The Makhoul Dam project proposed to be established is considered one of the strategic projects in Iraq as it works to insurance large quantity of water spare in flood seasons, increase the storage capacity of the dams in Iraq, as well as increase food security. The Makhool Dam is located on Tigris River in Salah al-Din Governorate, and 8 km south of the meeting point of the Tigris River with the Lower Zab River. The lake area is about 256 km2. In this research, a mathematical model was prepared by using HEC-RAS Two Dimension Software to analyze the velocity patterns and water depths inside makhool dam reservoir at the highest operational water elevation, based on the designs prepared by the Iraqi Ministry of Water Resources which is 150.25 m.a.s.l. The present study was conducted to investigate velocity patterns with the difference outlet discharges and changing the operation of the spillway gates within Makhool reservoir. The velocities were predicted and evaluated by utilizing modeling efficiency was 99.7%. This shows that the velocity distribution can be described the pattern with a good accuracy. The obtained velocities were ranged from -0.5 m/s to 5.1 m/s, the maximum velocities were near the dam axis.
Increasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off permeab
... Show MoreIntegrated reservoir rock typing in carbonate reservoirs is a significant step in reservoir modelling. The key purpose of this study is the identification of integrated rock types in the Sarvak Formation of an Iranian oilfield. In this study, electrofacies (EFAC) analysis of the Sarvak reservoir was done in detail to determine the reservoir quality and rock types of the Sarvak Formation in the studied field. The core data and conventional petrophysical logs were used for rock typing. Some petrophysical logs such as porosity, sonic, neutron, density, and Photo electric factor were applied as input data for electrofacies analysis. Multi-Resolution Graph-Based Clustering was used among six approaches, resulting in four electrofacies af
... Show MoreIncreasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off
... Show MoreMishrif Formation is the main reservoir in Amara Oil Field. It is divided into three units (MA, TZ1, and MB12). Geological model is important to build reservoir model that was built by Petrel -2009. FZI method was used to determine relationship between porosity and permeability for core data and permeability values for the uncored interval for Mishrif formation. A reservoir simulation model was adopted in this study using Eclipse 100. In this model, production history matching executed by production data for (AM1, AM4) wells since 2001 to 2015. Four different prediction cases have been suggested in the future performance of Mishrif reservoir for ten years extending from June 2015 to June 2025. The comparison has been mad
... Show MoreImage classification is the process of finding common features in images from various classes and applying them to categorize and label them. The main problem of the image classification process is the abundance of images, the high complexity of the data, and the shortage of labeled data, presenting the key obstacles in image classification. The cornerstone of image classification is evaluating the convolutional features retrieved from deep learning models and training them with machine learning classifiers. This study proposes a new approach of “hybrid learning” by combining deep learning with machine learning for image classification based on convolutional feature extraction using the VGG-16 deep learning model and seven class
... Show MoreImage classification is the process of finding common features in images from various classes and applying them to categorize and label them. The main problem of the image classification process is the abundance of images, the high complexity of the data, and the shortage of labeled data, presenting the key obstacles in image classification. The cornerstone of image classification is evaluating the convolutional features retrieved from deep learning models and training them with machine learning classifiers. This study proposes a new approach of “hybrid learning” by combining deep learning with machine learning for image classification based on convolutional feature extraction using the VGG-16 deep learning model and seven class
... Show MoreHistory matching is a significant stage in reservoir modeling for evaluating past reservoir performance and predicting future behavior. This paper is primarily focused on the calibration of the dynamic reservoir model for the Meshrif formation, which is the main reservoir in the Garraf oilfield. A full-field reservoir model with 110 producing wells is constructed using a comprehensive dataset that includes geological, pressure-volume-temperature (PVT), and rock property information. The resulting 3D geologic model provides detailed information on water saturation, permeability, porosity, and net thickness to gross thickness for each grid cell, and forms the basis for constructing the dynamic reservoir model. The dynamic reservoir mo
... Show MoreIn this research velocity of moving airplane from its recorded digital sound is introduced. The data of sound file is sliced into several frames using overlapping partitions. Then the array of each frame is transformed from time domain to frequency domain using Fourier Transform (FT). To determine the characteristic frequency of the sound, a moving window mechanics is used, the size of that window is made linearly proportional with the value of the tracked frequency. This proportionality is due to the existing linear relationship between the frequency and its Doppler shift. An algorithm was introduced to select the characteristic frequencies, this algorithm allocates the frequencies which satisfy the Doppler relation, beside that the tra
... Show MoreVaried uses of international rivers in the past few decades dramatically, resulting in this multiplicity of uses and all associated with it for the occurrence of freshwater scarcity activities, and thus an increase in conflicts and disputes around on the rights of each of the riparian countries to benefit from the waters of the river at various purposes, particularly the establishment of dams on some of them as is the case (Renaissance Ethiopian) big impact on downstream countries Dam (Egypt and Sudan), due to the Oukuahma at the end of the Nile Valley made them vulnerable to environmental fluctuations, political crises facing the Nile basin countries, and any reduction in the proportion of water is not only the Nile River, but for all r
... Show MoreAccurate computation of the roughness coefficient is important in the studies of open channel flow. To measure and identify the hydraulic characteristics of the flow system, the model simulation is necessary to study and get the results of the hydraulic properties to specify Manning coefficient of the Euphrates River. In this study, the reach is extended along the Euphrates River from Haditha Dam to Ramadi Barrage with a distance of 169km. The HEC-RAS model was implemented to simulate the flow within the study reach. The geometry of the river was represented by more than two hundred cross-sections surveyed in 2013 and 2021. The model was calibrated using some observed discharges at the Heet gage station for records of th
... Show More