries in such a field. Moreover, aims to highlight the positive aspects that accrue to companies a
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show MoreCalcareous nannofossils were documented from the upper part of the Cretaceous Balambo Formation in northern Iraq with the aim of determining an evidence for the Oceanic Anoxic Event. A detailed investigation of the calcareous nannofossils led to the identification of twenty-four species. Regarding these data, Discolithus litterarius (Górka, 1957) was identified at the studied interval with the age of Early Aptian.
Early Aptian assemblages are dominated by nannoconids that drop sharply within the D. litterarius nannofossil zone, which may be related to the nannoconid crisis recorded in the Early Aptian in the other parts of the world. This event is coincided by a decrease in CaCO3<
... Show MoreThis paper deals with prediction the effect of soil remoulding (smear) on the ultimate bearing capacity of driven piles. The proposed method based on detecting the decrease in ultimate bearing capacity of the pile shaft (excluding the share of pile tip) after sliding downward. This was done via conducting an experimental study on three installed R.C piles in a sandy clayey silt soil. The piles were installed so that a gap space is left between its tip and the base of borehole. The piles were tested for ultimate bearing capacity
according to ASTM D1143 in three stages. Between each two stages the pile was jacked inside the borehole until a sliding of about 200mm is achieved to simulate the soil remoulding due to actual pile driving. T