Preferred Language
Articles
/
pRYzLIcBVTCNdQwCODtn
Increasing confidence in full field modelling and water flood planning for a giant reservoir under primary depletion through Material Balance modelling
...Show More Authors
Abstract<p>One of the principle inputs to project economics and all business decisions is a realistic production forecast and a practical and achievable development plan (i.e. waterflood). Particularly this becomes challenging in supergiant oil fields with medium to low lateral connectivity. The main objectives of the Production Forecast and feasibility study for water injection are:</p><p>1- Provide an overview of the total expected production profile, expected wells potential/spare capacity, water breakthrough timing and water cut development over time</p><p>2- Highlight the requirements to maintain performance, suggest the optimum development pattern</p><p>3- Increasing confidence in business decisions to develop the reservoir in question</p><p>The main tool used for these purposes is a sophisticated reservoir simulation software, namely CMG©, since it can predict reservoir behavior, honor physical constraints and capture the heterogeneity within the reservoir to accurately predict performance. However, the starting point for this kind of complicated studies needs to start from the basics, in order to understand the big picture and be able to plan properly for the scope to be delivered, hence, utilizing analytical tools like MBAL becomes quite necessary, if not crucial, to the success of full field modelling and choosing an optimum water flood pattern and design.</p><p>This paper covers the methodology for building the reservoir component utilizing a Material Balance model, of which the results will be used as an input to reservoir simulation to evaluate and accurately predict reservoir performance, which directly feeds into planning for water flooding projects and selection of an optimum flood pattern.</p><p>A Tank model was built at first to assess and understand the driving forces (energies) of the reservoir in question, utilizing pressure and production data from legacy wells, the prepared model is also supported by geological and petro physical studies to give representative results. Acquired Static Bottom Hole Pressures (SBHPs) in wells were used as anchor points for the tank pressure and to test the validity of the history match. Multiple analytical methods to QC the results and STOIIP volume were conducted, e.g. the Havlena-Odeh method.</p><p>This methodology has been tested successfully in the stated super giant oil field, in which the reservoir in question is a carbonate rock formation. An example of this is covered in the paper. It was concluded that utilizing a history matched and coherent MBAL model before conducting a detailed reservoir simulation study can save a lot of time and effort by providing guidance to the path which needs to be followed, and sheds light on the critical elements to be looked after. This has also helped to uncover the driving mechanisms and energies in the reservoir, hence allowing the engineer to plan for the necessary voidage replacement and water injection rates to sustain the reservoir pressure and pattern development. Another technical advantage of the described method is the higher sustainability of the model.</p><p>The suggested method, in combination with geological and petro physical information available, can be applied to majority of the reservoirs. This combination is paramount to ensure optimum time and planning that is followed for each reservoir development study that involves water flooding.</p>
Scopus Crossref
View Publication
Publication Date
Sun Mar 30 2014
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Design of Horizontal Well Program for Ajeel Field
...Show More Authors

Horizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Al-khwarizmi Engineering Journal
Numerical Simulation of Unsaturated Soil Water Flow from a Trickle Point System, Considering Evaporation and Root Water Uptake
...Show More Authors

This research was carried out to study the effect of plants on the wetted area for two soil types in Iraq and predict an equation to determine the wetted radius and depth for two different soil types cultivated with different types of plants, the wetting patterns for the soils were predicted at every thirty minute for a total irrigation time equal to 3 hr. Five defferent discharges of emitter and five initial volumetric soil moisture contents were used ranged between field capacity and wilting point were utilized to simulate the wetting patterns. The simulation of the water flow from a single point emitter was completed by utilized HYDRUS-2D/3D software, version 2.05. Two methods were used in developing equations to predict the domains o

... Show More
View Publication
Crossref
Publication Date
Mon Jul 01 2013
Journal Name
Journal Of Engineering
Water Hammer Arresters; Review Studies and Practical Experiments for Alternatives
...Show More Authors

The current research deals with practical studies that explain to the Iraqi consumer multiple instances about the phenomenon of water hammer which occur in the water pipeline operating with pressure. It concern a practical study of the characteristics of this phenomenon and economically harmful to the consumer the same time. Multiple pipe fittings are used aimed to reduce this phenomenon and its work as alternatives to the manufactured arresters that used to avoid water hammer in the sanitary installations, while the consumer did not have any knowledge as to the non-traded for many reasons, including the water pressure decreases in the networks and the use of consumer pumps to draw water directly from the network. Study found a numbe

