The instant global trend towards developing tight reservoir is great; however, development can be very challenging due to stress and geomechanical properties effect in horizontal well placement and hydraulic fracturing design. Many parameters are known to be important to determine the suitable layer for locating horizontal well such as petrophysical and geomechanical properties. In the present study, permeability sensitivity to stress is also considered in the best layer selection for well placement. The permeability sensitivity to the stress of the layers was investigated using measurements of 27 core sample at different confining stress values. 1-D mechanical earth model (MEM) was built and converted to a 3-D full-field geomechanical model to reach perfect layer choice. The analysis of results has diagnosed the maximum horizontal stress direction of NE-SW as determined using both Fullbore Formation Micro Imager FMI and sonic scanner anisotropy analysis. The effect of porosity and permeability compaction as a result of stress changes while reservoir depletion is including on the reservoir simulation model. The choice of best layer and optimum design criteria for hydraulic fracturing is done in the current study using a compaction simulation model with the results of available measurements of geomechanical properties. The results of the simulation model show that the formation sensitivity to stress is an important factor for detecting a suitable layer for horizontal wells placement. The results of MEM indicate that horizontal stress difference (Δσ) and unconfined compressive strength (UCS) are the most important factors among geomechanical parameters affected the layer selection. From simulation results, it was found that 225 to 275 m fracture half-length gives a higher increment in oil production. The optimum number of fracture stages is noticed to be 8 to 10 stages after which the increment in production will reduce.
This effort is related to describe and assess the performance of the Iraqi cement sample planned for oil well-cementing jobs in Iraq. In this paper, major cementing properties which are thickening time, compressive strength, and free water in addition to the rheological properties and filtration of cement slurry underneath definite circumstances are experimentally tested. The consequences point to that the Iraqi cement after special additives encounter the requests of the API standards and can consequently is used in cementing jobs for oil wells. At this research, there is a comparative investigation established on experimental work on the effectiveness of some additives that considered as waste materials which are silica fume, baux
... Show MoreThis effort is related to describe and assess the performance of the Iraqi cement sample planned for oil well-cementing jobs in Iraq. In this paper, major cementing properties which are thickening time, compressive strength, and free water in addition to the rheological properties and filtration of cement slurry underneath definite circumstances are experimentally tested. The consequences point to that the Iraqi cement after special additives encounter the requests of the API standards and can consequently is used in cementing jobs for oil wells. At this research, there is a comparative investigation established on experimental work on the effectiveness of some additives that considered as waste materials which are silica fume, bauxite,
... Show MoreOccurrence the heavy metals in water is one of the most important concerns. may cause savior health problems. In this work we made an attempt to know the quantity of six heavy metals in groundwater in different locations of Baghdad city. Examinations were made on groundwater of the review region to assess the heavy metals. Groundwater samples were gathered and analyzed utilizing Atomic Absorption Spectrophotometer for their Manganese, Iron, Zinc, Cadmium, Copper and Lead content and their levels compared with World Health Organization (WHO) specified maximum contaminant level. In order to accomplish this, water samples were obtained from 10 randomly selected wells in the region, in February and August, 2016. The study showed that the ground
... Show MoreThis research presents a method for calculating stress ratio to predict fracture pressure gradient. It also, describes a correlation and list ideas about this correlation. Using the data collected from four wells, which are the deepest in southern Iraqi oil fields (3000 to 6000) m and belonged to four oil fields. These wells are passing through the following formations: Y, Su, G, N, Sa, Al, M, Ad, and B. A correlation method was applied to calculate fracture pressure gradient immediately in terms of both overburden and pore pressure gradient with an accurate results. Based on the results of our previous research , the data were used to calculate and plot the effective stresses. Many equations relating horizontal effective stress and vertica
... Show MoreBackground: Determination of local bone mineral density (BMD) immediately after implant insertion play an important role in implant success rate, may offer comprehensive description of the bone, and give enough information to the surgeon prior to implant insertion and at follow up status. The aim of the present study is to evaluate the changes of local bone density in the dental implant recipient sites by using computerized tomography. Material and method: The sample consisted of (20) dental implants recipient sites, bone density assessment was done twice, immediately after implants insertion and after six months. Results: The mean HU of the bone around the implant insertion site, immediately after implant placement was 552.28 HU, and inc
... Show More<span lang="EN-US">Proper employment of Hybrid Wind/ PV system is often implemented near the load, and it is linked with the grid to study dynamic stability analysis. Generally, instability is because of sudden load demand variant and variant in renewable sources generation. As well as, weather variation creates several factors that affect the operation of the integrated hybrid system. So this paper introduces output result of a PV /wind via power electronic technique; DC chopper; that is linked to Iraqi power system to promote the facilitating achievement of Wind/ PV voltage. Moreover, PSS/E is used to study dynamic power stability for hybrid system which is attached to an effective region of Iraqi Network. The hybrid system
... Show MoreIn order to reduce hydrostatic pressure in oil wells and produce oil from dead oil wells, laboratory rig was constructed, by injecting LPG through pipe containing mixture of two to one part of East Baghdad crude oil and water. The used pressure of injection was 2.0 bar, which results the hydrostatic pressure reduction around 246 to 222 mbar and flow rate of 34.5 liter/hr fluid (oil-water), at 220 cm injection depth. Effects of other operating parameters were also studied on the behavior of two phase flow and on the production of oil from dead oil wells.
Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of
... Show More