The study was conducted at the fields of the Department of Horticulture and Landscape Gardening, College of Agriculture Engineering Sciences, University of Baghdad. During the spring 2017. All the recommended practices were followed during experimentation. The experimental material consisted four Genotype it is Batraa, Btera, Mosulle, and local selection. The experiment was applied in Randomized Complete Block Design (RCBD). The objectives of Study were to estimate the some genetic parameters and path coefficient for some traits Okra, The results of statistical analysis for these genotypes were highly significant differences for all traits except the traits number of leaves, the number of main branches, the number of nodes before the first flower and Fruit length. Genetic analysis showed that the genetic variation for all traits was more than environment, High value of heritability was for yield per plant (95.4%) highly significant genotypic, phenotypic and environmental correlation between fruit number and plant yield (0.998, 0.990 and 0.905) respectively. The result of path coefficient the number of fruit had the highest positive direct effect (0.8551) followed by fruit width, fruit weight and plant high (0.0446, 0.0260 and 0.0106) respectively. It can be conclude the possibility of using the traits fruit weight yield per plant as criteria for selection to improve the yield of Okra.
Lower extremity exoskeletons can assist with performing particular functions such as gait assistance, and physical therapy support for subjects who have lost the ability to walk. This paper presents the analysis and evaluation of lightweight and adjustable two degrees of freedom, quasi-passive lower limb device to improve gait rehabilitation. The exoskeleton consists of a high torque DC motor mounted on a metal plate above the hip joint, and a link that transmits assistance torque from the motor to the thigh. The knee joint is passively actuated by spring installed parallel with the joint. The action of the passive component (spring) is combined with mechanical output of the motor to provide a good control on the designed exoskeleton whi
... Show MoreHTH Ahmed Dheyaa Al-Obaidi,", Ali Tarik Abdulwahid', Mustafa Najah Al-Obaidi", Abeer Mundher Ali', eNeurologicalSci, 2023
Recent studies have revealed some conflicting results about the health effects of caffeine. These studies are inconsistent in terms of design and population and source of consumed caffeine. In the current study, we aimed to evaluate the possible health effects of dietary caffeine intake among overweight and obese individuals.
In this cross-sectional study, 488 apparently healthy individuals with overweight and obesity were participated. Dietary intake was assessed by a Food Frequency Questionnaire (FFQ) and
This research deals with unusual approach for analyzing the Simple Linear Regression via Linear Programming by Two - phase method, which is known in Operations Research: “O.R.”. The estimation here is found by solving optimization problem when adding artificial variables: Ri. Another method to analyze the Simple Linear Regression is introduced in this research, where the conditional Median of (y) was taken under consideration by minimizing the Sum of Absolute Residuals instead of finding the conditional Mean of (y) which depends on minimizing the Sum of Squared Residuals, that is called: “Median Regression”. Also, an Iterative Reweighted Least Squared based on the Absolute Residuals as weights is performed here as another method to
... Show MoreSewage water is a mixture of water and solids added to water for various uses, so it needs to be treated to meet local or global standards for environmentally friendly waste production. The present study aimed to analyze the new Maaymyrh sewage treatment plant's quality parameters statistically at Hilla city. The plant is designed to serve 500,000 populations, and it is operating on a biological treatment method (Activated Sludge Process) with an average wastewater inflow of 107,000m3/day. Wastewater data were collected daily by the Mayoralty of Hilla from November 2019 to June 2020 from the influent and effluent in the (STP) new in Maaymyrh for five water quality standards, such as (BOD5), (COD), (TSS), (TP)
... Show MoreThe implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven
... Show MoreThis study was carried out at the Dept. Hortic. and Land.Gard., Coll. Agric. Eng.Sci., University of Baghdad during fall season of 2019-2020, in order to evaluate the effect of nutrient solution type under hydroponic system (NFT) on growth, yield and quality of broccoli Brassica oleracea var.italica. Two experiments were carried out which were the standard solution experiment (Cooper) and the alternative solution experiment (ABEER) prepared from fertilizers. Results revealed that the type of solution used in the hydroponics system had non significant effect on the leaves content of N,K, Mg, Fe, Cu, B, Chlorophyll, leaves number, root length, weight of the main heads, number of side heads were not significantly affected. 13nt, refl
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show More