... Show More
Publication Date
Wed Dec 11 2019
Journal Name
Journal Of The College Of Education For Women
Evaluation of Raw and Drinking Water for Diyala Governorate (2017)
...Show More Authors

The study examined the assessment of raw water and drinking water projects of  Diyala Governorate for the year 2017, amounting to (24) projects, The average per capita supply of potable water (0.396 m3 / day/person), which is less than the global standard for the average per capita of drinking water, and constitute water rumors within the network of water transport in the province (3%), and the water of raw and drinking value within the limits allowed to be used by Iraq and the global indicators of {Total acidity, alkaline, acidic function, chlorides, magnesium, Electrical conductivity, total soluble salts, sodium, potassium, sulfates, turbidity other than (raw water)}. While the index of calcium only a value higher than the limits

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 03 2017
Journal Name
Baghdad Science Journal
Construction and Operation of Solar Energy Dish for Water Heating
...Show More Authors

Construction and operation of (2 m) parabolic solar dish for hot water application were illustrated. The heater was designed to supply hot water up to 100 oC using the clean solar thermal energy. The system includes the design and construction of solar tracking unit in order to increase system performance. Experimental test results, which obtained from clear and sunny day, refer to highly energy-conversion efficiency and promising a well-performed water heating system.

View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Mon Jun 19 2023
Journal Name
Journal Of Engineering
Water Hammer Arresters; Review Studies and Practical Experiments for Alternatives
...Show More Authors

The current research deals with practical studies that explain to the Iraqi consumer multiple instances about the phenomenon of water hammer which occur in the water pipeline operating with pressure. It concern a practical study of the characteristics of this phenomenon and economically harmful to the consumer the same time. Multiple pipe fittings are used aimed to reduce this phenomenon and its work as alternatives to the manufactured arresters that used to avoid water hammer in the sanitary installations, while the consumer did not have any knowledge as to the non-traded for many reasons, including the water pressure decreases in the networks and the use of consumer pumps to draw water directly from the network. Study found a number of

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu May 01 2025
Journal Name
Case Studies In Thermal Engineering
Innovative pipe profile configurations for fast charging of phase change material in compact thermal storage systems for building heating applications
...Show More Authors

View Publication
Scopus (9)
Crossref (8)
Scopus Crossref
Publication Date
Fri Jul 10 2026
Journal Name
Mathematical And Computational Applications
A Regularized Numerical Solution to an Inverse Coefficient Problem for the Forced Vibrations of a Cantilever Beam Equation Under Nonlocal Conditions
...Show More Authors

This study tackles a fourth-order inverse problem involving a cantilever beam with nonlocal conditions to simultaneously calculate the beam’s displacement and an unknown time-dependent coefficient. A finite difference approach is suggested to discretize the hyperbolic fourth-order equation. A stability analysis for the proposed scheme is also provided. The indirect problem is the minimization of the misfit function. The goal of the minimization algorithm is to reduce the gap between the measured (noisy) data and the numerical computed solution provided by the model. To achieve stable results, Tikhonov’s regularization technique is employed, and two numerical test examples are shown to illustrate the suggested scheme's reliabilit

... Show More
View Publication
Crossref
Publication Date
Sun Jun 12 2016
Journal Name
Baghdad Science Journal
Measurement of Photon Buildup Factor for Samples of Iraqi Carbon Black Material
...Show More Authors

The buildup factor was measured after irradiating Iraq carbon black powder using each of and sources respectively, using mixing ratios 40% & 50% for thickness range . The results showed that the buildup factor depends on energy and has limited dependence on the mixing ratio. The QIFT program succeeded accenting for the experimental results even for expected values more than 4 m.f.p outside the thickness range.

View Publication Preview PDF
Crossref
Publication Date
Tue May 28 2019
Journal Name
Al-khwarizmi Engineering Journal
Heuristic D* Algorithm Based on Particle Swarm Optimization for Path Planning of Two-Link Robot Arm in Dynamic Environment
...Show More Authors

 Finding a path solution in a dynamic environment represents a challenge for the robotics researchers, furthermore, it is the main issue for autonomous robots and manipulators since nowadays the world is looking forward to this challenge. The collision free path for robot in an environment with moving obstacles such as different objects, humans, animals or other robots is considered as an actual problem that needs to be solved.  In addition, the local minima and sharp edges are the most common problems in all path planning algorithms. The main objective of this work is to overcome these problems by demonstrating the robot path planning and obstacle avoidance using D star (D*) algorithm based on Particle Swarm Optimization (PSO)

... Show More
View Publication Preview PDF
Crossref (8)
Crossref