This study deals with establishing the depositional environment of the Fatha Formation through facies analysis. It also deals with dividing the formation into units based on the rhythmic nature. Data from selected shallow wells near Hit area and deep wells at East Baghdad Oil field are used. Five major lithofacies are recognized in this study, namely, greenish grey marl, limestone, gypsum (and/or anhydrite), halite and reddish brown mudstone (with occasional sandstone).The limestone lithofacies is divided into three microfacies: Gastropods bioclastic wackestone microfacies, Gastropods peloidal bioclastic packstone, and Foraminiferal packstone microfacies.The lithofacies of the Fatha are nested in a rhythmic pattern or what is known as sh
... Show MoreSpatial data analysis is performed in order to remove the skewness, a measure of the asymmetry of the probablitiy distribution. It also improve the normality, a key concept of statistics from the concept of normal distribution “bell shape”, of the properties like improving the normality porosity, permeability and saturation which can be are visualized by using histograms. Three steps of spatial analysis are involved here; exploratory data analysis, variogram analysis and finally distributing the properties by using geostatistical algorithms for the properties. Mishrif Formation (unit MB1) in Nasiriya Oil Field was chosen to analyze and model the data for the first eight wells. The field is an anticline structure with northwest- south
... Show MoreThis paper provides an attempt for modeling rate of penetration (ROP) for an Iraqi oil field with aid of mud logging data. Data of Umm Radhuma formation was selected for this modeling. These data include weight on bit, rotary speed, flow rate and mud density. A statistical approach was applied on these data for improving rate of penetration modeling. As result, an empirical linear ROP model has been developed with good fitness when compared with actual data. Also, a nonlinear regression analysis of different forms was attempted, and the results showed that the power model has good predicting capability with respect to other forms.
Visualization of subsurface geology is mainly considered as the framework of the required structure to provide distribution of petrophysical properties. The geological model helps to understand the behavior of the fluid flow in the porous media that is affected by heterogeneity of the reservoir and helps in calculating the initial oil in place as well as selecting accurate new well location. In this study, a geological model is built for Qaiyarah field, tertiary reservoir, relying on well data from 48 wells, including the location of wells, formation tops and contour map. The structural model is constructed for the tertiary reservoir, which is an asymmetrical anticline consisting of two domes separated by a saddle. It is found that
... Show Morewind load coefficient
Concentrated research topic in the study of variables key to the work of offices of inspectors Amyin ، a (re- design function، and performance Organisational ) and took this message to know the nature of the relationship and the impact of the dimensions of the re- design function as a variable interpretative through its dimensions، is ( the diversity of skill، selecting the task ، the importance of task، autonomy، feedback )، and performance Organisational variable responsive through two dimensions are ( effectiveness ، efficiency )، and in order to test the research hypotheses were absorbed variables in the form of a questionnaire and were questionnaire primary means of gatheri
... Show MoreThe research aims to verifying the tax exemptions granted in accordance with the Iraqi tax legislations, showing their suitability for basic tax rules, and identifying their role to reduce the tax evasion phenomenon and the negative effects resulting therefrom, which arerepresented by a decrease in the proceeds of tax revenue and therefore leadings to a reduction of public revenues of the state. Also, the research tries to identify the ways to reduce cases of tax evasion due to their reflection positively on the public budgetof the state. The data of the research was collected through two models of questionnaires distributed to a sample of taxpayers from some professions and a sample of the tax administration staff. The research has reac
... Show MoreThis study utilizes streamline simulation to model fluid flow in the complex subsurface environment of the Mishrif reservoir in Iraq's Buzurgan oil field. The reservoir faces challenges from high-pressure depletion and a substantial increase in water cut during production, prompting the need for innovative reservoir management. The primary focus is on optimizing water injection procedures to reduce water cuts and enhance overall reservoir performance. Three waterflooding tactics were examined: normal conditions without injectors or producers, normal conditions with 30 injectors and 80 producers and streamline simulation using the frontsim simulator. Three main strategies were employed to streamline water injection in targeted areas.
... Show MoreThe aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For
... Show MoreBored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000
... Show More